HomeMy WebLinkAbout4071-78. JOINING PIPE:
GENERAL COND177ONS
IRRIGA 77ON SPECIFICA TlONS
I. The Contractor is responsible to be familiar
V.
DRAMNGS (AS-BUILTS):
111. MA TERIALS:
V, FINISH GRADING
with the methods of assembling, joining, and
1.
CONTRACT DOCUMENTS: Shall consist of specificattons and its
1.
SCOPE OF MRK:
installing the various type of pipe to be used
Procure from Landscape Architect transparency (ozalld)
A. SOIL AMENDMEN TS.-
A. TILLING: 71111 all planting areas as herein specified.
general conditions and the drawings. The Intent of these
He will adhere fn strict accordance with the
of popping layout and accurately locate valves,
documents Is to include all labor, materials, and services
The Contractor shall provide all labor, tools,
monufacturer�s recommended procedures.
existing trees for future use, remote control valves
1. Organic Amendment - shall be nitrogen -stabilized
B. UNIFORM GRADE: After tilling, all areas shall be
necessary for the proper execution of the work. The
machinery and processes necessary to install a
with number of stations, and wiring from controllers
shavings, bark or sawdust that meets the
brought to uniform grade by floating or hand raking.
documents are to be considered as one, and whatever Is
complete irrigation system as shown on the plans
2. No PVC pipe shall be threaded and all tronsitton
to remote control valves. Dimension from two
following requirements:
called for by any part shall be as binding as if called for
andlor specified herein. Men completed the
from PVC to metal piping shall be by PVC male,
permanent features such as buildings and walks. After
C. GRADE RELATIONSHIPS.- Finish grade of planting areas
by all parts.
irrigation system shall be 100% coverage system in
thread adapter fitting.
final inspection and before Anal payment,
Particle size:
after application of soil amendments shall be I' below
total functioning manner.
transparency shall be delivered to Landscape
Minimum 95% passing 4 mesh screen (1/42
top of concrete walks and curb grades and 6' below
2.
VERIFICATION: The contractor shall verify measurements on
C. BACKFLOW PREVENTER: The backilow prevention device
Architect. One set of prints shall be supplied to
Minimum 80% passing 8 mesh screen (118
finish floor of buildfng or as noted by spot
the drawings before beginning work. In case of error or
11.
GENERAL REQUIREMENTS:
specified herein shall be verified with Local Plumbing
Owner by the Contractor.
elevations.
discrepancy in the drawings or speciflcations or in work of
and Health Codes. In the event of any conflict on the
Salinity.
others affecting his work, he shall notify the owner's
A.
VERIFICATION OF DIMENSION: All scaled dimensions are
device or installation methods the Landscape Architect
W.
CLEANUP:
Shall be no higher than 3.5 millions per
D. SLOPE FROM BUILDINGS: Soil areas adjacent to
representative immediately. The contractor shall be held
approximate. Before proceeding with any work, the
shall be notifled PRIOR TO BID OPENING.
centimeter at 25 C as measured by saturation
buildings shall slope away from the buildings at 27o
responsible for any damage or loss due to his failure to
Contractor shall carefully check and verify all
A.
SCOPE AND FREQUENCY: After all installation
extract conductivity.
minimum for 10 feet, and shall continue to slope at a
observe these Instructions.
dimensions, spacing of sprinkler heads, location of
0. TESTS.-
operations have been completed, remove all trash,
minimum of 1% until water drains to street or storm
valves and vacuum breakers, and proposed P.O.C. shall
excess soil and rubbish from the property. All scars,
Nitrogen con ten t:
system.
3.
LICENSE: All work shall be performed by a C -27 -California
be as Indicated on the drawings. Any deviation from
1. All main lines and lateral lines which have
ruts or other marks in the area caused by this work
0.7X for sawdust or shavings
Licensed Landscape Contractor.
the plans must have the approval of the Owner"s
glued joints under paying in the system shall be
shall be repaired and the ground left in a neat
1.0% for bark
E. ROCKS OR CLODS.- No rock or clods over 314" in
Representative or the Landscape Architect.
capped and pressured tested at 150 psi.
and orderly condition throughout the site. The
diameter shall be on top of prepared planting bed
4.
INSURANCE: The Contractor shall carry all Workman's
Compensation, Public Liability and Property Damage insurance
8.
VERIFICATION OF FINISH GRADE: The Contractor shall
2. Pressure shall be sustained In the lines for not
Contractor shall pick up all trash resulting from this
work no less than each Friday before leaving the site,
2. Commercial Fertilizer - shall be commercial
grade, granular, 'pro -plant" fertilizer. One
as required by all applicable codes, regulations and the
owner.
inspect the site and check all finish grades within
the work area in order to insure the proper soil
less than four hours. If leaks develop the
joints shall be replaced and the test repeated
once a week andlor the lost working day each week.
AM trash shall be removed completely from the site.
half of the container nitrogen shall be readily
coverage (as specifted) of sprinkler system p1pes.
until the entire system is watertight.
available for initial feeding. The remaining
half of the nitrogen and at/ of the contained
5.
LANDSCAPE ARCH17ECVS LIABILITY: The owner and contractors,
Wt.
COMPLETION.-
potash shall be derived from non -leaching,
recognizing the inherent risks connected with construction,
agree to limit any and all liability, claim for damages,
C.
WATER SUPPLY: The Contractor shall verify and be
familiar with the source of water supply to the
3. Tests shall be observed and approved by Owner's
representative prior to backfill.
A.
INSPECTION: Inspection of complete irrigation system
coated, controlled release fertilizer for
cost of defense, or expenses to be levied against the
sprinkler as indicated on the drawings.
will be made at pre -maintenance and final inspection
sustained feeding of four to six months, in a
slow soluble, non -burning form.
Landscape Architect on account of any design defect, error.
4. Men the sprinkler system Is completed, (and
for planting, per arrangement with Landscape
omission, or professional negligence to a sum not to exceed
D.
PERM17S AND FEES: The Contractor shall apply and pay
before planting is begun) the Contractor; in the
Architect.
Fertfltzer shall be delivered to the site in the
$50,000, or the amount of the Landscape Architect's fee,
whichever Is lesser.
for all necessary permits and fees required in the
pursuit of his work as required by the governing
presence of the Ownies representative, shall
test the coverage of water afforded the town and
B.
GUARANTEES.- The entire sprinkler system shall be
original unopened container, bearing the
manufacturer's guaranteed analysis. Any
6.
CONSTRUC77ON SAFETY.- The design, adequacy and safety of
codes.
planting areas as completed and adequate. The
Contractor shall furnish aff materials and
guaranteed by the contractor as to material and
workmanship, including setti'n of back filled areas
/?I)
fertflizer that becomes caked or damaged, making
it unsuitable for use, will not be accepted
erection, excavation, bracing, shoring, temporary supports,
E.
CARE OF EYJS77NG BUILDINGS AND SITE.- The Contractor
perform all work required to correct any
below grade for a period of yiear following the
etc., Is the sole responsibility of the Contractor, and has
not been considered by the Landscape Architect or his
shall be held responsible for the care and
preservation of all existing buildings and structures
inadequacies of coverage disclosed
date of final acceptance of the work. If, within one
year from the date of completion settling occurs, and
3. Sod Conditioners - shall be agricultural grade
consultants. The contractor Is responsible for the
on the property and adjacent premises and contiguous
5. The Contractor shall inform the Owner"s
adpstments in pipes, valves and sprinkler heads, sod
gypsum, sod sulfur and iron sulfate.
stability of any structures and excavations and shall
representative of any deviation from the plan
or paying is necessary to bring the system, sod or
4. Fine Sand - shall be clean, natural fine sand
provide the necessary bracing to provide stability during
disturbed because of his work shall be repaired,
required by windplanting, sod or site
pavfng to the proper level of the permanent grades,
free from deleterious material weed seeds, clay
the entire construction progress. Observation visits to the
replaced, or cleaned by him at his expense.
conditions that bear on present coverage.
the Contract(x; as part of work under this contract,
bails or rock with 95X minimum passing a No. 4
site by the Landscape Architect or his consultants shall not
include inspection of the above items.
F.
REWEW OF DRAWNGS: It Is the Contractor's
E. SPRINKLER HEAD INSTALLATION:
shall make all adftistments without extra cost to the
Owner, including the complete restoration of aff
sieve and 10 maximum passing a No. 100 sieve.
responsibility to review irrigation drawings and note
damaged planting, paving or other improvements of any
5. Peat Moss - shall be a commercial, baled
Z
SURVEYS, PERMITS, REGULATIONS.- The owner shall furnish an
any areas he believes additional heads or valves are
1. Shrubbery or ground cover spray heads adjacent
kind
Canadian sphognurn material, with ph of 4.5 to
adequate survey of the property. The contractor shall
obtain and pay for all permits and comply with all laws and
required prior to submitting a bid. If no changes are
submitted the Contractor Is responsible for full
to curbs or walks shall be installed 6* away
from the curb or walk and the nozzle shall be 6&1
C.
RESPONSIBILITY: Should any operational difficulties
5.5 the moss shall be free of wood material and
y
minerals or foreign matter harmful to plant
ordinances bearing on the operation or conduct of the work
coverage of the sprinkler system and providing
additional equipment as necessary of the Contractor's
above finished grade, unless otherwise
indicated
in connection with the sprinkler system develop within
the specifted guarantee period which Is in the opinion
life. 'Sunshine'" brand or equal.
as drawn and specified. If the contractor observes that a
variance exists therewith he shall promptly notify the
expense.
of the Landscape Architect due to inferior material
B. TOPSOIL:
owner * S representative in writing, and any necessary changes
shall be adjusted as provided in the contract for changes
G.
GOVERNING REGULATION.- All local, municipal and state
2. Shrubbery spray heads adjacent to buildings,
fences, or similar structures shall be installed
andlor workmanship, sold difficultles shall be
immediately corrected by the Contractor to the
1. Topsoil shall consist of a fertile, Noble
in th e work.
laws, rules and regulations governing or relating to
any portion of this work are hereby Incorporated into
600 away from the structure and the nozzle shall
be 6" above flnished grade. Shrubbery spray
satisfaction of the Landscape Architect at no
additional cost to the Owner, including any and
natural loom of uniform quality free from
8.
PROTEC71ON OF MRK, PROPERTY AND PERSON: The contractor
and made a part of these speciftcattons, and their
heads not near paving or structures shall be set
all other damage caused by such defects.
subsoil, hard clods, stiff clay, hard pan,
sods, partially disintegrated debris, or any
shall adequately protect the work adjacent property and the
provisions shall be carried out by the sprinkler
con tractor.
6" above Anish grade, unless other wise
indicated
D.
INSTRUCTION: After the system has been completed and
other undesirable material.
public, and shall be responsible for any damage or injury
due to his act.
the connections made, the Contractor shall instruct
2. Topsoil shall not contain obnoxious weeds, such
H.
DIAGRAMMA71C DESIGN: This design Is diagrammatic.
All pipe, valves, etc. shown within paved areas are
3. All sprinkler heads are to have swing joints as
detailed.
the Owner or his representative, in the operation and
maintenance of the system.
as morning glory, spore, oxtails, spurge, annual
9.
CHANGES W THE WORK: The owner may order changes in the
work. The contract sum being adjusted accordIngly. All
for design clarification only and shall be Installed
poa, nut gross or bermuda gross. In no case
shall there be more than 5Z by volume of the
such orders and adjustments plus claims by the contractor
in planter areas where possible. Never install
backflow preventers in town areas, always in shrub
4. Install sprinkler heads per details.
E.
TEMPORARY REPAIRS.- The Owner reserves the right to
make temporary repairs as necessary to keep the
follo win g:
for extras must be made before executing the work involved
areas.
F. SPRINKLER HEAD ADJUSTMENTS:
sprinkler system equipment in operating condition.
stones smaller than one inch
10.
PROVISIONS FOR EXTRAS.- No new work of any kind shall be
considered an extra unless a separate estimate is given for
1.
INSTALLATION.- All irrigation materials shall be
1. The irrigation Contractor shall flush and adjust
The exercise of this right by the Owner shall not
relieve the Contractor of his responsibititles under
* coarse sand
* small clay lumps
sold work before it Is commenced and until some is approved
installed in accordance with the techniques and
all sprinkler heads for optimum performance and
the terms of the guarantee as herein specified
by the owner, and then not unless the owner first so ordered
in writing and the particular extra work Is specified in
speciflcottons set forth by each respective
manufacturer. All pertinent descriptive literature
to prevent over spray onto walks and buildings as
much as possible. This shall include selecting
3. Size - the size of the plants will correspond
with that normally expected for species and
writing and the cost agreed upon between the owner and the
Issued by these manufacturers becomes part of these
speciflcations after having been approved by the
the best degree of arc to fit existing site
situations.
variety of commercially available nursery stock,
contractor. Except for extra work ordered by the owner
according to unit prices which have been bid, any extra work
Owner�4 authorized representative. Such installation
PLAN 77NG SPECIFICA TIONS
or as measured before pruning with the branches
in normal position, shall have normally well
perform" not authorized (is provided above, will not and
practices shall be followed only if the directions of
the irrigation drawings and specifications do not
G. CLOSING IN UNINSPECTED WORK.-
I.
SCOPE OF MRK:
developed branch systems, and vigorous and
cannot be paid for by the ownen
thoroughly and completely order the methods or
The Contractor shall not allow or cause any of his
fibrous root systems which are not root or pot
bound All inspection certificates required by
11.
SUBSTITUTIONS.- AM materials shall be specifled unless the
techniques to be followed Install all equIpment and
work to be covered or enclosed until it has been
A.
Furnish all labor, materials, and equipment necessary
law shall accompany each shipment and be
contractor con establish the fact that they are unavailable,
materials as shown in details.
inspected, tested and approved by an authorized
to provide and install plant materials as shown on the
delivered to the Owner.
and substitutions are approved in writing by the Landscape
representative of the Owner. Should any of his work
drawings or as specified herein.
Architect.
J.
S17E PROBLEMS: The irrigation Contractor shall not
willfully install the sprinkler system as Indicated on
be enclosed or covered before such inspection and
test, he shall uncover the work at his own expense and
6.
Work included in this Sectlon-(items included but not
4. The caliper of all trees shall be measured 41'
above the surface of the ground
12.
CORREC71ON OF VWRK.- The contractor shall re -execute any
drawings when it Is obvious in the fleld that there
differences,
after it has been Inspected, tested, and approved,
limited to):
work that fails to conform to the requirements of the
contract and shall remedy defects due to faulty materials or
are unknown obstructions, grade andlor
discrepancies In the area dimensions until such
shall make all repairs with like materials necessary
to restore all his work and that of other Contractors
1. Grade, including mounding, molding and shaping
5. Mere caliper or other dimensions of any plant
materials are omitted from the plant list it
workmanship upon written notice from the project manager for
conditions are brought to the attention of the
to its original condition
surfaces of all planting areas as indicated
shall be understood that these plant materials
a period of ninety (90) days from date of completion of the
Landscape Architect.
including the removal of existing vegetation
shall be normal stock for typie listed
contract. The irrigation system shall carry a one year
unless otherwise specifled.
guarantee. The paragraph applies to the work of
subcontractors as well as employees of the contractor.
Ill.
MATERIALS:
H. BACK FILLING
2. Prepare and till soft in planting areas
6. Plant material shall be symmetrical typical for
variety and species and shall conform to
A.
Sprinkler materials and equipment shall be of type,
1. Back fill shall not be placed until the installed
including furnish of all sod amendments as
measurements specified in the plant list.
13.
LANDSCAPE COORDINATORS STATUS.- The landscape coordinator
size and location as noted and indicated on the
sprinkler system has been inspected and approved
specifled
acts as the authorized representative of the owner in
conJunction with the project manager, and has the authority
drawings. Unless permission to change Is granted from
the Landscape Architect or Owner's Representative,
by the Owners representative.
3. FurnIsh and plant off pliant materials as
Z Quantities shown on the coil outs on the
Planting Plan are for the convenience of the
to accept of reject materials or workmanship and to make
material are to be new and In perfect condition. No
2. Trenches shall be back filled with a minimum of
indicated by the drawings and speciflcations.
Contractor only. Quantities drawn on the plan
minor changes in work not involving extra cost. He will
deviations from the specifications shall be allowed.
4" of rine granular materials to protect, the
(whether by circles or dots) ore the final
also interpret the meaning of the contract documents and may
The decision of the Landscape Architect shall be final
pipe from the clods of rocks the remaining
4. Perform all pruning as required
authority and shall be furnished and installed
stop the work if necessary to insure its proper execution.
in the determination of the quality of materials.
excavated dk-t con be used as backfill. The
as dra wn.
Contractor shall not place detrimental subsoil
5. Stake and tie all plant material as specifed
14.
CLARIFICA77ON OF DRAMNGS BEFORE BIDDING: After reviewing
9.
EQUIPMENT TO BE FURNISHED:
in the top 6' of backrill.
6. Provide for the maintenance of the planting
8. Rejection or Substitution - all plants not
the drawings thoroughly it Is the contractors responsibility
to clarify with the Landscape Architect or owners
1. Supply as a part of this contract the following
3. If settlement occurs and adjustments in p1pes,
until acceptance of the job by the Landscape
conforming to the requirements herein speciffed,
shall be considered defective, and such plants,
representative, any questions the contractor may have
tools:
valves, sprinkler heads or sod are necessary to
Architect.
whether in place or not, shall be marked as
regarding the method of construction, quantities, or quality
of materials indicated or called out. If the contractor
Two (2) sets of special tools required for
bring the system to proper working order, the
Contractor shall as a part of the work under
Z Dispose of all debris and surplus materials.
rejected and immediately removed from the site
of the work and replaced with new plants at the
connot.contact the Landscape Architect or owner�i!s
removing, disassembling and adjusting each
too of sprinkler and valve supplied on
this contract make all the necessary ad)ustment
without extra cost to the Owner.
8. Clean up
Contractor's expense. The plants shall be of the
representative, the contractor must qualify his bid or
this project.
species, variety, size and condition specifled
accept the interpretation of the Landscape Architect or
ownWs representative on the questionable areas as they
1. AUTOMA77C CONTROLLER AND VALVES.
9. Guarantee
on the drawings. Under no condition will there
be any substitution of plants or sizes for those
develop during construction.
Two (2) rive foot valve keys for operation of
gate valves.
1. A 120 volt electrical power outlet to the
10. Maintenance
listed on the accompany1hg plans, except with
15.
SAMPLES: The Landscape Architect reserves the right to take
and analyze samples of materials for conformity to
Two (2) keys for each automatic controller.
controller shall be provided by others. The
irrigation Contractor shall be responsible for
It.
VERIFICATION OF SITE CONDITIONS.-
the expressed consent of the Owner.
0. SEED MATERIALS:
specifications at any time. The contractor shall furnish
samples upon request by the Landscape Architect. Rejected
Four (4) quick coupler keys and matching hose
making the hookup from the outlet to the
controller.
A.
EXCAVATION.- The Contractor shall verify exact
1. Seed shall be clean, fresh, new crop seed and
material shall be immediately removed from the site and
replaced at contractors expense. The cost of testing
swivels for each type of quick coupling valve
installed.
2. AM wire from the controller to electric control
locations of all existing subsurface utilities
mechanical and electrical prior to excavation. Any
shall be the mixture as noted in the General
Notes on the Planting Plan.
materials not meeting specifIcations shall be paid for by
valves shall be solid copper U F J 14-600 volt
utilities A.C., paying, concrete work etc., destroyed
the contractor.
2. Turn over the required equipment to the Owner at
direct burfol. Use white wire for common, blue
or damaged by any work under this contract shall be
2. Seed shall be mixed by a dealer and furnished
the conclusion of the project, prior to final
for lawn systems, black for shrub systems and
repaired or replaced at the Contractor"s expense.
with the dealer's guaranteed statement of
16.
PRE-CONS7RUC710N CONFERENCE: Schedule a pre -construction
meeting with the Landscape Architect at least 7 days before
inspection.
red for irrometer common control wire. Install
in common trench with main line pipe where
S.
SUBSURFACE DRAINAGE OR SOIL CONDITIONS.- Should sub-
composition and percentage of purity which shall
be furnished to the Landscape Architect.
beginning work. The purpose of this conference 1.9 to review
possible. Provide minimum 18" cover.
surface drainage or soil conditions be encountered
any questions the contractor may have regarding the work
administrative procedures during constructions and project
IV.
INSTALLATION:
3. Wire connections shall be made with "Scotch -Lok'
which would be detrimental to growth or survival of
plant material, the Contractor shall notify the
E. STAKES: All stakes shall be as per details.
work schedule.
A.
EXCA VA 770N.-
wire connector sealing packs 13576 or Spears
Landscape Architect in writing stating the conditions
'Ort -splice""' with sealant DS 300.
and submitting a proposal covering cost of correction
I V. OBSTRUC77ON BELOW GROUND
I Z
COMPLETION: Completion is dertned as being when all
conditions of the contract have been accomplished.
1. The Contractor shall verify exact locations of
all existing subsurface utilities (any
4. There shall be a control wire from each control
if the Contractor fails to notify the Landscape
Architect of such conditions he shall be responsible
A. CONTRACTOR'S RESPONSIBILITY- The Contractor is
Speciflcaffy when all items ore installed, the areas cleaned
mechanical and electrical) prior to excavation.
valve running to the controller, and each
for plant material under the guarantee clause of the
responsible for verifying the location of all utility
and the maintenance period satisfactorily completed, and hen
Any utilities, A.C. pavfng, concrete worketc.,
control valve shall be connected to the common
speciflcation.
lines and other underground obstructions so that
all specidl tools and equipment, instructions, written
destroyed or damaged by any work under this
ground
proper precautions may be taken not to disturb or
ALL LANDSCAPE CONSTRUCTION SHALL BE PER
guarantees, as -built plans, lien releases and any items
contract shall be repaired or replaced at the
C.
DIMENSIONS: All scaled dimensions are approximate.
damage such improvements. In the event of a conflict
STANDARD LANDSCAPE SPECIFICA71ONS MANUAL
required by the contract documents have been property
Contractor's expense.
5. All electrical work shall comply with applicable
Before proceeding with any work, the Contractor shall
between such lines and plant locations, the Contractor
FOR S7REETSCAPES AND PARKS, OCT. 1999.
executed and delivered to the owner.
codes.
corefull check and verify all dimensions and
y
shall promptly notify the Landscape Architect, who
2. Trenches for pipe shall be cut to required grade
quantities and shall immediately inform the Landscape
shall arrange for the relocation of one or the other.
The Landscape Architect shall have full authority to accept
line at a true gradient to provide uniform
6. Install all valves per details.
Architect of any discrepancy between the information
Failing to follow this procedure, the Contractor shall
or reject the contract items and will promptly notify the
support for the full length of pipe.
on the drawings and actual conditions refraining from
at his own expense make any and all repairs for
owner of completion.
doing any work in sold areas until given approval to
damages resulting from his work.
3. Depth of trenches shall be sufficient to provide
do so by the Landscape Architect.
18.
GUARANTEE: In addition to specified guarantees provided for
a minimum cover above the top of the pipe as
in the separate sections of the specifications, the
noted on the drawings.
contractor shall guarantee in writing ofl workmanship and
materials to be free from defect for a period of one year
from the date of acceptance of the work by the owner without
additional cost to the owner.