HomeMy WebLinkAboutBaseline Ave Sewer Study Report - 2002w
The Power to Change
The Power to Build
June 19, 2002
Mr. Jim Robinson, PE
City of Fontana
Engineering Division
8285 Sierra Avenue, Ste 110
Fontana, California 92335
SUBJECT: Baseline Avenue Sewer Study Report (Citrus Avenue to City Limits)
Dear Mr. Robinson:
Berryman & Henigar is pleased to submit this draft Baseline Avenue Sewer Study for your
review and comment. This report will provide the City of Fontana with the necessary information
to make decisions on the installation of new sewer facilities as well as related sewer upgrades in
the subject area. We are still in the process of incorporating newly proposed sewer projects in
the area, including those in Baseline Avenue west of Citrus and South Highland Avenue. We
expect those projects to be fully analyzed in the final version of this report. If you have any
questions regarding this sewer study, please feel free to call me.
OR
Ni Sincerely,
Steve Smith, P. E.
Berryman & Henigar
irr
Cc: File /an /sm
J
PA15945 \MS Word Files \Sewer Study \020619 Sewer Report.doc
Berryman & Henigar
0,
I
Scope of Work
Berryman & Henigar has been retained by the City of Fontana (City) to evaluate the sewer
requirements for a 640 -acre tributary area to Baseline Avenue. The project area is bound by
Citrus Avenue and the City limits (Palmetto Avenue) in the east -west direction; and South
PR Highland and Baseline Avenues in the north -south direction.
The purpose of this study is to identify and propose new facilities in these streets based on
City's Sewer Master Plan flow projection rates at build -out. The City has also requested
Berryman & Henigar to determine whether the existing sewer facilities within the project limits
are able to accommodate sewer flows at build -out. Recommendations will be made to upgrade
the existing sewer system if necessary. This letter report will provide the information to allow the
City to make the necessary improvement decisions.
Evaluation Criteria and Methodology
According to City's most recent land use designations, the project study area is comprised of
three land use (LU) categories, single - family residential (R -SF), general commercial (C -G), and
public facility (P -PF). The City's Master Sewer Plan Update (September 2000) designated
sewage flow generation factors in relation to all land use categories. Exhibit A presents the
City's Sewage Generation Factors in tabular format. Table 1 summarizes the relevant
. generation rates corresponding to the project land use designations.
u_ . c•_.. rl.. , I%- �.+.—n Om +gsC uui+hln Prniart Limits
L'
1 ault9 1 -'Juwa a rw..
Land Use
%L U U - . ... .................
Equivalent DU /Acre
. — - -- - ---- ---
Flow Per DU
Flow ( allons /da er Acre
R -SF
5.00
279
1395
C -G
5.38
-
1500
P -PF
5.38
-
1500
The proposed sewer main sizes were determined based on the City's peak daily flow (PDF)
calculation formula shown below:
PDF = 2.5(Q
Where Q is the average daily flow (ADF) expressed in million gallons per day (mgd).
All proposed sewers presented in this report meet the City's design requirements in term of:
1. Minimum pipe slope between manholes of one percent (1 %)
2. Minimum pipe size of 8 inches
3. Minimum pipe depth of 8 feet
4. Minimum flow velocity of 2.5 feet per second (fps)
5. Maximum spacing between each manhole is 350 feet
6. Depth of flow to depth of pipe diameter ratio (D /d) must be less than 0.50 for main
diameters less than 12 inches; and 0.75 for pipe diameters greater than 12 inches
7. All sewer main will be vitrified clay pipe (VCP) using a Manning's 'N' value of 0.013
p. \15945 \MS Word Files \Sewer Study \020619 Sewer Report.doc
Berryman & Henigar
L
Sewer System Evaluation
The general flow pattern follows the natural drainage topography. The proposed system is
designed to direct flow towards the south /southwesterly corner of the project site. Drainage
basins are divided among streets aligned in the north /south direction. Once the flow reaches the
junctions at the southern limits, the flow continues westerly connecting into an existing 18 -inch
vitrified clay pipe (VCP) at the intersection of Citrus and Baseline Avenue. A tabular summary of
flow calculations based on land use is shown in Exhibit B. A graphical illustration of the
recommendation is shown in Exhibit C.
Citrus Avenue
It is estimated the flow generated north of Highway 30/210 is approximately 6 mgd (See Exhibit
D). Part of the tributary flow from the north will be directed into a system on Citrus Avenue via
an existing 21" VCP. At the intersection of Citrus and Los Cedros Avenue, the 21" VCP bends
and directs flow westerly. The proposed 8" VCP on Walnut Avenue, east of Citrus, will be
directed southward connecting into an existing 15 -inch VCP on Citrus Avenue. While the
existing 15" VCP on Citrus Avenue is over designed, it is not necessary to replace the existing
sewer system.
Oleander, Cypress, and Juniper Avenues
Based on review of the current system, the existing 8 -inch VCP system along Oleander Avenue
south of Walnut Street is able to accommodate the projected volume only if flow east of
Oleander is diverted into a new drainage basin on Cypress. It is recommended that the new
facilities on Cypress Avenue south of Walnut Street be 10 inches in diameter. Existing flow
generated along Sierra Avenue entering the Juniper basin will be directed into an existing 8 -inch
VCP south of Baseline Avenue. The proposed 8 -inch collection system on Juniper north of
Baseline will be conveyed westerly into the proposed 10 -inch VCP on Baseline Avenue.
Mango and Sierra Avenues
With the exception of seven parcels east of Sierra and an approximate 47.5 AC west of
Palmetto Ave, all other residential discharge between Sierra and Mango Avenues will flow
easterly towards an existing 8 -inch VCP system on Mango Avenue. At build out, it is
recommended the existing 8 -inch VCP south of MiCallef Street be upgraded to a 12 -inch VCP.
The projected flow west of Sierra Avenue will require an 8 -inch VCP system to be installed
connecting into an existing 8 -inch main near the southern end of Sierra Avenue.
Baseline Avenue
As indicated in Exhibit C, 18 -inch, 15 -inch, and 10 -inch VCPs are recommended along Baseline
Avenue to convey flow westerly into an existing 18 -inch VCP at the intersection of Citrus and
Baseline Avenue. An 8 -inch VCP collecting flow between Sierra and Mango Avenues along
Baseline is recommended to direct flow easterly. For future development along the
northwestern side of Baseline and Palmetto Avenue, another 8 -inch VCP collecting flow
between Mango and Palmetto Avenues along Baseline is recommended to direct flow easterly
toward Palmetto Avenue. All flows currently flowing southerly past Baseline Avenue will be
diverted westerly towards Citrus Avenue.
P:\15945 \MS Word Files \Sewer Study\020619 Sewer Report.doc 2 Berryman & Henigar
Summary of Recommendations
Shown below is a summary of the improvements to be made on each street within the project
area:
♦ Juniper Avenue
o 3,000 linear feet of 8 inch VCP
o 9 new manholes
♦ Sierra Avenue
o 3,200 linear feet of 8 inch VCP
.� o 11 new manholes
♦ Mango Avenue
o 1,300 linear feet of 12 inch VCP upgrade
♦ South Highland Avenue
o 2,450 linear feet of 8 inch VCP
o 7 new manholes
♦ Walnut Street
o 1,900 linear feet of 8 inch VCP
o Abandon 270 linear feet of 10" VCP
o 6 new manholes
♦ Baseline Avenue
o 1500 linear feet of 8 inch VCP
o 1,320 linear feet of 10 inch VCP
o 1,320 linear feet of 15 inch VCP
o 1,400 linear feet of 18 inch VCP
o 18 new manholes
P: \15945 \MS Word Files \Sewer Study\020619 Sewer Report.doc
3 Berryman & Henigar
♦ Citrus Avenue
o 1500 linear feet of 8 inch VCP
o 4 new manholes
♦ Oleander Avenue
o 600 linear feet of 8 inch VCP
o 2 new manholes
♦ Cypress Avenue
o 600 linear feet of 8 inch VCP
o 2,650 linear feet of 10 inch VCP
o 9 new manholes
♦ Juniper Avenue
o 3,000 linear feet of 8 inch VCP
o 9 new manholes
♦ Sierra Avenue
o 3,200 linear feet of 8 inch VCP
.� o 11 new manholes
♦ Mango Avenue
o 1,300 linear feet of 12 inch VCP upgrade
♦ South Highland Avenue
o 2,450 linear feet of 8 inch VCP
o 7 new manholes
♦ Walnut Street
o 1,900 linear feet of 8 inch VCP
o Abandon 270 linear feet of 10" VCP
o 6 new manholes
♦ Baseline Avenue
o 1500 linear feet of 8 inch VCP
o 1,320 linear feet of 10 inch VCP
o 1,320 linear feet of 15 inch VCP
o 1,400 linear feet of 18 inch VCP
o 18 new manholes
P: \15945 \MS Word Files \Sewer Study\020619 Sewer Report.doc
3 Berryman & Henigar
H
I Exhibit A - CITY OF FONTANA SEWAGE FLOW GENERATION FACTORS
f1
0
rye
C'
� i T
Land Use
Description
Equivalent DU
per acre
Flow per
Dwelling Unit
Flow per Net Acre
(gpad)
R -E
Residential Estate
1
279
279
R -L
Low Density Residential
3
279
837
R -IE
Industrial Estate
3
279
837
R -PC
Residential Planned Community
5
279
1395
R -SF
Single Family Residential
5
279
1395
R -ML
Medium -Low Density Residential
5
279
1395
R -M
Medium Density Residential
7
279
1953
R -MH
Medium- High Density Residential
9
279
2511
C -O
Office Professional
5.38
--
1500
C -C
Community Commercial
5.38
--
1500
C -G
General Commercial
5.38
--
1500
C -R
Regional Commercial
5.38
--
1500
C
Commercial 2005 and after)
10.76
--
3000
CMU
Community Mixed Use
5.38
--
1500
RMU
Regional Mixed Use
5.38
--
1500
I
Industrial
5.38
--
1500 before 2006
I -P
Planned Industrial
10.76
--
3000
I -G
General Industrial
10.76
--
3000
I -SP
Industrial Specific Plan
10.76
--
3000
P -UC
Utility Corridor
0
--
0
P -R
Recreational
72
--
200
P -S
School
8.60
--
2400
P -PF
Public Facility
5.38
--
1500
P -1
Institutional
16.13
--
4500
OS -N
Natural Area
0
--
0
OS -R
Resource Area
0
--
0
Reference: City of Fontana Sewer Master Plan Update (September 2000), Table 2.1
r,
Exhibit A
020619 Fontana Sewer.xis
Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS)
Citrus Avenue (North of Walnut)"
— Based on City of Fontana's Sewer Master Plan (1998), Flow from Tributary Area North of Highland Avenue is Approximately 6 MGD.
Citrus Avenue (South of Walnut)
Tributary Area (Ac)
Land Use
FIOWIAC
Average Flow
Peak Flow (mgd)
i-roposed Sewer Main
Description
Tributary Area (Ac)
Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in)
North of South Highland
10.9
C -G
1500
16,335
0.059
8
South of South Highland
8.1
C -G
1500
12,210
0.045
8
East of Citrus
9.2
C -G
1500
13,815
0.051
8
East of Citrus
16.3
R -SF
1395
22,739
0.080
8
West of Oleander
Total (mgd)
R -SF
1395
2.67
0.101
8
Walnut East of Oleander
Pipe Slope (ft/ft)
R -SF
1395
0.01
0.028
8
Walnut East of Oleander
VCP N -value
P -PF
1500
0.013
0.094
8
Pipe Diameter (in)
Existing VCP
21
Flow Depth (in)
11.68
Flow Velocity (fps)
6.88
D/d ( %)
56%
— Based on City of Fontana's Sewer Master Plan (1998), Flow from Tributary Area North of Highland Avenue is Approximately 6 MGD.
Citrus Avenue (South of Walnut)
Oleander Avenue (North of Walnut)
Description
Tributary Area (Ac)
Land Use
FIOWIAC
Average Flow
Peak Flow (mgd)
i-roposed Sewer Main
Description
Tributary Area (Ac)
Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in)
East of Citrus
30.7
R -SF
1395
42,771
0.142
8
East of Citrus
2.2
C -G
1500
3,315
0.014
8
Walnut East of Citrus
5.1
R -SF
1395
7,156
0.028
8
East of Oleander
Total (mgd)
1 P -PF
1500
0.053
0.085
8
West of Oleander
Pipe Slope (ft/ft)
R -SF
1395
0.01
0.101
8
Walnut East of Oleander
VCP N -value
R -SF
1395
0.013
0.028
8
Walnut East of Oleander
Pipe Diameter (in)
P -PF
1500
8
0.094
8
Flow Depth (in)
1.41
Flow Velocity (fps)
1.98
Oleander Avenue (North of Walnut)
Description
Tributary Area (Ac)
Land Use
Flow /Ac
(gpad)
Average Flow
(gpd)
Peak Flow (mgd)
Proposed Sewer Main
(in)
North of South Highland
10.5
C -G
1500
15,750
0.057
8
South of South Highland
4.6
C -G
1500
6,900
0.027
8
West of Oleander
4.7
C -G
1500
7,050
0.028
8
East of Oleander
2.9
C -G
1500
4,380
0.018
8
East of Oleander
16.1
1 P -PF
1500
24,210
0.085
8
West of Oleander
21.1
R -SF
1395
29,435
0.101
8
Walnut East of Oleander
5.1
R -SF
1395
7,170
0.028
8
Walnut East of Oleander
18.2
P -PF
1500
27,330
0.094
8
Total (mgd)
Pipe Slope (ft/ft)
VCP N -value
Pipe Diameter (in)
Flow Depth (in)
Flow Velocity (fps)
D/d ( %)
0.122
0.02
0.013
8
3.51
4.62
44 °h
B -1
Exhibit B
020619 Fontana Sewer.xis B
S
Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS)
Oleander Avenue (South of Walnut)
' Cvoress Avenue (North of Walnut)
Description
Tributary Area (Ac)
Land Use
Flow /Ac
Average Flow
Peak Flow (mgd)
Proposed Sewer Main
Description
Tributary Area (Ac)
Land Use
I (gpad)
(gpd)
Peak Flow (mgd)
(in)
West of Oleander
34.0
R -SF
1395
47,430
0.156
10
East of Oleander
32.5
R -SF
1395
45,296
0.150
12
West of Cypress
Total (mgd)
0.093
1500
24,270
Pipe Slope (f /ft)
0.02
East of Cypress
2.8
VCP N -value
0.013
4,230
0.017
Pipe Diameter (in)
8
20.0
R -SF
Flow Depth (in)
2.88
0.096
8
Flow Velocity (fps)
4.19
R -SF
1395
12,081
0.045
8
Walnut East of Cypress
2.8
R -SF
1395
' Cvoress Avenue (North of Walnut)
Description
Tributary Area (Ac)
Land Use
Flow /Ac
(gpad)
Average Flow
(gpd)
Peak Flow (mgd)
Proposed Sewer Main
(in)
North of South Highland
9.4
C -G
1500
14,100
0.052
8
South of South Highland
2.4
C -G
1501
3,602
0.015
8
West of Cypress
2.9
C -G
1500
4,350
0.018
8
West of Cypress
16.2
P -PF
1500
24,270
0.085
8
East of Cypress
2.8
C -G
1500
4,230
0.017
8
East of Cypress
20.0
R -SF
1395
27,858
0.096
8
Walnut East of Cypress
8.7
R -SF
1395
12,081
0.045
8
Walnut East of Cypress
2.8
R -SF
1395
3,948
0.016
8
Total (mgd)
Pipe Slope (ft/ft)
VCP N -value
Pipe Diameter (in)
Flow Depth (in)
Flow Velocity (fps)
D/d (%)
0.094
0.02
0.013
8
3.07
4.32
1 38%
W Cypress Avenue (South of Walnut)
S E
Exhibit B
Flow /Ac
Average Flow
Proposed Sewer Main
Description
Tributary Area (Ac)
Land Use
I (gpad)
(gpd)
Peak Flow (mgd)
(in)
West of Cypress
31.8
R -SF
1395
44.305
0.147
8
East of Cypress
30.2
R -SF
1395
42,115
0.140
8
Total (mgd)
0.086
Pipe Slope (it/ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
10
Flow Depth (in)
3.36
Flow Velocity (fps)
3.20
D/d ( %)
1 34%
S E
Exhibit B
020619 Fontana Sewer.xls B
Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS)
Juniper Avenue (North of Walnut)
Description
Tributary Area (Ac)
Land Use
Flow /Ac
(gpad)
Average Flow
(gpd)
Peak Flow (mgd)
Proposed Sewer Main
(in)
North of South Highland
2.8
R -SF
1395
3,906
0.016
8
North of South Highland
7.3
R -SF
1395
10,184
0.038
8
North of South Highland
4.3
C -G
1501
6,454
0.025
9
North of South Highland
5.7
C -G
1500
8,565
0.033
8
South of South Hi hland
9.1
C -G
1500
13,620
0.050
8
North of South Highland
7.1
C -G
1500
10,620
0.040
8
North of South Highland
6.8
C -G
1500
10,200
0.039
8
West of Juniper
2.0
C -G
1501
3,002
0.013
8
West of Juniper
4.8
C -G
1500
7,155
0.028
8
West of Juniper
14.3
R -SF
1395
19,949
0.071
8
East of Juniper
33.0
R -SF
1395
46,035
0.152
8
Walnut East of Juniper
7.0
R -SF
1395
9,793
0.037
8
Total (mgd)
Pipe Slope (ft/ft)
VCP N -value
Pipe Diameter (in)
Flow Depth (in)
Flow Velocity (fps)
D/d ( %)
0.149
0.02
0.013
10
3.55
4.83
36 0 /4
P i ll Juniper Avenue (South of Walnut)
I
ad
Sierra Avenue
Flow/AC
verage Flow
Proposed Sewer main
Description
Tributary Area (Ac)
Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in)
West of Juniper
27.3
R -SF
1395
38,097
0.128
8
East of Juniper
22.9
R -SF
1395
31,946
0.109
8
East of Juniper
9.1
C -G
1500
13,650
0.050
8
East of Sierra
Total (mgd)
R -SF
1395
0.084
0.022
8
East of Sierra
Pipe Slope ( ft/ft)
R -SF
1396
0.01
0.005
9
East of Sierra
VCP N -value
R -SF
1395
0.013
0.021
8
Pipe Diameter (in)
6
Flow Depth (in)
3.36
Flow Velocity (fps)
3.20
D/d ( %)
42%
Flow Depth (in)
2.95
ad
Sierra Avenue
' Exhibit B
020619 Fontana Sewer.xls B -3
Flow/Ac
Average Flow
Proposed Sewer Main
Description
Tributary Area (Ac)
Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in)
West of Sierra
4.3
R -SF
1395
5,999
0.024
8
West of Sierra
22.9
R -SF
1395
31,932
0.109
8
West of Sierra
8.1
C -G
1500
12,210
0.045
8
East of Sierra
4.0
R -SF
1395
5,580
0.022
8
East of Sierra
0.8
R -SF
1396
1,117
0.005
9
East of Sierra
3.7
R -SF
1395
5,217
0.021
8
Total (mgd)
0.062
Pipe Slope ( ft/ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
8
Flow Depth (in)
2.95
Flow Velocity (fps)
3.00
D/d ( %)
37%
' Exhibit B
020619 Fontana Sewer.xls B -3
Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS)
Baseline Avenue - Distinct Drainaoe Basins
Westerly Cross Street
Tributary Area (Ac)
Land Use
Flow /Ac
(gpad)
Average Flow
(gpd)
Peak Flow (mgd)
Citrus
9.3
C -G
1500
13,965
0.051
Citrus
3.0
R -SF
1395
4,185
0.017
Oleander
5.1
R -SF
1395
7,142
0.028
Cypress
14.2
R -SF
1395
19,809
0.070
Sierra
12.6
R -SF
1395
17,577
0.063
Palmetto
9.0
R -SF
1395
12,499
0.046
8
Total (mgd)
0.309
0.858
Mango Avenue
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT CITRUS /BASELINE JUNCTION
Flow /Ac
Average Flow
Proposed Sewer Main
Description
Tributary Area (Ac)
Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in)
Flow Path
(mgd)
(mgd)
(mgd)
Main (in)
8" beginning south o
East of Mango
90.3
R -SF
1395
125,927
0.379
Highland Ave to north o
MiCallef
East of Mango
11
R -SF
1395
15,387
0.056
12" beginning at MiCallef
West of Mango
120
R -SF
1 1395
167,400
0.492
12" beginning at MiCallef
8
Total (mgd)
0.309
0.858
2.016
Pipe Slope (ft/ft)
Pipe Slope ( ft/ft)
0.01
0.01
VCP N -value
VCP N -value
0.013
Pipe Diameter (in)
Oleander (South of Baseline)
18
12
Flow Depth (in)
Flow Depth (in)
5.50
5.81
Flow Velocity (fps)
Flow Velocity (fps)
4.47
Did (Y.)
31%
D/d ( %)
48%
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT CITRUS /BASELINE JUNCTION
Proposed Sewer
Average Flow
Peak Flow
Cumulative Total
Flow Path
(mgd)
(mgd)
(mgd)
Main (in)
Citrus (South of Walnut)
0.053
0.173
0.173
8
Oleander and Baseline Junctic
0.718
1.849
2.023
15
Baseline (Citrus to Oleander )
0.018
0.065
2.016
8
Total (mgd)
0.789
2.016
Pipe Slope ( ft/ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
Oleander (South of Baseline)
18
Flow Depth (in)
5.50
Flow Velocity (fps)
4.68
Did (Y.)
31%
d
a
1
'
Exhibit B
B-4
020619 Fontana Sewer.xls
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT MANGOIBASELINE JUNCTION
Average Flow
Peak Flow
Cumulative Total
Proposed ewer
Flow Path
Exhibit B - BASELINE
AVENUE SEWER STUDY (CITRUS TO CITY LIMITS)
(mgd)
Main (in)
Sierra (non - tributary)
JUNCTION
0.199
0.199
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT OLEANDER/BASELINE
Baseline (Juniper to Sierra)
0.000
0.000
0.199
8
Juniper (South of Walnut)
Proposed Sewer
0.262
0.433
Average Flow
Peak Flow
Cumulative Total
Total (mgd)
Flow Path
(mgd)
(mgd)
(mgd)
Main (in)
0.01
'
0.01
Oleander (North of Walnut)
0.122
0.369
0.369
8
Exist VCP
8
Oleander (South of Walnut)
0.093
0.287
0.656
10
Flow Velocity (fps)
'
Cypress and Baseline Jun ctioi
0.007
0.028
0.684
15
Baseline (Oleander to Cypres
0.496
1.321
1.849
15
Total (mgd)
0.718
1.849
Pipe Slope (ft/ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
Oleander (South of Baseline)
15
Flow Depth (in)
7.00
Flow Velocity (fps)
5.10
D/d (•h)
47%
OF SYSTEM ENDING AT CYPRESS /BASELINE JUNCTION
CUMULATIVE FLOW SUMMARY
Proposed Sewer
Average Flow
Peak Flow
Cumulative Total
*�
Flow Path
(mgd)
(mgd)
(mgd)
Main (in)
Juniper (North of Walnut)
0.149
0.443
0.443
10
Cypress (North of Walnut)
0.094
0.292
0.692
8
Cypress (South of Walnut)
0.086
0.269
0.912
8
B aseline (Cypress to Juniper
0.020
0.070
0.962
8
Juniper and Baseline Junctior
0.146
0.433
1.321
Total (mgd)
0.496
1.321
Pipe Slope (ft/ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
Baseline (Oleander to Cypress)
15
Flow Depth (in)
5.80
Flow Velocity (fps)
4.67
D/d (%) 1
39%
AT JUNIPERIBASELINE JUNCTION
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT MANGOIBASELINE JUNCTION
Average Flow
Peak Flow
Cumulative Total
Proposed ewer
Flow Path
(mgd)
(mgd)
(mgd)
Main (in)
Sierra (non - tributary)
0.062
0.199
0.199
8
Baseline (Juniper to Sierra)
0.000
0.000
0.199
8
Juniper (South of Walnut)
0.084
0.262
0.433
8
Total (mgd)
0.146
Total (mgd)
0.433
Pipe Slope (ft/ft)
0.01
VCP N -value
0.01
0.013
Pipe Diameter (in)
0.013
Exist VCP
8
Flow Depth (in)
12
2.74
Flow Velocity (fps)
5.22
2.89
D/d 1%)
4.26
34%
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT MANGOIBASELINE JUNCTION
Exhibit B
020619 Fontana Sewer.xls B -5
A verage Flow
Peak 161ow
Cumulative otal
Proposed ewer
Flow Path
(mgd)
(mgd)
(mgd)
Main (in)
Mango
(S Highland to Baselin
0.309
0.858
0.858
8
Baseline (East of Sierra)
0.018
0.063
0.902
8
Total (mgd)
0.326
0.902
Pipe Slope (ft/ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
12" beginning at MiCallef
12
Flow Depth (in)
5.22
Flow Velocity (fps)
4.26
D/d ( %)
44•h
Exhibit B
020619 Fontana Sewer.xls B -5
i
1
1
1
0
a
a
a
i
i
0
e
6