Loading...
HomeMy WebLinkAboutSuncore Care Inc +++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ Process from Point /Station 13.000 to Point /Station 14.000 * * ** SUBAREA FLOW ADDITION * * ** RESIDENTIAL(1 acre lot) Decimal fraction soil group A = 1.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 0.000 SCS curve number for soil(AMC 2) = 32.00 Pervious ratio(Ap) = 0.8000 Max loss rate(Fm)= 0.782(In /Hr) Time of concentration = 6.15 min. Rainfall intensity = 4.804(In /Hr) for a 25.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q =KCIA) is C = 0.768 Subarea runoff = 3.573(CFS) for 1.050(Ac.) Total runoff = 24.158(CFS) Effective area this stream = 6.55(Ac.) Total Study Area (Main Stream No. 1) = 6.55(Ac.) Area averaged Fm value = 0.706(In /Hr) +++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ Process from Point /Station 14.000 to Point /Station 15.000 * * ** PIPEFLOW TRAVEL TIME (Program estimated size) * * ** Upstream point /station elevation = 6.860(Ft.) Downstream point /station elevation = 6.670(Ft.) Pipe length = 39.00(Ft.) Manning's N = 0.012 No. of pipes = 1 Required pipe flow = 24.158(CFS) Nearest computed pipe diameter = 30.00(In.) Calculated individual pipe flow = 24.158(CFS) Normal flow depth in pipe = 19.92(In.) Flow top width inside pipe = 28.34(In.) Critical Depth = 20.09(In.) Pipe flow velocity = 6.99(Ft /s) Travel time through pipe = 0.09 min. Time of concentration (TC) = 6.25 min. +++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ Process from Point /Station 14.000 to Point /Station 15.000 * * ** CONFLUENCE OF MAIN STREAMS * * ** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area = 6.550(Ac.) Runoff from this stream = 24.158(CFS) Time of concentration = 6.25 min. Rainfall intensity = 4.761(In /Hr) Area averaged loss rate (Fm) = 0.7060(In /Hr) Area averaged Pervious ratio (Ap) = 0.7220 Program is now starting with Main Stream No. 2 Process from Point /Station 20.000 to Point /Station 21.000 * * ** INITIAL AREA EVALUATION * * ** 3.5 - 3.5 3 3 I 2.5 2.5 U w 2 C.) 2 2 0 L.1 Ior) YR r 1.52. -J 4„ 1.5 1.5 rr to-YR r 1. t </ ' 1 I 0.5 0.5 • 0' 0 2 5 10 25 50 - RETURN PERIOD IN YEARS 941- &SCI r �'er�e r are c- NOTE' �TCS I I. FOR INTERMEDIATE RETURN PERIODS PLOT 10 -YEAR AND 100 -YEAR ONE HOUR VALUES FROM MAPS, 2S �K THEN CONNECT POINTS AND READ VALUE FOR DESIRED RETURN PERIOD. FOR EXAMPLE GIVEN 10-YEAR ONE HOUR ■ 0.95 AND 100 -YEAR CNE HOUR 61.6e, 25 -YEAR ONE HOUR , 1.I8 ". REFERENCE'NOAA ATLAS >Z, VOLUME =C- CAL.,1973 RAINFALL DEPTH VERSUS SAN BERNARDINO COUNTY RETURN PERIOD FOR HYDROLOGY MANUAL PARTIAL DURATION SERIES D - FIGURE D -2 1�