HomeMy WebLinkAboutJ - Preliminary Hydrology Report
PRELIMINARY HYDROLOGY AND
HYDRAULICS STUDY FOR
BEECH AVENUE
INDUSTRIAL PROJECT
CITY OF FONTANA
CALIFORNIA
PREPARED BY:
41660 IVY STREET, SUITE A
MURRIETA, CA 92562
(951) 304-9552 • FAX (951) 304-3568
APRIL 11, 2022
REVISIONS:
AIREF BEECH LOGISTICS
CENTER LP
PRELIMINARY HYDROLOGY AND HYDRAULICS REPORT FOR
BEECH AVENUE INDUSTRIAL PROJECT
CITY OF FONTANA, CALIFORNIA
O:\265.22.22\Engineering\Hydrology_Plan\Reports\Prelim Hydrology&Hydraulics.docx
1
This report has been prepared by or under the direction of the following registered civil
engineer who attests to the technical information contained herein. The registered civil
engineer has also judged the qualifications of any technical specialists providing
engineering data upon which recommendations, conclusions, and decisions are based.
4/11/2022
Joseph L. Castaneda RCE 59835 Date Seal
Registered Civil Engineer
AIREF BEECH LOGISTICS CENTER LP
PRELIMINARY HYDROLOGY AND HYDRAULICS REPORT FOR
BEECH AVENUE INDUSTRIAL PROJECT
CITY OF FONTANA, CALIFORNIA
O:\108.11.07\Tentative_Tract_Map\Engineering\Hydrology_Plan\Report\report.doc 2
TABLE OF CONTENTS
I. INTRODUCTION .................................................................................................. 1
II. PROJECT SITE AND DRAINAGE AREA OVERVIEW .......................................... 1
III. HYDROLOGY ....................................................................................................... 2
IV. STORM DRAIN SYSTEM ..................................................................................... 5
V. CONCLUSION AND RECOMMENDATIONS ....................................................... 9
VI. REFERENCES ..................................................................................................... 9
FIGURES
FIGURE 1: VICINITY MAP
FIGURE 2: WATERSHED STUDY AREA
APPENDICES
APPENDIX A: PRE-PROJECT RATIONAL METHOD HYDROLOGY ANALYSES
APPENDIX A.1: RATIONAL METHOD ANALYSIS, 100-YEAR STORM EVENT
APPENDIX A.2: RATIONAL METHOD ANALYSIS, 25-YEAR STORM EVENT
APPENDIX A.3: RATIONAL METHOD ANALYSIS, 10-YEAR STORM EVENT
APPENDIX B: POST-PROJECT RATIONAL METHOD HYDROLOGY
ANALYSES
APPENDIX B.1: RATIONAL METHOD ANALYSIS, 100-YEAR STORM EVENT
APPENDIX B.2: RATIONAL METHOD ANALYSIS, 25-YEAR STORM EVENT
APPENDIX B.3: RATIONAL METHOD ANALYSIS, 10-YEAR STORM EVENT
APPENDIX C: POST-PROJECT UNIT HYDROGRAPH ANALYSES
APPENDIX C.1: 100-YEAR STORM EVENT
APPENDIX C.2: 25-YEAR STORM EVENT
APPENDIX D: 96” CMP SUBSURFACE STORAGE SYSTEM
AIREF BEECH LOGISTICS CENTER LP
PRELIMINARY HYDROLOGY AND HYDRAULICS REPORT FOR
BEECH AVENUE INDUSTRIAL PROJECT
CITY OF FONTANA, CALIFORNIA
O:\108.11.07\Tentative_Tract_Map\Engineering\Hydrology_Plan\Report\report.doc 3
EXCERPTS
EXCERPT A: NRCS SOIL SURVEY HYDROLOGIC SOILS MAP
EXCERPT B: NOAA ATLAS 14 RAINFALL
EXCERPT C INFILTRATION REPORT
EXCERPT D PRELIMINARY FOOTHILL REGIONAL STORM DRAIN
EXCERPT E FOOTHILL BLVD & BEECH AVENUE IMPROVEMENT PLANS
EXHIBITS
EXHIBIT A: PRE- PROJECT CONDITION RATIONAL METHOD HYDROLOGY MAP
EXHIBIT B: POST- PROJECT CONDITION RATIONAL METHOD HYDROLOGY MAP
EXHIBIT C: DRAINAGE FACILITIES MAP
AIREF BEECH LOGISTICS CENTER LP
PRELIMINARY HYDROLOGY AND HYDRAULICS REPORT FOR
BEECH AVENUE INDUSTRIAL PROJECT
CITY OF FONTANA, CALIFORNIA
O:\265.22.22\Engineering\Hydrology_Plan\Reports\Prelim Hydrology&Hydraulics.docx
1
I. INTRODUCTION
The Beech Avenue Industrial project is approximately 10 acre industrial site that is
being developed. The development project will be constructing an industrial
building that is 185,380 square feet. The project site is located at the northeast
corner of the intersection of Beech Avenue and Pacific Electric Trail. The project
site is currently an undeveloped site, see Figure 1. The purpose of this study is to
determine the necessary storm drain infrastructure and best management
practices (BMPs) required for the proposed project. The scope of work consists of
the following:
1. Perform the post-project condition 100-year, 25-year and 10-year hydrology
analyses for the overall project site utilizing the San Bernardino County
Hydrology Manual.
2. Determine the necessary storm drain improvements to convey the post-project
condition flow rate using the requirements outlined in the Preliminary Foothill
Regional Storm Drain Drainage Report prepared by Madole & Associates.
3. Determine the subsurface storage system volume required to attenuate the
water quality runoff generated by the project.
4. Prepare a preliminary hydrology and hydraulics which consists of hydrological
and analytical results and exhibits.
II. PROJECT SITE AND DRAINAGE AREA OVERVIEW
The Beech Avenue Industrial project is proposing a 185,380 square foot building
as part of the development of an industrial site. The project site is bounded by
Pacific Electric Trail to the north, an undeveloped site to the south, existing
developed area to the west, and Beech Avenue to the south. The City of Fontana
General Plan dated March 2, 2021 has identified the project area as light industrial.
The existing site topography currently trends to the south. The runoff produced by
the watershed accumulates along Foothill Blvd. The runoff from the watershed
area currently surface flows from east to west along Foothill Blvd. The watershed
area used to study the surrounding area is bounded by Pacific Electric Trail to the
north, Sultana Avenue to the east and Hemlock Avenue to the west and Foothill
Blvd to the south, see Figure 2. The watershed area is controlled by storm drain
infrastructure north of Pacific Electric Trail, catch basins at the intersection of
Sultana Avenue and Foothill Blvd and existing catch basins at the intersection of
Hemlock Avene and Foothill Blvd. There is an existing storm drain facility that is
either a 36-inch or 42-inch storm drain along Foothill Blvd that extends from
Hemlock Avenue to Sultana Avenue. The existing storm drain connects to a 66-
inch storm drain west of Hemlock Avenue. The runoff from the watershed area
AIREF BEECH LOGISTICS CENTER LP
PRELIMINARY HYDROLOGY AND HYDRAULICS REPORT FOR
BEECH AVENUE INDUSTRIAL PROJECT
CITY OF FONTANA, CALIFORNIA
O:\265.22.22\Engineering\Hydrology_Plan\Reports\Prelim Hydrology&Hydraulics.docx
2
sheet flows in the southerly direction. However, there is only one grate inlet at
Beech Avenue and Foothill Blvd that connect to the existing storm drain within
Foothill Blvd that extends from Hemlock Avenue to Sultana Avenue
The proposed project is planning to construct an industrial site that has an
impervious area percent of 90%. The existing topography indicates a change in
vertical elevation of 10 feet between the northern property line and southern
property line. The project is planning to construct a subsurface infiltration storage
system and a 24-inch storm drain system that will convey flows to Foothill Blvd and
Beech Avenue. In addition, the project will coordinate with the City of Fontana to
implement the storm drain infrastructure planned as part of the Foothill Blvd and
Beech Avenue roadway improvements that are part of a capital improvement
project.
III. HYDROLOGY
The San Bernardino County Hydrology Manual (Reference 1) was used to develop
the hydrological parameters for the rational method. The calculations were
performed using the computer program developed by Civil Cadd/Civil Design.
The existing hydrological soil type is Soil A which was obtained from the United
States Department of Agriculture, Natural Resources Conservation Service
(NRCS) WebSoil Survey, see Excerpt A. The project soil composition (Soil A) is
considered to have high infiltration potential. The soils type utilized in conjunction
with the land covers for the pre-project and post-project conditions:
Pre-Development Condition
Land Cover Corresponding
Hydrology Manual
Cover
Runoff
Index – Soil
C
Impervious
Fraction
Undeveloped Fair
Cover Open Brush Fair Cover 46 0.00
Post-Development Condition
Land Cover Corresponding
Hydrology Manual
Cover
Runoff
Index – Soil
C
Impervious
Fraction
Paved and
Building Area Industrial/Commercial 32 0.90
To perform hydrology analyses, rainfall data is required as part of the input
parameters required by the program. The rainfall depths (in inches) utilized in
AIREF BEECH LOGISTICS CENTER LP
PRELIMINARY HYDROLOGY AND HYDRAULICS REPORT FOR
BEECH AVENUE INDUSTRIAL PROJECT
CITY OF FONTANA, CALIFORNIA
O:\265.22.22\Engineering\Hydrology_Plan\Reports\Prelim Hydrology&Hydraulics.docx
3
the hydrology analyses were obtained from NOAA Atlas 14, see Excerpt B. As
part of the rational method analyses an intensity-duration slope is required to
compute the intensity for a given time of concentration. The analyses utilized a
slope value 0.6 as required by the San Bernardino County Hydrology Manual.
The total watershed study area for the project site is approximately 42 acres. The
watershed was broken up into two areas to determine peak flow rate within the
watershed area. In the pre-project condition, the area analyzed Area A and Area B.
Area A is the watershed area tributary to Foothill Blvd and Hemlock Avenue. Area
B is tributary to Beech Avenue and Foothill Blvd. The purpose of the pre-project
rational method analyses is used to develop peak flow rates to assess current flow
rates at key intersections:
Table 1 – Pre-Project Flow Rate (ft3/s) Results
Drainage Area Intersection 100 Year
Flow Rate
25 Year
Flow Rate
10 Year
Flow Rate
Area A Foothill &
Hemlock
41.2 20.5 12.0
Area A
w/ Area B By-
Pass
Foothill &
Hemlock
63.4 33.4 21.9
Area B Foothill &
Beech
22.2 12.9 9.9
The pre-project rational method hydrology calculations have been included in
Appendix A. The pre-project rational method hydrology map has been included as
Exhibits A.
The same watershed area was developed for the post-project condition. However,
the proposed storm drain system was represented in the hydrology model. The
table below provides the flow rates
Table 2 – Post-Project Flow Rate (ft3/s) Results
Drainage Area Intersection 100 Year
Flow Rate
25 Year
Flow Rate
10 Year
Flow Rate
Area A Foothill &
Hemlock
33.6 19.0 12.6
Area B Foothill &
Beech
22.1 6.1 22.4
The post-project rational method hydrology calculations have been included in
Appendix B. The pre-project rational method hydrology map has been included as
Exhibits B.
AIREF BEECH LOGISTICS CENTER LP
PRELIMINARY HYDROLOGY AND HYDRAULICS REPORT FOR
BEECH AVENUE INDUSTRIAL PROJECT
CITY OF FONTANA, CALIFORNIA
O:\265.22.22\Engineering\Hydrology_Plan\Reports\Prelim Hydrology&Hydraulics.docx
4
In addition, to the rational method analyses, a unit hydrograph analyses were
performed for the 100-year and 25-year post project condition. The unit hydrgraph
analyses was developed to determine the required the size of the subsurface
system. The Drainage Study developed by Madole & Associates documented that
a 8’h X 6’W RCB storm drain would be required along Foothill Blvd. The storm
drain system would connect to an existing 66-inch storm drain located west of
Hemlock Avenue. Furthermore, the study indicates that the during the interim
condition the design flow rate should be for a 25-year storm frequency. Therefore,
the project will be required to mitigate the 100-year peak flow rate to 25 year peak
flow levels. The unit hydrographs have been included in Appendix C. The results
in Table 3 provide the required storage volume and flow rate reduction required to
meet the interim design criteria.
Table 3 – Post-Project Unit Hydrograph Results
Drainage Area 100 Year
Flow Rate
(ft3/s)
25 Year
Flow Rate
(ft3/s)
Subsurface
System
Outflow (ft3/s)
Storage
Required
(ac-ft)
Project Site 31.2 23.7 17.3 0.6
IV. STORM DRAIN SYSTEM
The project will construct industrial building with an area of approximately 185,380
sf. The project will implement grate inlets, catch basins and storm drain system
within the project site to collect and convey runoff into a subsurface storage
system, which is required to mitigate water quality runoff and increase runoff to
restrict flows to the 25 year peak flow rate condition.
Additionally, the project is required to implement Best Management Practices
(BMPs) throughout the project site to ensure water quality mitigation meets the
standards as outlined in the San Bernardino County Water Quality Technical
Guidance Manual (TGM). The TGM provides a hierarchy of BMPs that are to be
implemented on a project and are outlined as follows:
1. Priority No. 1 BMPs are infiltration BMPs that allow water quality runoff from the
project to be captured and reintroduced into the groundwater.
2. Priority No. 2 BMPs are capture and storage BMPs that collect the water quality
runoff. The water quality runoff volume is then used as part of the project daily
operations such as toilet water, industrial uses, or other uses where water is
needed. The reuse of the water quality runoff will be discharged into the local
sewer system where it undergoes treatment.
3. Priority No. 3 BMPs will capture and store water quality runoff within a
landscape basin area that incorporates a prescribed soil media. The vegetation
AIREF BEECH LOGISTICS CENTER LP
PRELIMINARY HYDROLOGY AND HYDRAULICS REPORT FOR
BEECH AVENUE INDUSTRIAL PROJECT
CITY OF FONTANA, CALIFORNIA
O:\265.22.22\Engineering\Hydrology_Plan\Reports\Prelim Hydrology&Hydraulics.docx
5
and soil media provide the treatment of the water quality runoff before releasing
the runoff into the local storm drain system.
To begin the process of assessing the BMPs, the project must prepare a
geotechnical and infiltration study for the project site. Based on the results of the
study the project can assess the best BMP approach for the project site. Based on
the results of the geotechnical and infiltration study, which is included as part of the
WQMP, the project has infiltration rate sufficient to promote the use of infiltration
based BMPs. The proposed location of the subsurface storage system has been
located along the easterly side of the project site where infiltration test location I-1
& I-2 were taken, see Excerpt C Infiltration Report. The infiltration rate at this
location is 12.1 in/hr. As part of the project preliminary design a value of 12.1 in/hr
was utilized. Additionally, the preliminary analyses will use a safety factor of 5 to
compute a flow rate per horizontal square foot.
The drainage facilities map shown in Exhibit C, provides the proposed drainage
facilities for the project site. The drainage systems consist of drainage inlets,
storm drain pipe and a subsurface storage system to mitigate water quality and
increased runoff. Based on the hydrology the subsurface storage system must
retain sufficient volume to treat water quality volume. Based on existing storm drain
infrastructure, the project will be allowed to discharge the 25-year peak flows from
the project site. The project is proposing the following improvements:
1. Proposed onsite storm drain to convey runoff into the proposed subsurface
storage unit defined as Detention Basin A. The subsurface system will be a 5
barrel 96” subsurface system that is 52 ft wide and 195 ft long. The total
infiltration surface area will be 10,140 sf.
2. Line A will convey onsite runoff from the project site and deliver the runoff into
the Detention Basin A
3. The Beech Avenue Storm Drain will be the outlet system for Detention Basin A
and will convey the runoff into the Foothill Blvd Storm Drain which is a 8’W x
6’H RCB system.
The subsurface storage system assessment was conducted for the proposed
water quality volume of 39,644 ft3. The following is a description of the analyses
which accounts for the infiltration potential of the in-situ soil with a safety factor of
5:
1. The subsurface storage size evaluation began by sizing a subsurface system to
ensure the water quality volume can be drained in less than 48 hours. The
assessment had to perform an iterative process that determined a subsurface
storage system horizontal area used to compute an infiltration flow rate based
12.1 in/hour and a basin bottom area of 10,140 ft2. Using these two
AIREF BEECH LOGISTICS CENTER LP
PRELIMINARY HYDROLOGY AND HYDRAULICS REPORT FOR
BEECH AVENUE INDUSTRIAL PROJECT
CITY OF FONTANA, CALIFORNIA
O:\265.22.22\Engineering\Hydrology_Plan\Reports\Prelim Hydrology&Hydraulics.docx
6
parameters a flow rate for the subsurface system is 0.568 ft3/s for the horizontal
area.
2. The subsurface storage system will allow the water quality volume to be stored
below elevation 1269.0 which will hold a total of 43,670.25 ft3 of runoff volume.
This is more than the minimum required volume of 39,644 ft3.
3. Using a flow rate for the subsurface system of 0.568 ft3/s for the horizontal area
the storage volume of 43,670.25 ft3 will take 21.5 hours to infiltrate.
4. The storage above elevation 1269.0 will be used to regulate the peak flow
leaving the project site to be less than the 25 year peak flow rate. Based on the
available storage volume shown on the table included in Appendix D, a total of
0.6 acre feet has been provided. This will limit the outflow to 17.3 ft3/s.
The Drainage Facilities Map, Exhibit C includes the proposed storm drain system
that will be constructed as part of this project which will meet the requirements
outlined in the Preliminary Foothill Regional Storm Drain Drainage Report prepared
by Madole & Associates.
V. CONCLUSION AND RECOMMENDATIONS
This preliminary hydrology and hydraulics study was prepared to determine the
required improvements to address mitigation measures for the project site.
Additionally, the project provides the required infrastructure to flood protect the
project.
VI. REFERENCES
1. San Bernardino County Hydrology Manual, August 1986
2. Preliminary Foothill Regional Storm Drain Drainage Report prepared by Madole
& Associates
3. Foothill Blvd and Beech Avenue Roadway Improvements
AIREF BEECH LOGISTICS CENTER LP
FIGURES
FIGURE 1: VICINITY MAP
41660 IVY STREET, SUITE A
MURRIETA, CA 92562
PH. 951.304.9552 FAX 951.304.3568
Engineering & Consulting, Inc.
FIGURE 2: WATERSHED STUDY AREA
41660 IVY STREET, SUITE A
MURRIETA, CA 92562
PH. 951.304.9552 FAX 951.304.3568
Engineering & Consulting, Inc.
APPENDICES
APPENDIX A: PRE-PROJECT RATIONAL METHOD HYDROLOGY ANALYSES
APPENDIX A.1: RATIONAL METHOD ANALYSIS, 100-YEAR STORM EVENT
1
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2014 Version 9.0
Rational Hydrology Study Date: 04/11/22
------------------------------------------------------------------------
265.22.22
100-YEAR RATIONAL TABLING METHOD FOR AREA A
PRE-PROJECT CONDITION
FN: ARAPRE100.RSB
------------------------------------------------------------------------
Program License Serial Number 6279
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
------------------------------------------------------------------------
Rational hydrology study storm event year is 100.0
Computed rainfall intensity:
Storm year = 100.00 1 hour rainfall = 1.510 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 3
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 101.000 to Point/Station 102.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Adjusted SCS curve number for AMC 3 = 70.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.532(In/Hr)
Initial subarea data:
Initial area flow distance = 569.000(Ft.)
Top (of initial area) elevation = 1288.000(Ft.)
Bottom (of initial area) elevation = 1275.400(Ft.)
Difference in elevation = 12.600(Ft.)
Slope = 0.02214 s(%)= 2.21
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.134 min.
Rainfall intensity = 2.998(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.740
Subarea runoff = 8.964(CFS)
Total initial stream area = 4.040(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.532(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station 105.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1275.400(Ft.)
Downstream point elevation = 1262.700(Ft.)
Channel length thru subarea = 944.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 14.049(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 14.049(CFS)
Depth of flow = 0.338(Ft.), Average velocity = 1.902(Ft/s)
2
Channel flow top width = 38.756(Ft.)
Flow Velocity = 1.90(Ft/s)
Travel time = 8.27 min.
Time of concentration = 27.40 min.
Critical depth = 0.301(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Adjusted SCS curve number for AMC 3 = 66.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.564(In/Hr)
Rainfall intensity = 2.416(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.694
Subarea runoff = 10.109(CFS) for 7.330(Ac.)
Total runoff = 19.073(CFS)
Effective area this stream = 11.37(Ac.)
Total Study Area (Main Stream No. 1) = 11.37(Ac.)
Area averaged Fm value = 0.553(In/Hr)
Depth of flow = 0.384(Ft.), Average velocity = 2.055(Ft/s)
Critical depth = 0.344(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station 105.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 11.370(Ac.)
Runoff from this stream = 19.073(CFS)
Time of concentration = 27.40 min.
Rainfall intensity = 2.416(In/Hr)
Area averaged loss rate (Fm) = 0.5526(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9678
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 104.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Adjusted SCS curve number for AMC 3 = 70.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.532(In/Hr)
Initial subarea data:
Initial area flow distance = 779.000(Ft.)
Top (of initial area) elevation = 1289.000(Ft.)
Bottom (of initial area) elevation = 1274.700(Ft.)
Difference in elevation = 14.300(Ft.)
Slope = 0.01836 s(%)= 1.84
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 22.525 min.
Rainfall intensity = 2.718(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.724
Subarea runoff = 7.849(CFS)
Total initial stream area = 3.990(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.532(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 105.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1274.700(Ft.)
3
Downstream point elevation = 1262.700(Ft.)
Channel length thru subarea = 707.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 11.879(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 11.879(CFS)
Depth of flow = 0.299(Ft.), Average velocity = 1.988(Ft/s)
Channel flow top width = 34.926(Ft.)
Flow Velocity = 1.99(Ft/s)
Travel time = 5.93 min.
Time of concentration = 28.45 min.
Critical depth = 0.277(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Adjusted SCS curve number for AMC 3 = 66.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.564(In/Hr)
Rainfall intensity = 2.363(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.690
Subarea runoff = 8.001(CFS) for 5.730(Ac.)
Total runoff = 15.850(CFS)
Effective area this stream = 9.72(Ac.)
Total Study Area (Main Stream No. 2) = 21.09(Ac.)
Area averaged Fm value = 0.551(In/Hr)
Depth of flow = 0.338(Ft.), Average velocity = 2.139(Ft/s)
Critical depth = 0.316(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 105.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 9.720(Ac.)
Runoff from this stream = 15.850(CFS)
Time of concentration = 28.45 min.
Rainfall intensity = 2.363(In/Hr)
Area averaged loss rate (Fm) = 0.5508(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9705
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 19.07 11.370 27.40 0.553 2.416
2 15.85 9.720 28.45 0.551 2.363
Qmax(1) =
1.000 * 1.000 * 19.073) +
1.030 * 0.963 * 15.850) + = 34.793
Qmax(2) =
0.971 * 1.000 * 19.073) +
1.000 * 1.000 * 15.850) + = 34.373
Total of 2 main streams to confluence:
Flow rates before confluence point:
20.073 16.850
Maximum flow rates at confluence using above data:
34.793 34.373
Area of streams before confluence:
11.370 9.720
Effective area values after confluence:
20.732 21.090
4
Results of confluence:
Total flow rate = 34.793(CFS)
Time of concentration = 27.404 min.
Effective stream area after confluence = 20.732(Ac.)
Study area average Pervious fraction(Ap) = 0.969
Study area average soil loss rate(Fm) = 0.552(In/Hr)
Study area total = 21.09(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 106.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1262.700(Ft.)
Downstream point elevation = 1259.000(Ft.)
Channel length thru subarea = 543.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 37.838(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 37.838(CFS)
Depth of flow = 0.584(Ft.), Average velocity = 1.893(Ft/s)
Channel flow top width = 63.421(Ft.)
Flow Velocity = 1.89(Ft/s)
Travel time = 4.78 min.
Time of concentration = 32.18 min.
Critical depth = 0.465(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Adjusted SCS curve number for AMC 3 = 66.00
Pervious ratio(Ap) = 0.9000 Max loss rate(Fm)= 0.534(In/Hr)
Rainfall intensity = 2.194(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.675
Subarea runoff = 6.000(CFS) for 6.790(Ac.)
Total runoff = 40.792(CFS)
Effective area this stream = 27.52(Ac.)
Total Study Area (Main Stream No. 1) = 27.88(Ac.)
Area averaged Fm value = 0.547(In/Hr)
Depth of flow = 0.602(Ft.), Average velocity = 1.929(Ft/s)
Critical depth = 0.480(Ft.)
End of computations, Total Study Area = 27.88 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area
effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 0.952
Area averaged SCS curve number = 47.2
1
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2014 Version 9.0
Rational Hydrology Study Date: 04/11/22
------------------------------------------------------------------------
265.22.22
100-YEAR RATIONAL TABLING METHOD FOR AREA B
PRE-PROJECT CONDITION
FN: ARBPRE100.RSB
------------------------------------------------------------------------
Program License Serial Number 6279
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
------------------------------------------------------------------------
Rational hydrology study storm event year is 100.0
Computed rainfall intensity:
Storm year = 100.00 1 hour rainfall = 1.510 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 3
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 201.000 to Point/Station 202.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Adjusted SCS curve number for AMC 3 = 70.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.532(In/Hr)
Initial subarea data:
Initial area flow distance = 565.000(Ft.)
Top (of initial area) elevation = 1287.000(Ft.)
Bottom (of initial area) elevation = 1275.000(Ft.)
Difference in elevation = 12.000(Ft.)
Slope = 0.02124 s(%)= 2.12
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.240 min.
Rainfall intensity = 2.988(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.740
Subarea runoff = 7.005(CFS)
Total initial stream area = 3.170(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.532(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 202.000 to Point/Station 203.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1275.000(Ft.)
Downstream point elevation = 1270.000(Ft.)
Channel length thru subarea = 388.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 10.138(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 10.138(CFS)
Depth of flow = 0.297(Ft.), Average velocity = 1.723(Ft/s)
2
Channel flow top width = 34.663(Ft.)
Flow Velocity = 1.72(Ft/s)
Travel time = 3.75 min.
Time of concentration = 22.99 min.
Critical depth = 0.258(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Adjusted SCS curve number for AMC 3 = 66.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.564(In/Hr)
Rainfall intensity = 2.685(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.716
Subarea runoff = 6.199(CFS) for 3.700(Ac.)
Total runoff = 13.204(CFS)
Effective area this stream = 6.87(Ac.)
Total Study Area (Main Stream No. 1) = 6.87(Ac.)
Area averaged Fm value = 0.549(In/Hr)
Depth of flow = 0.332(Ft.), Average velocity = 1.843(Ft/s)
Critical depth = 0.291(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 203.000 to Point/Station 204.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1270.000(Ft.)
Downstream point elevation = 1269.000(Ft.)
Channel length thru subarea = 255.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 18.711(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 18.711(CFS)
Depth of flow = 0.491(Ft.), Average velocity = 1.290(Ft/s)
Channel flow top width = 54.097(Ft.)
Flow Velocity = 1.29(Ft/s)
Travel time = 3.30 min.
Time of concentration = 26.29 min.
Critical depth = 0.340(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Adjusted SCS curve number for AMC 3 = 66.00
Pervious ratio(Ap) = 0.9800 Max loss rate(Fm)= 0.581(In/Hr)
Rainfall intensity = 2.478(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.695
Subarea runoff = 10.920(CFS) for 7.150(Ac.)
Total runoff = 24.124(CFS)
Effective area this stream = 14.02(Ac.)
Total Study Area (Main Stream No. 1) = 14.02(Ac.)
Area averaged Fm value = 0.566(In/Hr)
Depth of flow = 0.544(Ft.), Average velocity = 1.375(Ft/s)
Critical depth = 0.383(Ft.)
End of computations, Total Study Area = 14.02 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area
effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 0.977
Area averaged SCS curve number = 46.9
APPENDIX A.2: RATIONAL METHOD ANALYSIS, 25-YEAR STORM EVENT
1
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2014 Version 9.0
Rational Hydrology Study Date: 04/11/22
------------------------------------------------------------------------
265.22.22
25-YEAR RATIONAL TABLING METHOD FOR AREA A
PRE-PROJECT CONDITION
FN: ARAPRE25.RSB
------------------------------------------------------------------------
Program License Serial Number 6279
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
------------------------------------------------------------------------
Rational hydrology study storm event year is 25.0
Computed rainfall intensity:
Storm year = 25.00 1 hour rainfall = 1.150 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 101.000 to Point/Station 102.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 569.000(Ft.)
Top (of initial area) elevation = 1288.000(Ft.)
Bottom (of initial area) elevation = 1275.400(Ft.)
Difference in elevation = 12.600(Ft.)
Slope = 0.02214 s(%)= 2.21
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.134 min.
Rainfall intensity = 2.283(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.581
Subarea runoff = 5.358(CFS)
Total initial stream area = 4.040(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station 105.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1275.400(Ft.)
Downstream point elevation = 1262.700(Ft.)
Channel length thru subarea = 944.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 7.699(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 7.699(CFS)
Depth of flow = 0.261(Ft.), Average velocity = 1.633(Ft/s)
Channel flow top width = 31.113(Ft.)
2
Flow Velocity = 1.63(Ft/s)
Travel time = 9.64 min.
Time of concentration = 28.77 min.
Critical depth = 0.227(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.813(In/Hr)
Rainfall intensity = 1.787(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.491
Subarea runoff = 4.628(CFS) for 7.330(Ac.)
Total runoff = 9.986(CFS)
Effective area this stream = 11.37(Ac.)
Total Study Area (Main Stream No. 1) = 11.37(Ac.)
Area averaged Fm value = 0.812(In/Hr)
Depth of flow = 0.292(Ft.), Average velocity = 1.745(Ft/s)
Critical depth = 0.256(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station 105.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 11.370(Ac.)
Runoff from this stream = 9.986(CFS)
Time of concentration = 28.77 min.
Rainfall intensity = 1.787(In/Hr)
Area averaged loss rate (Fm) = 0.8116(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9678
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 104.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 779.000(Ft.)
Top (of initial area) elevation = 1289.000(Ft.)
Bottom (of initial area) elevation = 1274.700(Ft.)
Difference in elevation = 14.300(Ft.)
Slope = 0.01836 s(%)= 1.84
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 22.525 min.
Rainfall intensity = 2.070(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.548
Subarea runoff = 4.527(CFS)
Total initial stream area = 3.990(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 105.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1274.700(Ft.)
Downstream point elevation = 1262.700(Ft.)
Channel length thru subarea = 707.000(Ft.)
Channel base width = 5.000(Ft.)
3
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 6.474(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 6.474(CFS)
Depth of flow = 0.230(Ft.), Average velocity = 1.703(Ft/s)
Channel flow top width = 28.021(Ft.)
Flow Velocity = 1.70(Ft/s)
Travel time = 6.92 min.
Time of concentration = 29.44 min.
Critical depth = 0.209(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.813(In/Hr)
Rainfall intensity = 1.763(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.486
Subarea runoff = 3.796(CFS) for 5.730(Ac.)
Total runoff = 8.323(CFS)
Effective area this stream = 9.72(Ac.)
Total Study Area (Main Stream No. 2) = 21.09(Ac.)
Area averaged Fm value = 0.811(In/Hr)
Depth of flow = 0.257(Ft.), Average velocity = 1.816(Ft/s)
Critical depth = 0.234(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 105.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 9.720(Ac.)
Runoff from this stream = 8.323(CFS)
Time of concentration = 29.44 min.
Rainfall intensity = 1.763(In/Hr)
Area averaged loss rate (Fm) = 0.8114(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9705
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 9.99 11.370 28.77 0.812 1.787
2 8.32 9.720 29.44 0.811 1.763
Qmax(1) =
1.000 * 1.000 * 9.986) +
1.026 * 0.977 * 8.323) + = 18.329
Qmax(2) =
0.975 * 1.000 * 9.986) +
1.000 * 1.000 * 8.323) + = 18.056
Total of 2 main streams to confluence:
Flow rates before confluence point:
10.986 9.323
Maximum flow rates at confluence using above data:
18.329 18.056
Area of streams before confluence:
11.370 9.720
Effective area values after confluence:
20.868 21.090
Results of confluence:
Total flow rate = 18.329(CFS)
Time of concentration = 28.769 min.
Effective stream area after confluence = 20.868(Ac.)
4
Study area average Pervious fraction(Ap) = 0.969
Study area average soil loss rate(Fm) = 0.812(In/Hr)
Study area total = 21.09(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 106.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1262.700(Ft.)
Downstream point elevation = 1259.000(Ft.)
Channel length thru subarea = 543.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 19.199(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 19.199(CFS)
Depth of flow = 0.443(Ft.), Average velocity = 1.596(Ft/s)
Channel flow top width = 49.301(Ft.)
Flow Velocity = 1.60(Ft/s)
Travel time = 5.67 min.
Time of concentration = 34.44 min.
Critical depth = 0.344(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9000 Max loss rate(Fm)= 0.770(In/Hr)
Rainfall intensity = 1.605(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.451
Subarea runoff = 1.666(CFS) for 6.790(Ac.)
Total runoff = 19.994(CFS)
Effective area this stream = 27.66(Ac.)
Total Study Area (Main Stream No. 1) = 27.88(Ac.)
Area averaged Fm value = 0.801(In/Hr)
Depth of flow = 0.450(Ft.), Average velocity = 1.613(Ft/s)
Critical depth = 0.352(Ft.)
End of computations, Total Study Area = 27.88 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area
effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 0.952
Area averaged SCS curve number = 47.2
1
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2014 Version 9.0
Rational Hydrology Study Date: 04/11/22
------------------------------------------------------------------------
265.22.22
25-YEAR RATIONAL TABLING METHOD FOR AREA B
PRE-PROJECT CONDITION
FN: ARBPRE25.RSB
------------------------------------------------------------------------
Program License Serial Number 6279
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
------------------------------------------------------------------------
Rational hydrology study storm event year is 25.0
Computed rainfall intensity:
Storm year = 25.00 1 hour rainfall = 1.150 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 201.000 to Point/Station 202.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 565.000(Ft.)
Top (of initial area) elevation = 1287.000(Ft.)
Bottom (of initial area) elevation = 1275.000(Ft.)
Difference in elevation = 12.000(Ft.)
Slope = 0.02124 s(%)= 2.12
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.240 min.
Rainfall intensity = 2.275(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.580
Subarea runoff = 4.182(CFS)
Total initial stream area = 3.170(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 202.000 to Point/Station 203.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1275.000(Ft.)
Downstream point elevation = 1270.000(Ft.)
Channel length thru subarea = 388.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 5.841(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 5.841(CFS)
Depth of flow = 0.234(Ft.), Average velocity = 1.498(Ft/s)
Channel flow top width = 28.375(Ft.)
2
Flow Velocity = 1.50(Ft/s)
Travel time = 4.32 min.
Time of concentration = 23.56 min.
Critical depth = 0.199(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.813(In/Hr)
Rainfall intensity = 2.015(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.538
Subarea runoff = 3.261(CFS) for 3.700(Ac.)
Total runoff = 7.444(CFS)
Effective area this stream = 6.87(Ac.)
Total Study Area (Main Stream No. 1) = 6.87(Ac.)
Area averaged Fm value = 0.811(In/Hr)
Depth of flow = 0.260(Ft.), Average velocity = 1.593(Ft/s)
Critical depth = 0.223(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 203.000 to Point/Station 204.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1270.000(Ft.)
Downstream point elevation = 1269.000(Ft.)
Channel length thru subarea = 255.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 10.168(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 10.168(CFS)
Depth of flow = 0.382(Ft.), Average velocity = 1.106(Ft/s)
Channel flow top width = 43.171(Ft.)
Flow Velocity = 1.11(Ft/s)
Travel time = 3.84 min.
Time of concentration = 27.40 min.
Critical depth = 0.258(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9800 Max loss rate(Fm)= 0.838(In/Hr)
Rainfall intensity = 1.840(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.497
Subarea runoff = 5.368(CFS) for 7.150(Ac.)
Total runoff = 12.812(CFS)
Effective area this stream = 14.02(Ac.)
Total Study Area (Main Stream No. 1) = 14.02(Ac.)
Area averaged Fm value = 0.825(In/Hr)
Depth of flow = 0.420(Ft.), Average velocity = 1.172(Ft/s)
Critical depth = 0.287(Ft.)
End of computations, Total Study Area = 14.02 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area
effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 0.977
Area averaged SCS curve number = 46.9
APPENDIX A.3: RATIONAL METHOD ANALYSIS, 10-YEAR STORM EVENT
1
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2014 Version 9.0
Rational Hydrology Study Date: 04/11/22
------------------------------------------------------------------------
265.22.22
10-YEAR RATIONAL TABLING METHOD FOR AREA A
PRE-PROJECT CONDITION
FN: ARAPRE10.RSB
------------------------------------------------------------------------
Program License Serial Number 6279
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
------------------------------------------------------------------------
Rational hydrology study storm event year is 10.0
Computed rainfall intensity:
Storm year = 10.00 1 hour rainfall = 0.931 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 101.000 to Point/Station 102.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 569.000(Ft.)
Top (of initial area) elevation = 1288.000(Ft.)
Bottom (of initial area) elevation = 1275.400(Ft.)
Difference in elevation = 12.600(Ft.)
Slope = 0.02214 s(%)= 2.21
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.134 min.
Rainfall intensity = 1.848(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.506
Subarea runoff = 3.777(CFS)
Total initial stream area = 4.040(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station 105.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1275.400(Ft.)
Downstream point elevation = 1262.700(Ft.)
Channel length thru subarea = 944.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 5.023(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 5.023(CFS)
Depth of flow = 0.217(Ft.), Average velocity = 1.464(Ft/s)
Channel flow top width = 26.667(Ft.)
2
Flow Velocity = 1.46(Ft/s)
Travel time = 10.75 min.
Time of concentration = 29.88 min.
Critical depth = 0.186(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.813(In/Hr)
Rainfall intensity = 1.415(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.384
Subarea runoff = 2.392(CFS) for 7.330(Ac.)
Total runoff = 6.169(CFS)
Effective area this stream = 11.37(Ac.)
Total Study Area (Main Stream No. 1) = 11.37(Ac.)
Area averaged Fm value = 0.812(In/Hr)
Depth of flow = 0.237(Ft.), Average velocity = 1.543(Ft/s)
Critical depth = 0.205(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station 105.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 11.370(Ac.)
Runoff from this stream = 6.169(CFS)
Time of concentration = 29.88 min.
Rainfall intensity = 1.415(In/Hr)
Area averaged loss rate (Fm) = 0.8116(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9678
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 104.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 779.000(Ft.)
Top (of initial area) elevation = 1289.000(Ft.)
Bottom (of initial area) elevation = 1274.700(Ft.)
Difference in elevation = 14.300(Ft.)
Slope = 0.01836 s(%)= 1.84
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 22.525 min.
Rainfall intensity = 1.676(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.465
Subarea runoff = 3.111(CFS)
Total initial stream area = 3.990(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 105.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1274.700(Ft.)
Downstream point elevation = 1262.700(Ft.)
Channel length thru subarea = 707.000(Ft.)
Channel base width = 5.000(Ft.)
3
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 4.193(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 4.193(CFS)
Depth of flow = 0.190(Ft.), Average velocity = 1.524(Ft/s)
Channel flow top width = 23.988(Ft.)
Flow Velocity = 1.52(Ft/s)
Travel time = 7.73 min.
Time of concentration = 30.26 min.
Critical depth = 0.170(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.813(In/Hr)
Rainfall intensity = 1.404(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.380
Subarea runoff = 2.071(CFS) for 5.730(Ac.)
Total runoff = 5.183(CFS)
Effective area this stream = 9.72(Ac.)
Total Study Area (Main Stream No. 2) = 21.09(Ac.)
Area averaged Fm value = 0.811(In/Hr)
Depth of flow = 0.209(Ft.), Average velocity = 1.609(Ft/s)
Critical depth = 0.188(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 105.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 9.720(Ac.)
Runoff from this stream = 5.183(CFS)
Time of concentration = 30.26 min.
Rainfall intensity = 1.404(In/Hr)
Area averaged loss rate (Fm) = 0.8114(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9705
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 6.17 11.370 29.88 0.812 1.415
2 5.18 9.720 30.26 0.811 1.404
Qmax(1) =
1.000 * 1.000 * 6.169) +
1.018 * 0.987 * 5.183) + = 11.379
Qmax(2) =
0.982 * 1.000 * 6.169) +
1.000 * 1.000 * 5.183) + = 11.243
Total of 2 main streams to confluence:
Flow rates before confluence point:
7.169 6.183
Maximum flow rates at confluence using above data:
11.379 11.243
Area of streams before confluence:
11.370 9.720
Effective area values after confluence:
20.968 21.090
Results of confluence:
Total flow rate = 11.379(CFS)
Time of concentration = 29.881 min.
Effective stream area after confluence = 20.968(Ac.)
4
Study area average Pervious fraction(Ap) = 0.969
Study area average soil loss rate(Fm) = 0.812(In/Hr)
Study area total = 21.09(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 106.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1262.700(Ft.)
Downstream point elevation = 1259.000(Ft.)
Channel length thru subarea = 543.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 11.424(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 11.424(CFS)
Depth of flow = 0.357(Ft.), Average velocity = 1.400(Ft/s)
Channel flow top width = 40.702(Ft.)
Flow Velocity = 1.40(Ft/s)
Travel time = 6.46 min.
Time of concentration = 36.34 min.
Critical depth = 0.273(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9000 Max loss rate(Fm)= 0.770(In/Hr)
Rainfall intensity = 1.258(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.327
Subarea runoff = 0.021(CFS) for 6.790(Ac.)
Total runoff = 11.400(CFS)
Effective area this stream = 27.76(Ac.)
Total Study Area (Main Stream No. 1) = 27.88(Ac.)
Area averaged Fm value = 0.801(In/Hr)
Depth of flow = 0.357(Ft.), Average velocity = 1.400(Ft/s)
Critical depth = 0.273(Ft.)
End of computations, Total Study Area = 27.88 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area
effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 0.952
Area averaged SCS curve number = 47.2
1
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2014 Version 9.0
Rational Hydrology Study Date: 04/11/22
------------------------------------------------------------------------
265.22.22
10-YEAR RATIONAL TABLING METHOD FOR AREA B
PRE-PROJECT CONDITION
FN: ARBPRE10.RSB
------------------------------------------------------------------------
Program License Serial Number 6279
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
------------------------------------------------------------------------
Rational hydrology study storm event year is 10.0
Computed rainfall intensity:
Storm year = 10.00 1 hour rainfall = 0.931 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 201.000 to Point/Station 202.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
SCS curve number for soil(AMC 2) = 84.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.301(In/Hr)
Initial subarea data:
Initial area flow distance = 565.000(Ft.)
Top (of initial area) elevation = 1287.000(Ft.)
Bottom (of initial area) elevation = 1275.000(Ft.)
Difference in elevation = 12.000(Ft.)
Slope = 0.02124 s(%)= 2.12
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.240 min.
Rainfall intensity = 1.842(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.753
Subarea runoff = 4.398(CFS)
Total initial stream area = 3.170(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.301(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 202.000 to Point/Station 203.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1275.000(Ft.)
Downstream point elevation = 1270.000(Ft.)
Channel length thru subarea = 388.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 5.478(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 5.478(CFS)
Depth of flow = 0.227(Ft.), Average velocity = 1.473(Ft/s)
Channel flow top width = 27.726(Ft.)
2
Flow Velocity = 1.47(Ft/s)
Travel time = 4.39 min.
Time of concentration = 23.63 min.
Critical depth = 0.193(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.813(In/Hr)
Rainfall intensity = 1.628(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.581
Subarea runoff = 2.106(CFS) for 3.700(Ac.)
Total runoff = 6.504(CFS)
Effective area this stream = 6.87(Ac.)
Total Study Area (Main Stream No. 1) = 6.87(Ac.)
Area averaged Fm value = 0.576(In/Hr)
Depth of flow = 0.245(Ft.), Average velocity = 1.539(Ft/s)
Critical depth = 0.209(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 203.000 to Point/Station 204.000
**** IMPROVED CHANNEL TRAVEL TIME ****
______________________________________________________________________
Upstream point elevation = 1270.000(Ft.)
Downstream point elevation = 1269.000(Ft.)
Channel length thru subarea = 255.000(Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z' of left channel bank = 50.000
Slope or 'Z' of right channel bank = 50.000
Estimated mean flow rate at midpoint of channel = 8.144(CFS)
Manning's 'N' = 0.030
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 8.144(CFS)
Depth of flow = 0.348(Ft.), Average velocity = 1.046(Ft/s)
Channel flow top width = 39.783(Ft.)
Flow Velocity = 1.05(Ft/s)
Travel time = 4.06 min.
Time of concentration = 27.69 min.
Critical depth = 0.232(Ft.)
Adding area flow to channel
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9800 Max loss rate(Fm)= 0.838(In/Hr)
Rainfall intensity = 1.481(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.468
Subarea runoff = 3.217(CFS) for 7.150(Ac.)
Total runoff = 9.722(CFS)
Effective area this stream = 14.02(Ac.)
Total Study Area (Main Stream No. 1) = 14.02(Ac.)
Area averaged Fm value = 0.710(In/Hr)
Depth of flow = 0.375(Ft.), Average velocity = 1.094(Ft/s)
Critical depth = 0.254(Ft.)
End of computations, Total Study Area = 14.02 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area
effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 0.977
Area averaged SCS curve number = 54.6
APPENDIX B: POST-PROJECT RATIONAL METHOD HYDROLOGY
ANALYSES
APPENDIX B.1: RATIONAL METHOD ANALYSIS, 100-YEAR STORM EVENT
1
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2014 Version 9.0
Rational Hydrology Study Date: 04/11/22
------------------------------------------------------------------------
265.22.22
100-YEAR RATIONAL TABLING METHOD FOR AREA A
POST-PROJECT CONDITION
FN: ARAPOST100.RSB
------------------------------------------------------------------------
Program License Serial Number 6279
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
------------------------------------------------------------------------
Rational hydrology study storm event year is 100.0
Computed rainfall intensity:
Storm year = 100.00 1 hour rainfall = 1.510 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 3
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 101.000 to Point/Station 102.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Adjusted SCS curve number for AMC 3 = 52.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.079(In/Hr)
Initial subarea data:
Initial area flow distance = 745.000(Ft.)
Top (of initial area) elevation = 1285.000(Ft.)
Bottom (of initial area) elevation = 1276.000(Ft.)
Difference in elevation = 9.000(Ft.)
Slope = 0.01208 s(%)= 1.21
TC = k(0.304)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.359 min.
Rainfall intensity = 4.332(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.884
Subarea runoff = 17.111(CFS)
Total initial stream area = 4.470(Ac.)
Pervious area fraction = 0.100
Initial area Fm value = 0.079(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station 103.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1271.000(Ft.)
Downstream point/station elevation = 1270.700(Ft.)
Pipe length = 595.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 17.111(CFS)
Nearest computed pipe diameter = 39.00(In.)
Calculated individual pipe flow = 17.111(CFS)
Normal flow depth in pipe = 29.58(In.)
Flow top width inside pipe = 33.39(In.)
Critical Depth = 15.48(In.)
Pipe flow velocity = 2.54(Ft/s)
Travel time through pipe = 3.91 min.
2
Time of concentration (TC) = 14.27 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 103.000
**** SUBAREA FLOW ADDITION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Adjusted SCS curve number for AMC 3 = 52.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.079(In/Hr)
Time of concentration = 14.27 min.
Rainfall intensity = 3.575(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.880
Subarea runoff = 0.321(CFS) for 1.070(Ac.)
Total runoff = 17.432(CFS)
Effective area this stream = 5.54(Ac.)
Total Study Area (Main Stream No. 1) = 5.54(Ac.)
Area averaged Fm value = 0.079(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 104.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1270.700(Ft.)
Downstream point/station elevation = 1270.500(Ft.)
Pipe length = 29.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 17.432(CFS)
Nearest computed pipe diameter = 24.00(In.)
Calculated individual pipe flow = 17.432(CFS)
Normal flow depth in pipe = 18.28(In.)
Flow top width inside pipe = 20.45(In.)
Critical Depth = 18.06(In.)
Pipe flow velocity = 6.79(Ft/s)
Travel time through pipe = 0.07 min.
Time of concentration (TC) = 14.34 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 104.000
**** SUBAREA FLOW ADDITION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Adjusted SCS curve number for AMC 3 = 52.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.079(In/Hr)
Time of concentration = 14.34 min.
Rainfall intensity = 3.564(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.880
Subarea runoff = 10.581(CFS) for 3.390(Ac.)
Total runoff = 28.014(CFS)
Effective area this stream = 8.93(Ac.)
Total Study Area (Main Stream No. 1) = 8.93(Ac.)
Area averaged Fm value = 0.079(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 105.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
3
Upstream point/station elevation = 1270.500(Ft.)
Downstream point/station elevation = 1268.000(Ft.)
Pipe length = 155.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 28.014(CFS)
Nearest computed pipe diameter = 24.00(In.)
Calculated individual pipe flow = 28.014(CFS)
Normal flow depth in pipe = 19.15(In.)
Flow top width inside pipe = 19.28(In.)
Critical Depth = 21.95(In.)
Pipe flow velocity = 10.42(Ft/s)
Travel time through pipe = 0.25 min.
Time of concentration (TC) = 14.59 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 111.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1268.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 795.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 28.014(CFS)
Nearest computed pipe diameter = 39.00(In.)
Calculated individual pipe flow = 28.014(CFS)
Normal flow depth in pipe = 27.33(In.)
Flow top width inside pipe = 35.72(In.)
Critical Depth = 20.02(In.)
Pipe flow velocity = 4.51(Ft/s)
Travel time through pipe = 2.94 min.
Time of concentration (TC) = 17.53 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 111.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 8.930(Ac.)
Runoff from this stream = 28.014(CFS)
Time of concentration = 17.53 min.
Rainfall intensity = 3.160(In/Hr)
Area averaged loss rate (Fm) = 0.0785(In/Hr)
Area averaged Pervious ratio (Ap) = 0.1000
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 106.000 to Point/Station 107.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Adjusted SCS curve number for AMC 3 = 52.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.079(In/Hr)
Initial subarea data:
Initial area flow distance = 479.000(Ft.)
Top (of initial area) elevation = 1288.000(Ft.)
Bottom (of initial area) elevation = 1280.000(Ft.)
Difference in elevation = 8.000(Ft.)
Slope = 0.01670 s(%)= 1.67
TC = k(0.304)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 8.137 min.
Rainfall intensity = 5.007(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.886
Subarea runoff = 2.040(CFS)
Total initial stream area = 0.460(Ac.)
4
Pervious area fraction = 0.100
Initial area Fm value = 0.079(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 107.000 to Point/Station 108.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1280.000(Ft.)
End of street segment elevation = 1270.000(Ft.)
Length of street segment = 557.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 2.803(CFS)
Depth of flow = 0.310(Ft.), Average velocity = 2.897(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 9.170(Ft.)
Flow velocity = 2.90(Ft/s)
Travel time = 3.20 min. TC = 11.34 min.
Adding area flow to street
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Adjusted SCS curve number for AMC 3 = 52.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.079(In/Hr)
Rainfall intensity = 4.103(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.883
Subarea runoff = 1.473(CFS) for 0.510(Ac.)
Total runoff = 3.513(CFS)
Effective area this stream = 0.97(Ac.)
Total Study Area (Main Stream No. 2) = 9.90(Ac.)
Area averaged Fm value = 0.079(In/Hr)
Street flow at end of street = 3.513(CFS)
Half street flow at end of street = 3.513(CFS)
Depth of flow = 0.329(Ft.), Average velocity = 3.049(Ft/s)
Flow width (from curb towards crown)= 10.127(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 108.000 to Point/Station 111.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1267.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 39.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 3.513(CFS)
Nearest computed pipe diameter = 15.00(In.)
Calculated individual pipe flow = 3.513(CFS)
Normal flow depth in pipe = 8.55(In.)
Flow top width inside pipe = 14.85(In.)
Critical Depth = 9.08(In.)
Pipe flow velocity = 4.86(Ft/s)
Travel time through pipe = 0.13 min.
Time of concentration (TC) = 11.47 min.
5
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 108.000 to Point/Station 111.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.970(Ac.)
Runoff from this stream = 3.513(CFS)
Time of concentration = 11.47 min.
Rainfall intensity = 4.074(In/Hr)
Area averaged loss rate (Fm) = 0.0785(In/Hr)
Area averaged Pervious ratio (Ap) = 0.1000
Program is now starting with Main Stream No. 3
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 109.000 to Point/Station 110.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Adjusted SCS curve number for AMC 3 = 70.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.532(In/Hr)
Initial subarea data:
Initial area flow distance = 953.000(Ft.)
Top (of initial area) elevation = 1287.000(Ft.)
Bottom (of initial area) elevation = 1270.000(Ft.)
Difference in elevation = 17.000(Ft.)
Slope = 0.01784 s(%)= 1.78
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 24.557 min.
Rainfall intensity = 2.581(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.714
Subarea runoff = 8.665(CFS)
Total initial stream area = 4.700(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.532(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 110.000 to Point/Station 111.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1267.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 64.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 8.665(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 8.665(CFS)
Normal flow depth in pipe = 14.19(In.)
Flow top width inside pipe = 19.66(In.)
Critical Depth = 13.11(In.)
Pipe flow velocity = 5.01(Ft/s)
Travel time through pipe = 0.21 min.
Time of concentration (TC) = 24.77 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 110.000 to Point/Station 111.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 3
Stream flow area = 4.700(Ac.)
Runoff from this stream = 8.665(CFS)
Time of concentration = 24.77 min.
Rainfall intensity = 2.568(In/Hr)
6
Area averaged loss rate (Fm) = 0.5325(In/Hr)
Area averaged Pervious ratio (Ap) = 1.0000
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 28.01 8.930 17.53 0.079 3.160
2 3.51 0.970 11.47 0.079 4.074
3 8.66 4.700 24.77 0.532 2.568
Qmax(1) =
1.000 * 1.000 * 28.014) +
0.771 * 1.000 * 3.513) +
1.291 * 0.708 * 8.665) + = 38.638
Qmax(2) =
1.297 * 0.655 * 28.014) +
1.000 * 1.000 * 3.513) +
1.740 * 0.463 * 8.665) + = 34.281
Qmax(3) =
0.808 * 1.000 * 28.014) +
0.623 * 1.000 * 3.513) +
1.000 * 1.000 * 8.665) + = 33.483
Total of 3 main streams to confluence:
Flow rates before confluence point:
29.014 4.513 9.665
Maximum flow rates at confluence using above data:
38.638 34.281 33.483
Area of streams before confluence:
8.930 0.970 4.700
Effective area values after confluence:
13.226 8.994 14.600
Results of confluence:
Total flow rate = 38.638(CFS)
Time of concentration = 17.527 min.
Effective stream area after confluence = 13.226(Ac.)
Study area average Pervious fraction(Ap) = 0.390
Study area average soil loss rate(Fm) = 0.225(In/Hr)
Study area total = 14.60(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 111.000 to Point/Station 112.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1266.700(Ft.)
Downstream point/station elevation = 1266.500(Ft.)
Pipe length = 55.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 38.638(CFS)
Nearest computed pipe diameter = 36.00(In.)
Calculated individual pipe flow = 38.638(CFS)
Normal flow depth in pipe = 28.31(In.)
Flow top width inside pipe = 29.51(In.)
Critical Depth = 24.27(In.)
Pipe flow velocity = 6.48(Ft/s)
Travel time through pipe = 0.14 min.
Time of concentration (TC) = 17.67 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 111.000 to Point/Station 112.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 13.226(Ac.)
Runoff from this stream = 38.638(CFS)
Time of concentration = 17.67 min.
7
Rainfall intensity = 3.145(In/Hr)
Area averaged loss rate (Fm) = 0.2247(In/Hr)
Area averaged Pervious ratio (Ap) = 0.3897
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 201.000 to Point/Station 202.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Adjusted SCS curve number for AMC 3 = 70.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.532(In/Hr)
Initial subarea data:
Initial area flow distance = 565.000(Ft.)
Top (of initial area) elevation = 1287.000(Ft.)
Bottom (of initial area) elevation = 1275.000(Ft.)
Difference in elevation = 12.000(Ft.)
Slope = 0.02124 s(%)= 2.12
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.240 min.
Rainfall intensity = 2.988(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.740
Subarea runoff = 7.005(CFS)
Total initial stream area = 3.170(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.532(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 202.000 to Point/Station 203.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1275.000(Ft.)
End of street segment elevation = 1270.000(Ft.)
Length of street segment = 535.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 11.383(CFS)
Depth of flow = 0.500(Ft.), Average velocity = 3.147(Ft/s)
Warning: depth of flow exceeds top of curb
Distance that curb overflow reaches into property = 0.01(Ft.)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 18.683(Ft.)
Flow velocity = 3.15(Ft/s)
Travel time = 2.83 min. TC = 22.07 min.
Adding area flow to street
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Adjusted SCS curve number for AMC 3 = 66.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.564(In/Hr)
Rainfall intensity = 2.751(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.720
8
Subarea runoff = 8.698(CFS) for 4.760(Ac.)
Total runoff = 15.703(CFS)
Effective area this stream = 7.93(Ac.)
Total Study Area (Main Stream No. 2) = 22.53(Ac.)
Area averaged Fm value = 0.551(In/Hr)
Street flow at end of street = 15.703(CFS)
Half street flow at end of street = 15.703(CFS)
Depth of flow = 0.557(Ft.), Average velocity = 3.257(Ft/s)
Warning: depth of flow exceeds top of curb
Distance that curb overflow reaches into property = 2.28(Ft.)
Flow width (from curb towards crown)= 21.516(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 203.000 to Point/Station 204.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1267.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 38.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 15.703(CFS)
Nearest computed pipe diameter = 24.00(In.)
Calculated individual pipe flow = 15.703(CFS)
Normal flow depth in pipe = 15.96(In.)
Flow top width inside pipe = 22.65(In.)
Critical Depth = 17.16(In.)
Pipe flow velocity = 7.08(Ft/s)
Travel time through pipe = 0.09 min.
Time of concentration (TC) = 22.16 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 204.000 to Point/Station 112.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1266.700(Ft.)
Downstream point/station elevation = 1266.500(Ft.)
Pipe length = 103.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 15.703(CFS)
Nearest computed pipe diameter = 30.00(In.)
Calculated individual pipe flow = 15.703(CFS)
Normal flow depth in pipe = 21.61(In.)
Flow top width inside pipe = 26.93(In.)
Critical Depth = 16.05(In.)
Pipe flow velocity = 4.15(Ft/s)
Travel time through pipe = 0.41 min.
Time of concentration (TC) = 22.58 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 204.000 to Point/Station 112.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 7.930(Ac.)
Runoff from this stream = 15.703(CFS)
Time of concentration = 22.58 min.
Rainfall intensity = 2.714(In/Hr)
Area averaged loss rate (Fm) = 0.5512(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9700
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 38.64 13.226 17.67 0.225 3.145
2 15.70 7.930 22.58 0.551 2.714
Qmax(1) =
1.000 * 1.000 * 38.638) +
9
1.199 * 0.783 * 15.703) + = 53.370
Qmax(2) =
0.853 * 1.000 * 38.638) +
1.000 * 1.000 * 15.703) + = 48.649
Total of 2 main streams to confluence:
Flow rates before confluence point:
39.638 16.703
Maximum flow rates at confluence using above data:
53.370 48.649
Area of streams before confluence:
13.226 7.930
Effective area values after confluence:
19.431 21.156
Results of confluence:
Total flow rate = 53.370(CFS)
Time of concentration = 17.668 min.
Effective stream area after confluence = 19.431(Ac.)
Study area average Pervious fraction(Ap) = 0.607
Study area average soil loss rate(Fm) = 0.347(In/Hr)
Study area total = 21.16(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 112.000 to Point/Station 118.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1266.500(Ft.)
Downstream point/station elevation = 1257.000(Ft.)
Pipe length = 1261.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 53.370(CFS)
Nearest computed pipe diameter = 36.00(In.)
Calculated individual pipe flow = 53.370(CFS)
Normal flow depth in pipe = 27.28(In.)
Flow top width inside pipe = 30.85(In.)
Critical Depth = 28.49(In.)
Pipe flow velocity = 9.30(Ft/s)
Travel time through pipe = 2.26 min.
Time of concentration (TC) = 19.93 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 112.000 to Point/Station 118.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 19.431(Ac.)
Runoff from this stream = 53.370(CFS)
Time of concentration = 19.93 min.
Rainfall intensity = 2.925(In/Hr)
Area averaged loss rate (Fm) = 0.3470(In/Hr)
Area averaged Pervious ratio (Ap) = 0.6072
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 113.000 to Point/Station 114.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Adjusted SCS curve number for AMC 3 = 70.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.532(In/Hr)
Initial subarea data:
10
Initial area flow distance = 406.000(Ft.)
Top (of initial area) elevation = 1279.000(Ft.)
Bottom (of initial area) elevation = 1271.800(Ft.)
Difference in elevation = 7.200(Ft.)
Slope = 0.01773 s(%)= 1.77
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 17.476 min.
Rainfall intensity = 3.165(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.749
Subarea runoff = 6.113(CFS)
Total initial stream area = 2.580(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.532(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 114.000 to Point/Station 116.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1271.800(Ft.)
End of street segment elevation = 1262.700(Ft.)
Length of street segment = 686.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 10.531(CFS)
Depth of flow = 0.465(Ft.), Average velocity = 3.526(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 16.912(Ft.)
Flow velocity = 3.53(Ft/s)
Travel time = 3.24 min. TC = 20.72 min.
Adding area flow to street
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Adjusted SCS curve number for AMC 3 = 66.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.564(In/Hr)
Rainfall intensity = 2.858(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.726
Subarea runoff = 8.764(CFS) for 4.590(Ac.)
Total runoff = 14.877(CFS)
Effective area this stream = 7.17(Ac.)
Total Study Area (Main Stream No. 2) = 29.70(Ac.)
Area averaged Fm value = 0.552(In/Hr)
Street flow at end of street = 14.877(CFS)
Half street flow at end of street = 14.877(CFS)
Depth of flow = 0.517(Ft.), Average velocity = 3.775(Ft/s)
Warning: depth of flow exceeds top of curb
Distance that curb overflow reaches into property = 0.68(Ft.)
Flow width (from curb towards crown)= 19.514(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 114.000 to Point/Station 116.000
**** CONFLUENCE OF MINOR STREAMS ****
______________________________________________________________________
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 7.170(Ac.)
Runoff from this stream = 14.877(CFS)
Time of concentration = 20.72 min.
11
Rainfall intensity = 2.858(In/Hr)
Area averaged loss rate (Fm) = 0.5524(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9680
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 115.000 to Point/Station 116.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Adjusted SCS curve number for AMC 3 = 70.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.532(In/Hr)
Initial subarea data:
Initial area flow distance = 796.000(Ft.)
Top (of initial area) elevation = 1276.000(Ft.)
Bottom (of initial area) elevation = 1262.700(Ft.)
Difference in elevation = 13.300(Ft.)
Slope = 0.01671 s(%)= 1.67
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 23.152 min.
Rainfall intensity = 2.674(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.721
Subarea runoff = 7.728(CFS)
Total initial stream area = 4.010(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.532(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 115.000 to Point/Station 116.000
**** CONFLUENCE OF MINOR STREAMS ****
______________________________________________________________________
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 4.010(Ac.)
Runoff from this stream = 7.728(CFS)
Time of concentration = 23.15 min.
Rainfall intensity = 2.674(In/Hr)
Area averaged loss rate (Fm) = 0.5325(In/Hr)
Area averaged Pervious ratio (Ap) = 1.0000
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 14.88 7.170 20.72 0.552 2.858
2 7.73 4.010 23.15 0.532 2.674
Qmax(1) =
1.000 * 1.000 * 14.877) +
1.086 * 0.895 * 7.728) + = 22.388
Qmax(2) =
0.920 * 1.000 * 14.877) +
1.000 * 1.000 * 7.728) + = 21.417
Total of 2 streams to confluence:
Flow rates before confluence point:
14.877 7.728
Maximum flow rates at confluence using above data:
22.388 21.417
Area of streams before confluence:
7.170 4.010
Effective area values after confluence:
10.759 11.180
Results of confluence:
Total flow rate = 22.388(CFS)
Time of concentration = 20.719 min.
12
Effective stream area after confluence = 10.759(Ac.)
Study area average Pervious fraction(Ap) = 0.979
Study area average soil loss rate(Fm) = 0.545(In/Hr)
Study area total (this main stream) = 11.18(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 116.000 to Point/Station 117.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1262.700(Ft.)
End of street segment elevation = 1260.300(Ft.)
Length of street segment = 479.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 28.004(CFS)
Depth of flow = 0.712(Ft.), Average velocity = 3.090(Ft/s)
Warning: depth of flow exceeds top of curb
Note: depth of flow exceeds top of street crown.
Distance that curb overflow reaches into property = 8.48(Ft.)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 22.000(Ft.)
Flow velocity = 3.09(Ft/s)
Travel time = 2.58 min. TC = 23.30 min.
Adding area flow to street
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Adjusted SCS curve number for AMC 3 = 66.00
Pervious ratio(Ap) = 0.9000 Max loss rate(Fm)= 0.534(In/Hr)
Rainfall intensity = 2.663(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.717
Subarea runoff = 11.133(CFS) for 6.790(Ac.)
Total runoff = 33.521(CFS)
Effective area this stream = 17.55(Ac.)
Total Study Area (Main Stream No. 2) = 40.50(Ac.)
Area averaged Fm value = 0.541(In/Hr)
Street flow at end of street = 33.521(CFS)
Half street flow at end of street = 33.521(CFS)
Depth of flow = 0.751(Ft.), Average velocity = 3.257(Ft/s)
Warning: depth of flow exceeds top of curb
Note: depth of flow exceeds top of street crown.
Distance that curb overflow reaches into property = 10.05(Ft.)
Flow width (from curb towards crown)= 22.000(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 117.000 to Point/Station 118.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1257.300(Ft.)
Downstream point/station elevation = 1257.000(Ft.)
Pipe length = 18.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 33.521(CFS)
Nearest computed pipe diameter = 27.00(In.)
Calculated individual pipe flow = 33.521(CFS)
Normal flow depth in pipe = 18.91(In.)
Flow top width inside pipe = 24.73(In.)
Critical Depth = 23.77(In.)
13
Pipe flow velocity = 11.26(Ft/s)
Travel time through pipe = 0.03 min.
Time of concentration (TC) = 23.33 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 117.000 to Point/Station 118.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 17.549(Ac.)
Runoff from this stream = 33.521(CFS)
Time of concentration = 23.33 min.
Rainfall intensity = 2.661(In/Hr)
Area averaged loss rate (Fm) = 0.5409(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9487
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 53.37 19.431 19.93 0.347 2.925
2 33.52 17.549 23.33 0.541 2.661
Qmax(1) =
1.000 * 1.000 * 53.370) +
1.124 * 0.854 * 33.521) + = 85.568
Qmax(2) =
0.898 * 1.000 * 53.370) +
1.000 * 1.000 * 33.521) + = 81.429
Total of 2 main streams to confluence:
Flow rates before confluence point:
54.370 34.521
Maximum flow rates at confluence using above data:
85.568 81.429
Area of streams before confluence:
19.431 17.549
Effective area values after confluence:
34.422 36.980
Results of confluence:
Total flow rate = 85.568(CFS)
Time of concentration = 19.929 min.
Effective stream area after confluence = 34.422(Ac.)
Study area average Pervious fraction(Ap) = 0.769
Study area average soil loss rate(Fm) = 0.439(In/Hr)
Study area total = 36.98(Ac.)
End of computations, Total Study Area = 40.50 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area
effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 0.752
Area averaged SCS curve number = 44.0
APPENDIX B.2: RATIONAL METHOD ANALYSIS, 25-YEAR STORM EVENT
1
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2014 Version 9.0
Rational Hydrology Study Date: 04/11/22
------------------------------------------------------------------------
265.22.22
25-YEAR RATIONAL TABLING METHOD FOR AREA A
POST-PROJECT CONDITION
FN: ARAPOST25.RSB
------------------------------------------------------------------------
Program License Serial Number 6279
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
------------------------------------------------------------------------
Rational hydrology study storm event year is 25.0
Computed rainfall intensity:
Storm year = 25.00 1 hour rainfall = 1.150 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 101.000 to Point/Station 102.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.098(In/Hr)
Initial subarea data:
Initial area flow distance = 745.000(Ft.)
Top (of initial area) elevation = 1285.000(Ft.)
Bottom (of initial area) elevation = 1276.000(Ft.)
Difference in elevation = 9.000(Ft.)
Slope = 0.01208 s(%)= 1.21
TC = k(0.304)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.359 min.
Rainfall intensity = 3.299(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.873
Subarea runoff = 12.879(CFS)
Total initial stream area = 4.470(Ac.)
Pervious area fraction = 0.100
Initial area Fm value = 0.098(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station 103.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1271.000(Ft.)
Downstream point/station elevation = 1270.700(Ft.)
Pipe length = 595.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 12.879(CFS)
Nearest computed pipe diameter = 36.00(In.)
Calculated individual pipe flow = 12.879(CFS)
Normal flow depth in pipe = 25.73(In.)
Flow top width inside pipe = 32.51(In.)
Critical Depth = 13.67(In.)
Pipe flow velocity = 2.38(Ft/s)
Travel time through pipe = 4.16 min.
Time of concentration (TC) = 14.52 min.
2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 103.000
**** SUBAREA FLOW ADDITION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.098(In/Hr)
Time of concentration = 14.52 min.
Rainfall intensity = 2.694(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.867
Subarea runoff = 0.066(CFS) for 1.070(Ac.)
Total runoff = 12.945(CFS)
Effective area this stream = 5.54(Ac.)
Total Study Area (Main Stream No. 1) = 5.54(Ac.)
Area averaged Fm value = 0.098(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 104.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1270.700(Ft.)
Downstream point/station elevation = 1270.500(Ft.)
Pipe length = 29.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 12.945(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 12.945(CFS)
Normal flow depth in pipe = 16.92(In.)
Flow top width inside pipe = 16.61(In.)
Critical Depth = 16.08(In.)
Pipe flow velocity = 6.24(Ft/s)
Travel time through pipe = 0.08 min.
Time of concentration (TC) = 14.60 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 104.000
**** SUBAREA FLOW ADDITION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.098(In/Hr)
Time of concentration = 14.60 min.
Rainfall intensity = 2.685(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.867
Subarea runoff = 7.852(CFS) for 3.390(Ac.)
Total runoff = 20.796(CFS)
Effective area this stream = 8.93(Ac.)
Total Study Area (Main Stream No. 1) = 8.93(Ac.)
Area averaged Fm value = 0.098(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 105.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1270.500(Ft.)
Downstream point/station elevation = 1268.000(Ft.)
Pipe length = 155.00(Ft.) Manning's N = 0.013
3
No. of pipes = 1 Required pipe flow = 20.796(CFS)
Nearest computed pipe diameter = 24.00(In.)
Calculated individual pipe flow = 20.796(CFS)
Normal flow depth in pipe = 15.14(In.)
Flow top width inside pipe = 23.16(In.)
Critical Depth = 19.61(In.)
Pipe flow velocity = 9.97(Ft/s)
Travel time through pipe = 0.26 min.
Time of concentration (TC) = 14.86 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 111.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1268.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 795.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 20.796(CFS)
Nearest computed pipe diameter = 33.00(In.)
Calculated individual pipe flow = 20.796(CFS)
Normal flow depth in pipe = 26.25(In.)
Flow top width inside pipe = 26.62(In.)
Critical Depth = 18.07(In.)
Pipe flow velocity = 4.10(Ft/s)
Travel time through pipe = 3.23 min.
Time of concentration (TC) = 18.09 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 111.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 8.930(Ac.)
Runoff from this stream = 20.796(CFS)
Time of concentration = 18.09 min.
Rainfall intensity = 2.361(In/Hr)
Area averaged loss rate (Fm) = 0.0978(In/Hr)
Area averaged Pervious ratio (Ap) = 0.1000
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 106.000 to Point/Station 107.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.098(In/Hr)
Initial subarea data:
Initial area flow distance = 479.000(Ft.)
Top (of initial area) elevation = 1288.000(Ft.)
Bottom (of initial area) elevation = 1280.000(Ft.)
Difference in elevation = 8.000(Ft.)
Slope = 0.01670 s(%)= 1.67
TC = k(0.304)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 8.137 min.
Rainfall intensity = 3.813(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.877
Subarea runoff = 1.538(CFS)
Total initial stream area = 0.460(Ac.)
Pervious area fraction = 0.100
Initial area Fm value = 0.098(In/Hr)
4
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 107.000 to Point/Station 108.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1280.000(Ft.)
End of street segment elevation = 1270.000(Ft.)
Length of street segment = 557.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 2.117(CFS)
Depth of flow = 0.288(Ft.), Average velocity = 2.724(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 8.066(Ft.)
Flow velocity = 2.72(Ft/s)
Travel time = 3.41 min. TC = 11.55 min.
Adding area flow to street
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.098(In/Hr)
Rainfall intensity = 3.091(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.872
Subarea runoff = 1.075(CFS) for 0.510(Ac.)
Total runoff = 2.613(CFS)
Effective area this stream = 0.97(Ac.)
Total Study Area (Main Stream No. 2) = 9.90(Ac.)
Area averaged Fm value = 0.098(In/Hr)
Street flow at end of street = 2.613(CFS)
Half street flow at end of street = 2.613(CFS)
Depth of flow = 0.304(Ft.), Average velocity = 2.852(Ft/s)
Flow width (from curb towards crown)= 8.886(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 108.000 to Point/Station 111.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1267.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 39.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 2.613(CFS)
Nearest computed pipe diameter = 12.00(In.)
Calculated individual pipe flow = 2.613(CFS)
Normal flow depth in pipe = 8.39(In.)
Flow top width inside pipe = 11.01(In.)
Critical Depth = 8.32(In.)
Pipe flow velocity = 4.45(Ft/s)
Travel time through pipe = 0.15 min.
Time of concentration (TC) = 11.69 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 108.000 to Point/Station 111.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
5
In Main Stream number: 2
Stream flow area = 0.970(Ac.)
Runoff from this stream = 2.613(CFS)
Time of concentration = 11.69 min.
Rainfall intensity = 3.068(In/Hr)
Area averaged loss rate (Fm) = 0.0978(In/Hr)
Area averaged Pervious ratio (Ap) = 0.1000
Program is now starting with Main Stream No. 3
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 109.000 to Point/Station 110.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 953.000(Ft.)
Top (of initial area) elevation = 1287.000(Ft.)
Bottom (of initial area) elevation = 1270.000(Ft.)
Difference in elevation = 17.000(Ft.)
Slope = 0.01784 s(%)= 1.78
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 24.557 min.
Rainfall intensity = 1.966(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.529
Subarea runoff = 4.890(CFS)
Total initial stream area = 4.700(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 110.000 to Point/Station 111.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1267.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 64.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 4.890(CFS)
Nearest computed pipe diameter = 18.00(In.)
Calculated individual pipe flow = 4.890(CFS)
Normal flow depth in pipe = 10.89(In.)
Flow top width inside pipe = 17.60(In.)
Critical Depth = 10.20(In.)
Pipe flow velocity = 4.38(Ft/s)
Travel time through pipe = 0.24 min.
Time of concentration (TC) = 24.80 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 110.000 to Point/Station 111.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 3
Stream flow area = 4.700(Ac.)
Runoff from this stream = 4.890(CFS)
Time of concentration = 24.80 min.
Rainfall intensity = 1.954(In/Hr)
Area averaged loss rate (Fm) = 0.8095(In/Hr)
Area averaged Pervious ratio (Ap) = 1.0000
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
6
1 20.80 8.930 18.09 0.098 2.361
2 2.61 0.970 11.69 0.098 3.068
3 4.89 4.700 24.80 0.810 1.954
Qmax(1) =
1.000 * 1.000 * 20.796) +
0.762 * 1.000 * 2.613) +
1.356 * 0.729 * 4.890) + = 27.624
Qmax(2) =
1.312 * 0.646 * 20.796) +
1.000 * 1.000 * 2.613) +
1.974 * 0.471 * 4.890) + = 24.802
Qmax(3) =
0.820 * 1.000 * 20.796) +
0.625 * 1.000 * 2.613) +
1.000 * 1.000 * 4.890) + = 23.576
Total of 3 main streams to confluence:
Flow rates before confluence point:
21.796 3.613 5.890
Maximum flow rates at confluence using above data:
27.624 24.802 23.576
Area of streams before confluence:
8.930 0.970 4.700
Effective area values after confluence:
13.328 8.958 14.600
Results of confluence:
Total flow rate = 27.624(CFS)
Time of concentration = 18.087 min.
Effective stream area after confluence = 13.328(Ac.)
Study area average Pervious fraction(Ap) = 0.390
Study area average soil loss rate(Fm) = 0.327(In/Hr)
Study area total = 14.60(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 111.000 to Point/Station 112.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1266.700(Ft.)
Downstream point/station elevation = 1266.500(Ft.)
Pipe length = 55.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 27.624(CFS)
Nearest computed pipe diameter = 33.00(In.)
Calculated individual pipe flow = 27.624(CFS)
Normal flow depth in pipe = 23.72(In.)
Flow top width inside pipe = 29.67(In.)
Critical Depth = 20.93(In.)
Pipe flow velocity = 6.04(Ft/s)
Travel time through pipe = 0.15 min.
Time of concentration (TC) = 18.24 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 111.000 to Point/Station 112.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 13.328(Ac.)
Runoff from this stream = 27.624(CFS)
Time of concentration = 18.24 min.
Rainfall intensity = 2.350(In/Hr)
Area averaged loss rate (Fm) = 0.3269(In/Hr)
Area averaged Pervious ratio (Ap) = 0.3897
Program is now starting with Main Stream No. 2
7
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 201.000 to Point/Station 202.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 565.000(Ft.)
Top (of initial area) elevation = 1287.000(Ft.)
Bottom (of initial area) elevation = 1275.000(Ft.)
Difference in elevation = 12.000(Ft.)
Slope = 0.02124 s(%)= 2.12
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.240 min.
Rainfall intensity = 2.275(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.580
Subarea runoff = 4.182(CFS)
Total initial stream area = 3.170(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 202.000 to Point/Station 203.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1275.000(Ft.)
End of street segment elevation = 1270.000(Ft.)
Length of street segment = 535.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 6.642(CFS)
Depth of flow = 0.429(Ft.), Average velocity = 2.762(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 15.095(Ft.)
Flow velocity = 2.76(Ft/s)
Travel time = 3.23 min. TC = 22.47 min.
Adding area flow to street
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.813(In/Hr)
Rainfall intensity = 2.073(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.548
Subarea runoff = 4.823(CFS) for 4.760(Ac.)
Total runoff = 9.005(CFS)
Effective area this stream = 7.93(Ac.)
Total Study Area (Main Stream No. 2) = 22.53(Ac.)
Area averaged Fm value = 0.811(In/Hr)
Street flow at end of street = 9.005(CFS)
Half street flow at end of street = 9.005(CFS)
Depth of flow = 0.467(Ft.), Average velocity = 2.973(Ft/s)
Flow width (from curb towards crown)= 17.036(Ft.)
8
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 203.000 to Point/Station 204.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1267.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 38.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 9.005(CFS)
Nearest computed pipe diameter = 18.00(In.)
Calculated individual pipe flow = 9.005(CFS)
Normal flow depth in pipe = 14.20(In.)
Flow top width inside pipe = 14.69(In.)
Critical Depth = 13.94(In.)
Pipe flow velocity = 6.02(Ft/s)
Travel time through pipe = 0.11 min.
Time of concentration (TC) = 22.57 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 204.000 to Point/Station 112.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1266.700(Ft.)
Downstream point/station elevation = 1266.500(Ft.)
Pipe length = 103.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 9.005(CFS)
Nearest computed pipe diameter = 24.00(In.)
Calculated individual pipe flow = 9.005(CFS)
Normal flow depth in pipe = 17.86(In.)
Flow top width inside pipe = 20.94(In.)
Critical Depth = 12.84(In.)
Pipe flow velocity = 3.59(Ft/s)
Travel time through pipe = 0.48 min.
Time of concentration (TC) = 23.05 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 204.000 to Point/Station 112.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 7.930(Ac.)
Runoff from this stream = 9.005(CFS)
Time of concentration = 23.05 min.
Rainfall intensity = 2.042(In/Hr)
Area averaged loss rate (Fm) = 0.8115(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9700
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 27.62 13.328 18.24 0.327 2.350
2 9.01 7.930 23.05 0.811 2.042
Qmax(1) =
1.000 * 1.000 * 27.624) +
1.250 * 0.791 * 9.005) + = 36.533
Qmax(2) =
0.848 * 1.000 * 27.624) +
1.000 * 1.000 * 9.005) + = 32.423
Total of 2 main streams to confluence:
Flow rates before confluence point:
28.624 10.005
Maximum flow rates at confluence using above data:
36.533 32.423
Area of streams before confluence:
13.328 7.930
9
Effective area values after confluence:
19.602 21.258
Results of confluence:
Total flow rate = 36.533(CFS)
Time of concentration = 18.239 min.
Effective stream area after confluence = 19.602(Ac.)
Study area average Pervious fraction(Ap) = 0.606
Study area average soil loss rate(Fm) = 0.508(In/Hr)
Study area total = 21.26(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 112.000 to Point/Station 118.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1266.500(Ft.)
Downstream point/station elevation = 1257.000(Ft.)
Pipe length = 1261.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 36.533(CFS)
Nearest computed pipe diameter = 33.00(In.)
Calculated individual pipe flow = 36.533(CFS)
Normal flow depth in pipe = 22.24(In.)
Flow top width inside pipe = 30.94(In.)
Critical Depth = 24.16(In.)
Pipe flow velocity = 8.58(Ft/s)
Travel time through pipe = 2.45 min.
Time of concentration (TC) = 20.69 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 112.000 to Point/Station 118.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 19.602(Ac.)
Runoff from this stream = 36.533(CFS)
Time of concentration = 20.69 min.
Rainfall intensity = 2.178(In/Hr)
Area averaged loss rate (Fm) = 0.5077(In/Hr)
Area averaged Pervious ratio (Ap) = 0.6062
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 113.000 to Point/Station 114.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 406.000(Ft.)
Top (of initial area) elevation = 1279.000(Ft.)
Bottom (of initial area) elevation = 1271.800(Ft.)
Difference in elevation = 7.200(Ft.)
Slope = 0.01773 s(%)= 1.77
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 17.476 min.
Rainfall intensity = 2.411(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.598
Subarea runoff = 3.718(CFS)
Total initial stream area = 2.580(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
10
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 114.000 to Point/Station 116.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1271.800(Ft.)
End of street segment elevation = 1262.700(Ft.)
Length of street segment = 686.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 6.204(CFS)
Depth of flow = 0.400(Ft.), Average velocity = 3.103(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 13.684(Ft.)
Flow velocity = 3.10(Ft/s)
Travel time = 3.68 min. TC = 21.16 min.
Adding area flow to street
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.813(In/Hr)
Rainfall intensity = 2.149(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.560
Subarea runoff = 4.914(CFS) for 4.590(Ac.)
Total runoff = 8.631(CFS)
Effective area this stream = 7.17(Ac.)
Total Study Area (Main Stream No. 2) = 29.70(Ac.)
Area averaged Fm value = 0.812(In/Hr)
Street flow at end of street = 8.631(CFS)
Half street flow at end of street = 8.631(CFS)
Depth of flow = 0.439(Ft.), Average velocity = 3.360(Ft/s)
Flow width (from curb towards crown)= 15.628(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 114.000 to Point/Station 116.000
**** CONFLUENCE OF MINOR STREAMS ****
______________________________________________________________________
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 7.170(Ac.)
Runoff from this stream = 8.631(CFS)
Time of concentration = 21.16 min.
Rainfall intensity = 2.149(In/Hr)
Area averaged loss rate (Fm) = 0.8116(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9680
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 115.000 to Point/Station 116.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
11
Initial subarea data:
Initial area flow distance = 796.000(Ft.)
Top (of initial area) elevation = 1276.000(Ft.)
Bottom (of initial area) elevation = 1262.700(Ft.)
Difference in elevation = 13.300(Ft.)
Slope = 0.01671 s(%)= 1.67
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 23.152 min.
Rainfall intensity = 2.036(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.542
Subarea runoff = 4.427(CFS)
Total initial stream area = 4.010(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 115.000 to Point/Station 116.000
**** CONFLUENCE OF MINOR STREAMS ****
______________________________________________________________________
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 4.010(Ac.)
Runoff from this stream = 4.427(CFS)
Time of concentration = 23.15 min.
Rainfall intensity = 2.036(In/Hr)
Area averaged loss rate (Fm) = 0.8095(In/Hr)
Area averaged Pervious ratio (Ap) = 1.0000
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 8.63 7.170 21.16 0.812 2.149
2 4.43 4.010 23.15 0.810 2.036
Qmax(1) =
1.000 * 1.000 * 8.631) +
1.092 * 0.914 * 4.427) + = 13.050
Qmax(2) =
0.916 * 1.000 * 8.631) +
1.000 * 1.000 * 4.427) + = 12.330
Total of 2 streams to confluence:
Flow rates before confluence point:
8.631 4.427
Maximum flow rates at confluence using above data:
13.050 12.330
Area of streams before confluence:
7.170 4.010
Effective area values after confluence:
10.835 11.180
Results of confluence:
Total flow rate = 13.050(CFS)
Time of concentration = 21.161 min.
Effective stream area after confluence = 10.835(Ac.)
Study area average Pervious fraction(Ap) = 0.979
Study area average soil loss rate(Fm) = 0.811(In/Hr)
Study area total (this main stream) = 11.18(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 116.000 to Point/Station 117.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1262.700(Ft.)
End of street segment elevation = 1260.300(Ft.)
Length of street segment = 479.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
12
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 15.981(CFS)
Depth of flow = 0.608(Ft.), Average velocity = 2.615(Ft/s)
Warning: depth of flow exceeds top of curb
Note: depth of flow exceeds top of street crown.
Distance that curb overflow reaches into property = 4.32(Ft.)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 22.000(Ft.)
Flow velocity = 2.62(Ft/s)
Travel time = 3.05 min. TC = 24.21 min.
Adding area flow to street
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9000 Max loss rate(Fm)= 0.770(In/Hr)
Rainfall intensity = 1.982(In/Hr) for a 25.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.539
Subarea runoff = 5.780(CFS) for 6.790(Ac.)
Total runoff = 18.831(CFS)
Effective area this stream = 17.63(Ac.)
Total Study Area (Main Stream No. 2) = 40.50(Ac.)
Area averaged Fm value = 0.795(In/Hr)
Street flow at end of street = 18.831(CFS)
Half street flow at end of street = 18.831(CFS)
Depth of flow = 0.636(Ft.), Average velocity = 2.748(Ft/s)
Warning: depth of flow exceeds top of curb
Note: depth of flow exceeds top of street crown.
Distance that curb overflow reaches into property = 5.43(Ft.)
Flow width (from curb towards crown)= 22.000(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 117.000 to Point/Station 118.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1257.300(Ft.)
Downstream point/station elevation = 1257.000(Ft.)
Pipe length = 18.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 18.831(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 18.831(CFS)
Normal flow depth in pipe = 15.89(In.)
Flow top width inside pipe = 18.02(In.)
Critical Depth = 18.82(In.)
Pipe flow velocity = 9.65(Ft/s)
Travel time through pipe = 0.03 min.
Time of concentration (TC) = 24.24 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 117.000 to Point/Station 118.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 17.625(Ac.)
Runoff from this stream = 18.831(CFS)
Time of concentration = 24.24 min.
Rainfall intensity = 1.981(In/Hr)
Area averaged loss rate (Fm) = 0.7951(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9489
Summary of stream data:
13
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 36.53 19.602 20.69 0.508 2.178
2 18.83 17.625 24.24 0.795 1.981
Qmax(1) =
1.000 * 1.000 * 36.533) +
1.167 * 0.853 * 18.831) + = 55.282
Qmax(2) =
0.882 * 1.000 * 36.533) +
1.000 * 1.000 * 18.831) + = 51.040
Total of 2 main streams to confluence:
Flow rates before confluence point:
37.533 19.831
Maximum flow rates at confluence using above data:
55.282 51.040
Area of streams before confluence:
19.602 17.625
Effective area values after confluence:
34.642 37.227
Results of confluence:
Total flow rate = 55.282(CFS)
Time of concentration = 20.689 min.
Effective stream area after confluence = 34.642(Ac.)
Study area average Pervious fraction(Ap) = 0.768
Study area average soil loss rate(Fm) = 0.644(In/Hr)
Study area total = 37.23(Ac.)
End of computations, Total Study Area = 40.50 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area
effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 0.752
Area averaged SCS curve number = 44.0
APPENDIX B.3: RATIONAL METHOD ANALYSIS, 10-YEAR STORM EVENT
1
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2014 Version 9.0
Rational Hydrology Study Date: 04/11/22
------------------------------------------------------------------------
265.22.22
10-YEAR RATIONAL TABLING METHOD FOR AREA A
POST-PROJECT CONDITION
FN: ARAPOST10.RSB
------------------------------------------------------------------------
Program License Serial Number 6279
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
------------------------------------------------------------------------
Rational hydrology study storm event year is 10.0
Computed rainfall intensity:
Storm year = 10.00 1 hour rainfall = 0.931 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 101.000 to Point/Station 102.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.098(In/Hr)
Initial subarea data:
Initial area flow distance = 745.000(Ft.)
Top (of initial area) elevation = 1285.000(Ft.)
Bottom (of initial area) elevation = 1276.000(Ft.)
Difference in elevation = 9.000(Ft.)
Slope = 0.01208 s(%)= 1.21
TC = k(0.304)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.359 min.
Rainfall intensity = 2.671(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.867
Subarea runoff = 10.351(CFS)
Total initial stream area = 4.470(Ac.)
Pervious area fraction = 0.100
Initial area Fm value = 0.098(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station 103.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1271.000(Ft.)
Downstream point/station elevation = 1270.700(Ft.)
Pipe length = 595.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 10.351(CFS)
Nearest computed pipe diameter = 33.00(In.)
Calculated individual pipe flow = 10.351(CFS)
Normal flow depth in pipe = 23.86(In.)
Flow top width inside pipe = 29.54(In.)
Critical Depth = 12.53(In.)
Pipe flow velocity = 2.25(Ft/s)
Travel time through pipe = 4.40 min.
Time of concentration (TC) = 14.76 min.
2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 103.000
**** SUBAREA FLOW ADDITION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.098(In/Hr)
The area added to the existing stream causes a
a lower flow rate of Q = 10.281(CFS)
therefore the upstream flow rate of Q = 10.351(CFS) is being used
Time of concentration = 14.76 min.
Rainfall intensity = 2.160(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.859
Subarea runoff = 0.000(CFS) for 1.070(Ac.)
Total runoff = 10.351(CFS)
Effective area this stream = 5.54(Ac.)
Total Study Area (Main Stream No. 1) = 5.54(Ac.)
Area averaged Fm value = 0.098(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 104.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1270.700(Ft.)
Downstream point/station elevation = 1270.500(Ft.)
Pipe length = 29.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 10.351(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 10.351(CFS)
Normal flow depth in pipe = 14.04(In.)
Flow top width inside pipe = 19.77(In.)
Critical Depth = 14.39(In.)
Pipe flow velocity = 6.06(Ft/s)
Travel time through pipe = 0.08 min.
Time of concentration (TC) = 14.84 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 104.000
**** SUBAREA FLOW ADDITION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.098(In/Hr)
Time of concentration = 14.84 min.
Rainfall intensity = 2.153(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.859
Subarea runoff = 6.164(CFS) for 3.390(Ac.)
Total runoff = 16.515(CFS)
Effective area this stream = 8.93(Ac.)
Total Study Area (Main Stream No. 1) = 8.93(Ac.)
Area averaged Fm value = 0.098(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 105.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
3
Upstream point/station elevation = 1270.500(Ft.)
Downstream point/station elevation = 1268.000(Ft.)
Pipe length = 155.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 16.515(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 16.515(CFS)
Normal flow depth in pipe = 14.48(In.)
Flow top width inside pipe = 19.43(In.)
Critical Depth = 17.93(In.)
Pipe flow velocity = 9.34(Ft/s)
Travel time through pipe = 0.28 min.
Time of concentration (TC) = 15.12 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 111.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1268.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 795.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 16.515(CFS)
Nearest computed pipe diameter = 30.00(In.)
Calculated individual pipe flow = 16.515(CFS)
Normal flow depth in pipe = 24.47(In.)
Flow top width inside pipe = 23.27(In.)
Critical Depth = 16.48(In.)
Pipe flow velocity = 3.85(Ft/s)
Travel time through pipe = 3.44 min.
Time of concentration (TC) = 18.56 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 111.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 8.930(Ac.)
Runoff from this stream = 16.515(CFS)
Time of concentration = 18.56 min.
Rainfall intensity = 1.883(In/Hr)
Area averaged loss rate (Fm) = 0.0978(In/Hr)
Area averaged Pervious ratio (Ap) = 0.1000
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 106.000 to Point/Station 107.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.098(In/Hr)
Initial subarea data:
Initial area flow distance = 479.000(Ft.)
Top (of initial area) elevation = 1288.000(Ft.)
Bottom (of initial area) elevation = 1280.000(Ft.)
Difference in elevation = 8.000(Ft.)
Slope = 0.01670 s(%)= 1.67
TC = k(0.304)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 8.137 min.
Rainfall intensity = 3.087(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.871
Subarea runoff = 1.238(CFS)
Total initial stream area = 0.460(Ac.)
Pervious area fraction = 0.100
4
Initial area Fm value = 0.098(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 107.000 to Point/Station 108.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1280.000(Ft.)
End of street segment elevation = 1270.000(Ft.)
Length of street segment = 557.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 1.694(CFS)
Depth of flow = 0.272(Ft.), Average velocity = 2.598(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 7.247(Ft.)
Flow velocity = 2.60(Ft/s)
Travel time = 3.57 min. TC = 11.71 min.
Adding area flow to street
COMMERCIAL subarea type
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 32.00
Pervious ratio(Ap) = 0.1000 Max loss rate(Fm)= 0.098(In/Hr)
Rainfall intensity = 2.482(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.865
Subarea runoff = 0.843(CFS) for 0.510(Ac.)
Total runoff = 2.081(CFS)
Effective area this stream = 0.97(Ac.)
Total Study Area (Main Stream No. 2) = 9.90(Ac.)
Area averaged Fm value = 0.098(In/Hr)
Street flow at end of street = 2.081(CFS)
Half street flow at end of street = 2.081(CFS)
Depth of flow = 0.287(Ft.), Average velocity = 2.714(Ft/s)
Flow width (from curb towards crown)= 8.001(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 108.000 to Point/Station 111.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1267.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 39.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 2.081(CFS)
Nearest computed pipe diameter = 12.00(In.)
Calculated individual pipe flow = 2.081(CFS)
Normal flow depth in pipe = 7.16(In.)
Flow top width inside pipe = 11.77(In.)
Critical Depth = 7.40(In.)
Pipe flow velocity = 4.26(Ft/s)
Travel time through pipe = 0.15 min.
Time of concentration (TC) = 11.86 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 108.000 to Point/Station 111.000
5
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.970(Ac.)
Runoff from this stream = 2.081(CFS)
Time of concentration = 11.86 min.
Rainfall intensity = 2.462(In/Hr)
Area averaged loss rate (Fm) = 0.0978(In/Hr)
Area averaged Pervious ratio (Ap) = 0.1000
Program is now starting with Main Stream No. 3
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 109.000 to Point/Station 110.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 953.000(Ft.)
Top (of initial area) elevation = 1287.000(Ft.)
Bottom (of initial area) elevation = 1270.000(Ft.)
Difference in elevation = 17.000(Ft.)
Slope = 0.01784 s(%)= 1.78
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 24.557 min.
Rainfall intensity = 1.591(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.442
Subarea runoff = 3.307(CFS)
Total initial stream area = 4.700(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 110.000 to Point/Station 111.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1267.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 64.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 3.307(CFS)
Nearest computed pipe diameter = 15.00(In.)
Calculated individual pipe flow = 3.307(CFS)
Normal flow depth in pipe = 9.67(In.)
Flow top width inside pipe = 14.36(In.)
Critical Depth = 8.80(In.)
Pipe flow velocity = 3.95(Ft/s)
Travel time through pipe = 0.27 min.
Time of concentration (TC) = 24.83 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 110.000 to Point/Station 111.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 3
Stream flow area = 4.700(Ac.)
Runoff from this stream = 3.307(CFS)
Time of concentration = 24.83 min.
Rainfall intensity = 1.581(In/Hr)
Area averaged loss rate (Fm) = 0.8095(In/Hr)
Area averaged Pervious ratio (Ap) = 1.0000
Summary of stream data:
6
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 16.52 8.930 18.56 0.098 1.883
2 2.08 0.970 11.86 0.098 2.462
3 3.31 4.700 24.83 0.810 1.581
Qmax(1) =
1.000 * 1.000 * 16.515) +
0.755 * 1.000 * 2.081) +
1.391 * 0.747 * 3.307) + = 21.524
Qmax(2) =
1.325 * 0.639 * 16.515) +
1.000 * 1.000 * 2.081) +
2.143 * 0.478 * 3.307) + = 19.453
Qmax(3) =
0.831 * 1.000 * 16.515) +
0.627 * 1.000 * 2.081) +
1.000 * 1.000 * 3.307) + = 18.335
Total of 3 main streams to confluence:
Flow rates before confluence point:
17.515 3.081 4.307
Maximum flow rates at confluence using above data:
21.524 19.453 18.335
Area of streams before confluence:
8.930 0.970 4.700
Effective area values after confluence:
13.413 8.924 14.600
Results of confluence:
Total flow rate = 21.524(CFS)
Time of concentration = 18.556 min.
Effective stream area after confluence = 13.413(Ac.)
Study area average Pervious fraction(Ap) = 0.390
Study area average soil loss rate(Fm) = 0.327(In/Hr)
Study area total = 14.60(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 111.000 to Point/Station 112.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1266.700(Ft.)
Downstream point/station elevation = 1266.500(Ft.)
Pipe length = 55.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 21.524(CFS)
Nearest computed pipe diameter = 30.00(In.)
Calculated individual pipe flow = 21.524(CFS)
Normal flow depth in pipe = 21.66(In.)
Flow top width inside pipe = 26.88(In.)
Critical Depth = 18.91(In.)
Pipe flow velocity = 5.68(Ft/s)
Travel time through pipe = 0.16 min.
Time of concentration (TC) = 18.72 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 111.000 to Point/Station 112.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 13.413(Ac.)
Runoff from this stream = 21.524(CFS)
Time of concentration = 18.72 min.
Rainfall intensity = 1.873(In/Hr)
Area averaged loss rate (Fm) = 0.3269(In/Hr)
Area averaged Pervious ratio (Ap) = 0.3897
7
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 201.000 to Point/Station 202.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 565.000(Ft.)
Top (of initial area) elevation = 1287.000(Ft.)
Bottom (of initial area) elevation = 1275.000(Ft.)
Difference in elevation = 12.000(Ft.)
Slope = 0.02124 s(%)= 2.12
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.240 min.
Rainfall intensity = 1.842(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.504
Subarea runoff = 2.946(CFS)
Total initial stream area = 3.170(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 202.000 to Point/Station 203.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1275.000(Ft.)
End of street segment elevation = 1270.000(Ft.)
Length of street segment = 535.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 4.562(CFS)
Depth of flow = 0.386(Ft.), Average velocity = 2.524(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 12.964(Ft.)
Flow velocity = 2.52(Ft/s)
Travel time = 3.53 min. TC = 22.77 min.
Adding area flow to street
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.813(In/Hr)
Rainfall intensity = 1.665(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.461
Subarea runoff = 3.145(CFS) for 4.760(Ac.)
Total runoff = 6.091(CFS)
Effective area this stream = 7.93(Ac.)
Total Study Area (Main Stream No. 2) = 22.53(Ac.)
Area averaged Fm value = 0.811(In/Hr)
Street flow at end of street = 6.091(CFS)
Half street flow at end of street = 6.091(CFS)
8
Depth of flow = 0.418(Ft.), Average velocity = 2.705(Ft/s)
Flow width (from curb towards crown)= 14.579(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 203.000 to Point/Station 204.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1267.000(Ft.)
Downstream point/station elevation = 1266.700(Ft.)
Pipe length = 38.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 6.091(CFS)
Nearest computed pipe diameter = 18.00(In.)
Calculated individual pipe flow = 6.091(CFS)
Normal flow depth in pipe = 10.59(In.)
Flow top width inside pipe = 17.72(In.)
Critical Depth = 11.43(In.)
Pipe flow velocity = 5.63(Ft/s)
Travel time through pipe = 0.11 min.
Time of concentration (TC) = 22.89 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 204.000 to Point/Station 112.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1266.700(Ft.)
Downstream point/station elevation = 1266.500(Ft.)
Pipe length = 103.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 6.091(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 6.091(CFS)
Normal flow depth in pipe = 15.19(In.)
Flow top width inside pipe = 18.79(In.)
Critical Depth = 10.91(In.)
Pipe flow velocity = 3.27(Ft/s)
Travel time through pipe = 0.52 min.
Time of concentration (TC) = 23.41 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 204.000 to Point/Station 112.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 7.930(Ac.)
Runoff from this stream = 6.091(CFS)
Time of concentration = 23.41 min.
Rainfall intensity = 1.638(In/Hr)
Area averaged loss rate (Fm) = 0.8115(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9700
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 21.52 13.413 18.72 0.327 1.873
2 6.09 7.930 23.41 0.811 1.638
Qmax(1) =
1.000 * 1.000 * 21.524) +
1.285 * 0.800 * 6.091) + = 27.781
Qmax(2) =
0.848 * 1.000 * 21.524) +
1.000 * 1.000 * 6.091) + = 24.340
Total of 2 main streams to confluence:
Flow rates before confluence point:
22.524 7.091
Maximum flow rates at confluence using above data:
9
27.781 24.340
Area of streams before confluence:
13.413 7.930
Effective area values after confluence:
19.754 21.343
Results of confluence:
Total flow rate = 27.781(CFS)
Time of concentration = 18.718 min.
Effective stream area after confluence = 19.754(Ac.)
Study area average Pervious fraction(Ap) = 0.605
Study area average soil loss rate(Fm) = 0.507(In/Hr)
Study area total = 21.34(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 112.000 to Point/Station 118.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1266.500(Ft.)
Downstream point/station elevation = 1257.000(Ft.)
Pipe length = 1261.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 27.781(CFS)
Nearest computed pipe diameter = 30.00(In.)
Calculated individual pipe flow = 27.781(CFS)
Normal flow depth in pipe = 19.92(In.)
Flow top width inside pipe = 28.34(In.)
Critical Depth = 21.56(In.)
Pipe flow velocity = 8.02(Ft/s)
Travel time through pipe = 2.62 min.
Time of concentration (TC) = 21.34 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 112.000 to Point/Station 118.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 19.754(Ac.)
Runoff from this stream = 27.781(CFS)
Time of concentration = 21.34 min.
Rainfall intensity = 1.731(In/Hr)
Area averaged loss rate (Fm) = 0.5069(In/Hr)
Area averaged Pervious ratio (Ap) = 0.6053
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 113.000 to Point/Station 114.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 406.000(Ft.)
Top (of initial area) elevation = 1279.000(Ft.)
Bottom (of initial area) elevation = 1271.800(Ft.)
Difference in elevation = 7.200(Ft.)
Slope = 0.01773 s(%)= 1.77
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 17.476 min.
Rainfall intensity = 1.951(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.527
Subarea runoff = 2.652(CFS)
10
Total initial stream area = 2.580(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 114.000 to Point/Station 116.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1271.800(Ft.)
End of street segment elevation = 1262.700(Ft.)
Length of street segment = 686.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 4.295(CFS)
Depth of flow = 0.362(Ft.), Average velocity = 2.844(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 11.761(Ft.)
Flow velocity = 2.84(Ft/s)
Travel time = 4.02 min. TC = 21.50 min.
Adding area flow to street
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9500 Max loss rate(Fm)= 0.813(In/Hr)
Rainfall intensity = 1.724(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.476
Subarea runoff = 3.233(CFS) for 4.590(Ac.)
Total runoff = 5.885(CFS)
Effective area this stream = 7.17(Ac.)
Total Study Area (Main Stream No. 2) = 29.70(Ac.)
Area averaged Fm value = 0.812(In/Hr)
Street flow at end of street = 5.885(CFS)
Half street flow at end of street = 5.885(CFS)
Depth of flow = 0.395(Ft.), Average velocity = 3.064(Ft/s)
Flow width (from curb towards crown)= 13.393(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 114.000 to Point/Station 116.000
**** CONFLUENCE OF MINOR STREAMS ****
______________________________________________________________________
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 7.170(Ac.)
Runoff from this stream = 5.885(CFS)
Time of concentration = 21.50 min.
Rainfall intensity = 1.724(In/Hr)
Area averaged loss rate (Fm) = 0.8116(In/Hr)
Area averaged Pervious ratio (Ap) = 0.9680
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 115.000 to Point/Station 116.000
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
UNDEVELOPED (average cover) subarea
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
11
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 50.00
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.810(In/Hr)
Initial subarea data:
Initial area flow distance = 796.000(Ft.)
Top (of initial area) elevation = 1276.000(Ft.)
Bottom (of initial area) elevation = 1262.700(Ft.)
Difference in elevation = 13.300(Ft.)
Slope = 0.01671 s(%)= 1.67
TC = k(0.706)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 23.152 min.
Rainfall intensity = 1.649(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.458
Subarea runoff = 3.028(CFS)
Total initial stream area = 4.010(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.810(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 115.000 to Point/Station 116.000
**** CONFLUENCE OF MINOR STREAMS ****
______________________________________________________________________
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 4.010(Ac.)
Runoff from this stream = 3.028(CFS)
Time of concentration = 23.15 min.
Rainfall intensity = 1.649(In/Hr)
Area averaged loss rate (Fm) = 0.8095(In/Hr)
Area averaged Pervious ratio (Ap) = 1.0000
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 5.88 7.170 21.50 0.812 1.724
2 3.03 4.010 23.15 0.810 1.649
Qmax(1) =
1.000 * 1.000 * 5.885) +
1.089 * 0.928 * 3.028) + = 8.948
Qmax(2) =
0.918 * 1.000 * 5.885) +
1.000 * 1.000 * 3.028) + = 8.428
Total of 2 streams to confluence:
Flow rates before confluence point:
5.885 3.028
Maximum flow rates at confluence using above data:
8.948 8.428
Area of streams before confluence:
7.170 4.010
Effective area values after confluence:
10.893 11.180
Results of confluence:
Total flow rate = 8.948(CFS)
Time of concentration = 21.496 min.
Effective stream area after confluence = 10.893(Ac.)
Study area average Pervious fraction(Ap) = 0.979
Study area average soil loss rate(Fm) = 0.811(In/Hr)
Study area total (this main stream) = 11.18(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 116.000 to Point/Station 117.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
______________________________________________________________________
Top of street segment elevation = 1262.700(Ft.)
End of street segment elevation = 1260.300(Ft.)
Length of street segment = 479.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
12
Width of half street (curb to crown) = 22.000(Ft.)
Distance from crown to crossfall grade break = 18.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 10.745(CFS)
Depth of flow = 0.545(Ft.), Average velocity = 2.363(Ft/s)
Warning: depth of flow exceeds top of curb
Distance that curb overflow reaches into property = 1.81(Ft.)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 20.928(Ft.)
Flow velocity = 2.36(Ft/s)
Travel time = 3.38 min. TC = 24.87 min.
Adding area flow to street
Soil classification AP and SCS values input by user
USER INPUT of soil data for subarea
SCS curve number for soil(AMC 2) = 46.00
Pervious ratio(Ap) = 0.9000 Max loss rate(Fm)= 0.770(In/Hr)
Rainfall intensity = 1.579(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area,(total area with modified
rational method)(Q=KCIA) is C = 0.447
Subarea runoff = 3.527(CFS) for 6.790(Ac.)
Total runoff = 12.475(CFS)
Effective area this stream = 17.68(Ac.)
Total Study Area (Main Stream No. 2) = 40.50(Ac.)
Area averaged Fm value = 0.795(In/Hr)
Street flow at end of street = 12.475(CFS)
Half street flow at end of street = 12.475(CFS)
Depth of flow = 0.570(Ft.), Average velocity = 2.424(Ft/s)
Warning: depth of flow exceeds top of curb
Note: depth of flow exceeds top of street crown.
Distance that curb overflow reaches into property = 2.81(Ft.)
Flow width (from curb towards crown)= 22.000(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 117.000 to Point/Station 118.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
______________________________________________________________________
Upstream point/station elevation = 1257.300(Ft.)
Downstream point/station elevation = 1257.000(Ft.)
Pipe length = 18.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 12.475(CFS)
Nearest computed pipe diameter = 18.00(In.)
Calculated individual pipe flow = 12.475(CFS)
Normal flow depth in pipe = 13.59(In.)
Flow top width inside pipe = 15.48(In.)
Critical Depth = 15.99(In.)
Pipe flow velocity = 8.71(Ft/s)
Travel time through pipe = 0.03 min.
Time of concentration (TC) = 24.91 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 117.000 to Point/Station 118.000
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 17.683(Ac.)
Runoff from this stream = 12.475(CFS)
Time of concentration = 24.91 min.
Rainfall intensity = 1.578(In/Hr)
Area averaged loss rate (Fm) = 0.7952(In/Hr)
13
Area averaged Pervious ratio (Ap) = 0.9490
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 27.78 19.754 21.34 0.507 1.731
2 12.47 17.683 24.91 0.795 1.578
Qmax(1) =
1.000 * 1.000 * 27.781) +
1.196 * 0.857 * 12.475) + = 40.564
Qmax(2) =
0.875 * 1.000 * 27.781) +
1.000 * 1.000 * 12.475) + = 36.773
Total of 2 main streams to confluence:
Flow rates before confluence point:
28.781 13.475
Maximum flow rates at confluence using above data:
40.564 36.773
Area of streams before confluence:
19.754 17.683
Effective area values after confluence:
34.902 37.437
Results of confluence:
Total flow rate = 40.564(CFS)
Time of concentration = 21.339 min.
Effective stream area after confluence = 34.902(Ac.)
Study area average Pervious fraction(Ap) = 0.768
Study area average soil loss rate(Fm) = 0.643(In/Hr)
Study area total = 37.44(Ac.)
End of computations, Total Study Area = 40.50 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area
effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 0.752
Area averaged SCS curve number = 44.0
APPENDIX C: POST-PROJECT UNIT HYDROGRAPH ANALYSES
APPENDIX C.1: 100-YEAR STORM EVENT
1
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0
Study date 04/11/22
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
------------------------------------------------------------------------
San Bernardino County Synthetic Unit Hydrology Method
Manual date - August 1986
Program License Serial Number 6279
---------------------------------------------------------------------
265.22.22
UNIT HYDROGRAPH FOR ONSITE AREA
POST-PROJECT CONDITION
FN: ARAPOST100
--------------------------------------------------------------------
Storm Event Year = 100
Antecedent Moisture Condition = 2
English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
Area averaged rainfall intensity isohyetal data:
Sub-Area Duration Isohyetal
(Ac.) (hours) (In)
Rainfall data for year 10
8.81 1 0.93
--------------------------------------------------------------------
Rainfall data for year 2
8.81 6 1.64
--------------------------------------------------------------------
Rainfall data for year 2
8.81 24 3.07
--------------------------------------------------------------------
Rainfall data for year 100
8.81 1 1.51
--------------------------------------------------------------------
Rainfall data for year 100
8.81 6 3.78
--------------------------------------------------------------------
Rainfall data for year 100
8.81 24 7.02
--------------------------------------------------------------------
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
******** Area-averaged max loss rate, Fm ********
SCS curve SCS curve Area Area Fp(Fig C6) Ap Fm
No.(AMCII) NO.(AMC 2) (Ac.) Fraction (In/Hr) (dec.) (In/Hr)
46.0 46.0 8.81 1.000 0.856 0.100 0.086
Area-averaged adjusted loss rate Fm (In/Hr) = 0.086
********* Area-Averaged low loss rate fraction, Yb **********
2
Area Area SCS CN SCS CN S Pervious
(Ac.) Fract (AMC2) (AMC2) Yield Fr
0.88 0.100 46.0 46.0 11.74 0.189
7.93 0.900 98.0 98.0 0.20 0.966
Area-averaged catchment yield fraction, Y = 0.888
Area-averaged low loss fraction, Yb = 0.112
User entry of time of concentration = 0.173 (hours)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Watershed area = 8.81(Ac.)
Catchment Lag time = 0.138 hours
Unit interval = 5.000 minutes
Unit interval percentage of lag time = 60.3340
Hydrograph baseflow = 0.00(CFS)
Average maximum watershed loss rate(Fm) = 0.086(In/Hr)
Average low loss rate fraction (Yb) = 0.112 (decimal)
VALLEY DEVELOPED S-Graph Selected
Computed peak 5-minute rainfall = 0.559(In)
Computed peak 30-minute rainfall = 1.144(In)
Specified peak 1-hour rainfall = 1.510(In)
Computed peak 3-hour rainfall = 2.650(In)
Specified peak 6-hour rainfall = 3.780(In)
Specified peak 24-hour rainfall = 7.020(In)
Rainfall depth area reduction factors:
Using a total area of 8.81(Ac.) (Ref: fig. E-4)
5-minute factor = 1.000 Adjusted rainfall = 0.559(In)
30-minute factor = 1.000 Adjusted rainfall = 1.144(In)
1-hour factor = 1.000 Adjusted rainfall = 1.509(In)
3-hour factor = 1.000 Adjusted rainfall = 2.650(In)
6-hour factor = 1.000 Adjusted rainfall = 3.780(In)
24-hour factor = 1.000 Adjusted rainfall = 7.020(In)
---------------------------------------------------------------------
U n i t H y d r o g r a p h
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Interval 'S' Graph Unit Hydrograph
Number Mean values ((CFS))
---------------------------------------------------------------------
(K = 106.55 (CFS))
1 6.589 7.020
2 42.052 37.785
3 82.029 42.593
4 95.655 14.518
5 98.687 3.231
6 100.000 1.399
---------------------------------------------------------------------
Peak Unit Adjusted mass rainfall Unit rainfall
Number (In) (In)
1 0.5586 0.5586
2 0.7371 0.1785
3 0.8669 0.1298
4 0.9726 0.1057
5 1.0634 0.0908
6 1.1439 0.0805
7 1.2166 0.0728
8 1.2834 0.0668
9 1.3453 0.0619
10 1.4032 0.0579
11 1.4577 0.0545
12 1.5094 0.0516
13 1.5726 0.0632
14 1.6334 0.0609
15 1.6922 0.0588
16 1.7491 0.0569
17 1.8043 0.0552
18 1.8580 0.0536
19 1.9102 0.0522
3
20 1.9610 0.0509
21 2.0107 0.0496
22 2.0592 0.0485
23 2.1066 0.0474
24 2.1531 0.0465
25 2.1986 0.0455
26 2.2432 0.0446
27 2.2871 0.0438
28 2.3301 0.0430
29 2.3724 0.0423
30 2.4139 0.0416
31 2.4548 0.0409
32 2.4951 0.0403
33 2.5348 0.0397
34 2.5738 0.0391
35 2.6124 0.0385
36 2.6503 0.0380
37 2.6878 0.0375
38 2.7248 0.0370
39 2.7613 0.0365
40 2.7973 0.0360
41 2.8329 0.0356
42 2.8681 0.0352
43 2.9028 0.0348
44 2.9372 0.0344
45 2.9712 0.0340
46 3.0049 0.0336
47 3.0381 0.0333
48 3.0711 0.0329
49 3.1037 0.0326
50 3.1360 0.0323
51 3.1679 0.0320
52 3.1996 0.0317
53 3.2310 0.0314
54 3.2620 0.0311
55 3.2928 0.0308
56 3.3234 0.0305
57 3.3536 0.0303
58 3.3836 0.0300
59 3.4134 0.0298
60 3.4429 0.0295
61 3.4722 0.0293
62 3.5012 0.0290
63 3.5300 0.0288
64 3.5586 0.0286
65 3.5870 0.0284
66 3.6151 0.0282
67 3.6431 0.0280
68 3.6708 0.0277
69 3.6984 0.0275
70 3.7258 0.0274
71 3.7529 0.0272
72 3.7799 0.0270
73 3.8032 0.0234
74 3.8264 0.0232
75 3.8494 0.0230
76 3.8723 0.0228
77 3.8949 0.0227
78 3.9174 0.0225
79 3.9398 0.0223
80 3.9620 0.0222
81 3.9840 0.0220
82 4.0059 0.0219
83 4.0277 0.0217
84 4.0493 0.0216
85 4.0707 0.0215
86 4.0920 0.0213
87 4.1132 0.0212
88 4.1343 0.0210
89 4.1552 0.0209
90 4.1760 0.0208
4
91 4.1966 0.0207
92 4.2171 0.0205
93 4.2375 0.0204
94 4.2578 0.0203
95 4.2780 0.0202
96 4.2981 0.0201
97 4.3180 0.0199
98 4.3378 0.0198
99 4.3575 0.0197
100 4.3771 0.0196
101 4.3966 0.0195
102 4.4160 0.0194
103 4.4353 0.0193
104 4.4545 0.0192
105 4.4735 0.0191
106 4.4925 0.0190
107 4.5114 0.0189
108 4.5302 0.0188
109 4.5488 0.0187
110 4.5674 0.0186
111 4.5859 0.0185
112 4.6043 0.0184
113 4.6227 0.0183
114 4.6409 0.0182
115 4.6590 0.0181
116 4.6771 0.0180
117 4.6950 0.0180
118 4.7129 0.0179
119 4.7307 0.0178
120 4.7484 0.0177
121 4.7660 0.0176
122 4.7836 0.0175
123 4.8010 0.0175
124 4.8184 0.0174
125 4.8358 0.0173
126 4.8530 0.0172
127 4.8702 0.0172
128 4.8872 0.0171
129 4.9043 0.0170
130 4.9212 0.0169
131 4.9381 0.0169
132 4.9549 0.0168
133 4.9716 0.0167
134 4.9882 0.0167
135 5.0048 0.0166
136 5.0214 0.0165
137 5.0378 0.0165
138 5.0542 0.0164
139 5.0705 0.0163
140 5.0868 0.0163
141 5.1030 0.0162
142 5.1191 0.0161
143 5.1352 0.0161
144 5.1512 0.0160
145 5.1671 0.0159
146 5.1830 0.0159
147 5.1988 0.0158
148 5.2146 0.0158
149 5.2303 0.0157
150 5.2459 0.0156
151 5.2615 0.0156
152 5.2771 0.0155
153 5.2925 0.0155
154 5.3079 0.0154
155 5.3233 0.0154
156 5.3386 0.0153
157 5.3539 0.0153
158 5.3691 0.0152
159 5.3842 0.0151
160 5.3993 0.0151
161 5.4144 0.0150
5
162 5.4294 0.0150
163 5.4443 0.0149
164 5.4592 0.0149
165 5.4740 0.0148
166 5.4888 0.0148
167 5.5036 0.0147
168 5.5183 0.0147
169 5.5329 0.0146
170 5.5475 0.0146
171 5.5620 0.0145
172 5.5765 0.0145
173 5.5910 0.0145
174 5.6054 0.0144
175 5.6198 0.0144
176 5.6341 0.0143
177 5.6484 0.0143
178 5.6626 0.0142
179 5.6768 0.0142
180 5.6909 0.0141
181 5.7050 0.0141
182 5.7191 0.0141
183 5.7331 0.0140
184 5.7470 0.0140
185 5.7610 0.0139
186 5.7749 0.0139
187 5.7887 0.0138
188 5.8025 0.0138
189 5.8163 0.0138
190 5.8300 0.0137
191 5.8437 0.0137
192 5.8573 0.0136
193 5.8709 0.0136
194 5.8845 0.0136
195 5.8980 0.0135
196 5.9115 0.0135
197 5.9249 0.0134
198 5.9383 0.0134
199 5.9517 0.0134
200 5.9651 0.0133
201 5.9784 0.0133
202 5.9916 0.0133
203 6.0049 0.0132
204 6.0180 0.0132
205 6.0312 0.0132
206 6.0443 0.0131
207 6.0574 0.0131
208 6.0705 0.0131
209 6.0835 0.0130
210 6.0965 0.0130
211 6.1094 0.0129
212 6.1223 0.0129
213 6.1352 0.0129
214 6.1480 0.0128
215 6.1608 0.0128
216 6.1736 0.0128
217 6.1864 0.0127
218 6.1991 0.0127
219 6.2118 0.0127
220 6.2244 0.0127
221 6.2370 0.0126
222 6.2496 0.0126
223 6.2622 0.0126
224 6.2747 0.0125
225 6.2872 0.0125
226 6.2997 0.0125
227 6.3121 0.0124
228 6.3245 0.0124
229 6.3369 0.0124
230 6.3492 0.0123
231 6.3615 0.0123
232 6.3738 0.0123
6
233 6.3861 0.0123
234 6.3983 0.0122
235 6.4105 0.0122
236 6.4226 0.0122
237 6.4348 0.0121
238 6.4469 0.0121
239 6.4590 0.0121
240 6.4710 0.0121
241 6.4831 0.0120
242 6.4951 0.0120
243 6.5070 0.0120
244 6.5190 0.0119
245 6.5309 0.0119
246 6.5428 0.0119
247 6.5546 0.0119
248 6.5665 0.0118
249 6.5783 0.0118
250 6.5901 0.0118
251 6.6018 0.0118
252 6.6136 0.0117
253 6.6253 0.0117
254 6.6370 0.0117
255 6.6486 0.0117
256 6.6602 0.0116
257 6.6718 0.0116
258 6.6834 0.0116
259 6.6950 0.0116
260 6.7065 0.0115
261 6.7180 0.0115
262 6.7295 0.0115
263 6.7410 0.0115
264 6.7524 0.0114
265 6.7638 0.0114
266 6.7752 0.0114
267 6.7866 0.0114
268 6.7979 0.0113
269 6.8092 0.0113
270 6.8205 0.0113
271 6.8318 0.0113
272 6.8430 0.0112
273 6.8542 0.0112
274 6.8654 0.0112
275 6.8766 0.0112
276 6.8878 0.0112
277 6.8989 0.0111
278 6.9100 0.0111
279 6.9211 0.0111
280 6.9322 0.0111
281 6.9432 0.0110
282 6.9542 0.0110
283 6.9652 0.0110
284 6.9762 0.0110
285 6.9872 0.0110
286 6.9981 0.0109
287 7.0090 0.0109
288 7.0199 0.0109
---------------------------------------------------------------------
Unit Unit Unit Effective
Period Rainfall Soil-Loss Rainfall
(number) (In) (In) (In)
---------------------------------------------------------------------
1 0.0109 0.0012 0.0097
2 0.0109 0.0012 0.0097
3 0.0110 0.0012 0.0097
4 0.0110 0.0012 0.0098
5 0.0110 0.0012 0.0098
6 0.0110 0.0012 0.0098
7 0.0111 0.0012 0.0098
8 0.0111 0.0012 0.0099
9 0.0112 0.0012 0.0099
10 0.0112 0.0012 0.0099
7
11 0.0112 0.0013 0.0100
12 0.0112 0.0013 0.0100
13 0.0113 0.0013 0.0100
14 0.0113 0.0013 0.0101
15 0.0114 0.0013 0.0101
16 0.0114 0.0013 0.0101
17 0.0114 0.0013 0.0102
18 0.0115 0.0013 0.0102
19 0.0115 0.0013 0.0102
20 0.0115 0.0013 0.0102
21 0.0116 0.0013 0.0103
22 0.0116 0.0013 0.0103
23 0.0117 0.0013 0.0104
24 0.0117 0.0013 0.0104
25 0.0117 0.0013 0.0104
26 0.0118 0.0013 0.0104
27 0.0118 0.0013 0.0105
28 0.0118 0.0013 0.0105
29 0.0119 0.0013 0.0106
30 0.0119 0.0013 0.0106
31 0.0120 0.0013 0.0106
32 0.0120 0.0013 0.0107
33 0.0121 0.0013 0.0107
34 0.0121 0.0013 0.0107
35 0.0121 0.0014 0.0108
36 0.0122 0.0014 0.0108
37 0.0122 0.0014 0.0109
38 0.0123 0.0014 0.0109
39 0.0123 0.0014 0.0109
40 0.0123 0.0014 0.0110
41 0.0124 0.0014 0.0110
42 0.0124 0.0014 0.0110
43 0.0125 0.0014 0.0111
44 0.0125 0.0014 0.0111
45 0.0126 0.0014 0.0112
46 0.0126 0.0014 0.0112
47 0.0127 0.0014 0.0113
48 0.0127 0.0014 0.0113
49 0.0128 0.0014 0.0114
50 0.0128 0.0014 0.0114
51 0.0129 0.0014 0.0114
52 0.0129 0.0014 0.0115
53 0.0130 0.0015 0.0115
54 0.0130 0.0015 0.0116
55 0.0131 0.0015 0.0116
56 0.0131 0.0015 0.0117
57 0.0132 0.0015 0.0117
58 0.0132 0.0015 0.0117
59 0.0133 0.0015 0.0118
60 0.0133 0.0015 0.0118
61 0.0134 0.0015 0.0119
62 0.0134 0.0015 0.0119
63 0.0135 0.0015 0.0120
64 0.0136 0.0015 0.0120
65 0.0136 0.0015 0.0121
66 0.0137 0.0015 0.0122
67 0.0138 0.0015 0.0122
68 0.0138 0.0015 0.0123
69 0.0139 0.0016 0.0123
70 0.0139 0.0016 0.0124
71 0.0140 0.0016 0.0124
72 0.0141 0.0016 0.0125
73 0.0141 0.0016 0.0126
74 0.0142 0.0016 0.0126
75 0.0143 0.0016 0.0127
76 0.0143 0.0016 0.0127
77 0.0144 0.0016 0.0128
78 0.0145 0.0016 0.0128
79 0.0145 0.0016 0.0129
80 0.0146 0.0016 0.0130
81 0.0147 0.0016 0.0131
8
82 0.0147 0.0016 0.0131
83 0.0148 0.0017 0.0132
84 0.0149 0.0017 0.0132
85 0.0150 0.0017 0.0133
86 0.0150 0.0017 0.0134
87 0.0151 0.0017 0.0135
88 0.0152 0.0017 0.0135
89 0.0153 0.0017 0.0136
90 0.0154 0.0017 0.0136
91 0.0155 0.0017 0.0137
92 0.0155 0.0017 0.0138
93 0.0156 0.0017 0.0139
94 0.0157 0.0018 0.0140
95 0.0158 0.0018 0.0141
96 0.0159 0.0018 0.0141
97 0.0160 0.0018 0.0142
98 0.0161 0.0018 0.0143
99 0.0162 0.0018 0.0144
100 0.0163 0.0018 0.0144
101 0.0164 0.0018 0.0146
102 0.0165 0.0018 0.0146
103 0.0166 0.0019 0.0147
104 0.0167 0.0019 0.0148
105 0.0168 0.0019 0.0149
106 0.0169 0.0019 0.0150
107 0.0170 0.0019 0.0151
108 0.0171 0.0019 0.0152
109 0.0172 0.0019 0.0153
110 0.0173 0.0019 0.0154
111 0.0175 0.0020 0.0155
112 0.0175 0.0020 0.0156
113 0.0177 0.0020 0.0157
114 0.0178 0.0020 0.0158
115 0.0180 0.0020 0.0160
116 0.0180 0.0020 0.0160
117 0.0182 0.0020 0.0162
118 0.0183 0.0020 0.0163
119 0.0185 0.0021 0.0164
120 0.0186 0.0021 0.0165
121 0.0188 0.0021 0.0167
122 0.0189 0.0021 0.0168
123 0.0191 0.0021 0.0169
124 0.0192 0.0021 0.0170
125 0.0194 0.0022 0.0172
126 0.0195 0.0022 0.0173
127 0.0197 0.0022 0.0175
128 0.0198 0.0022 0.0176
129 0.0201 0.0022 0.0178
130 0.0202 0.0023 0.0179
131 0.0204 0.0023 0.0181
132 0.0205 0.0023 0.0182
133 0.0208 0.0023 0.0185
134 0.0209 0.0023 0.0186
135 0.0212 0.0024 0.0188
136 0.0213 0.0024 0.0189
137 0.0216 0.0024 0.0192
138 0.0217 0.0024 0.0193
139 0.0220 0.0025 0.0196
140 0.0222 0.0025 0.0197
141 0.0225 0.0025 0.0200
142 0.0227 0.0025 0.0201
143 0.0230 0.0026 0.0204
144 0.0232 0.0026 0.0206
145 0.0270 0.0030 0.0240
146 0.0272 0.0030 0.0241
147 0.0275 0.0031 0.0245
148 0.0277 0.0031 0.0246
149 0.0282 0.0031 0.0250
150 0.0284 0.0032 0.0252
151 0.0288 0.0032 0.0256
152 0.0290 0.0032 0.0258
9
153 0.0295 0.0033 0.0262
154 0.0298 0.0033 0.0264
155 0.0303 0.0034 0.0269
156 0.0305 0.0034 0.0271
157 0.0311 0.0035 0.0276
158 0.0314 0.0035 0.0279
159 0.0320 0.0036 0.0284
160 0.0323 0.0036 0.0287
161 0.0329 0.0037 0.0293
162 0.0333 0.0037 0.0296
163 0.0340 0.0038 0.0302
164 0.0344 0.0038 0.0305
165 0.0352 0.0039 0.0313
166 0.0356 0.0040 0.0316
167 0.0365 0.0041 0.0324
168 0.0370 0.0041 0.0328
169 0.0380 0.0042 0.0337
170 0.0385 0.0043 0.0342
171 0.0397 0.0044 0.0352
172 0.0403 0.0045 0.0358
173 0.0416 0.0046 0.0369
174 0.0423 0.0047 0.0376
175 0.0438 0.0049 0.0389
176 0.0446 0.0050 0.0397
177 0.0465 0.0052 0.0413
178 0.0474 0.0053 0.0421
179 0.0496 0.0055 0.0441
180 0.0509 0.0057 0.0452
181 0.0536 0.0060 0.0476
182 0.0552 0.0062 0.0490
183 0.0588 0.0066 0.0522
184 0.0609 0.0068 0.0541
185 0.0516 0.0058 0.0459
186 0.0545 0.0061 0.0484
187 0.0619 0.0069 0.0550
188 0.0668 0.0071 0.0596
189 0.0805 0.0071 0.0733
190 0.0908 0.0071 0.0837
191 0.1298 0.0071 0.1227
192 0.1785 0.0071 0.1714
193 0.5586 0.0071 0.5515
194 0.1057 0.0071 0.0986
195 0.0728 0.0071 0.0656
196 0.0579 0.0065 0.0514
197 0.0632 0.0071 0.0561
198 0.0569 0.0064 0.0505
199 0.0522 0.0058 0.0464
200 0.0485 0.0054 0.0431
201 0.0455 0.0051 0.0404
202 0.0430 0.0048 0.0382
203 0.0409 0.0046 0.0363
204 0.0391 0.0044 0.0347
205 0.0375 0.0042 0.0333
206 0.0360 0.0040 0.0320
207 0.0348 0.0039 0.0309
208 0.0336 0.0038 0.0299
209 0.0326 0.0036 0.0290
210 0.0317 0.0035 0.0281
211 0.0308 0.0034 0.0274
212 0.0300 0.0034 0.0267
213 0.0293 0.0033 0.0260
214 0.0286 0.0032 0.0254
215 0.0280 0.0031 0.0248
216 0.0274 0.0031 0.0243
217 0.0234 0.0026 0.0207
218 0.0228 0.0026 0.0203
219 0.0223 0.0025 0.0199
220 0.0219 0.0024 0.0194
221 0.0215 0.0024 0.0191
222 0.0210 0.0024 0.0187
223 0.0207 0.0023 0.0183
10
224 0.0203 0.0023 0.0180
225 0.0199 0.0022 0.0177
226 0.0196 0.0022 0.0174
227 0.0193 0.0022 0.0171
228 0.0190 0.0021 0.0169
229 0.0187 0.0021 0.0166
230 0.0184 0.0021 0.0163
231 0.0181 0.0020 0.0161
232 0.0179 0.0020 0.0159
233 0.0176 0.0020 0.0157
234 0.0174 0.0019 0.0154
235 0.0172 0.0019 0.0152
236 0.0169 0.0019 0.0150
237 0.0167 0.0019 0.0149
238 0.0165 0.0018 0.0147
239 0.0163 0.0018 0.0145
240 0.0161 0.0018 0.0143
241 0.0159 0.0018 0.0142
242 0.0158 0.0018 0.0140
243 0.0156 0.0017 0.0138
244 0.0154 0.0017 0.0137
245 0.0153 0.0017 0.0136
246 0.0151 0.0017 0.0134
247 0.0149 0.0017 0.0133
248 0.0148 0.0017 0.0131
249 0.0146 0.0016 0.0130
250 0.0145 0.0016 0.0129
251 0.0144 0.0016 0.0128
252 0.0142 0.0016 0.0126
253 0.0141 0.0016 0.0125
254 0.0140 0.0016 0.0124
255 0.0138 0.0015 0.0123
256 0.0137 0.0015 0.0122
257 0.0136 0.0015 0.0121
258 0.0135 0.0015 0.0120
259 0.0134 0.0015 0.0119
260 0.0133 0.0015 0.0118
261 0.0132 0.0015 0.0117
262 0.0131 0.0015 0.0116
263 0.0129 0.0014 0.0115
264 0.0128 0.0014 0.0114
265 0.0127 0.0014 0.0113
266 0.0127 0.0014 0.0112
267 0.0126 0.0014 0.0112
268 0.0125 0.0014 0.0111
269 0.0124 0.0014 0.0110
270 0.0123 0.0014 0.0109
271 0.0122 0.0014 0.0108
272 0.0121 0.0014 0.0108
273 0.0120 0.0013 0.0107
274 0.0119 0.0013 0.0106
275 0.0119 0.0013 0.0105
276 0.0118 0.0013 0.0105
277 0.0117 0.0013 0.0104
278 0.0116 0.0013 0.0103
279 0.0116 0.0013 0.0103
280 0.0115 0.0013 0.0102
281 0.0114 0.0013 0.0101
282 0.0113 0.0013 0.0101
283 0.0113 0.0013 0.0100
284 0.0112 0.0013 0.0099
285 0.0111 0.0012 0.0099
286 0.0111 0.0012 0.0098
287 0.0110 0.0012 0.0098
288 0.0109 0.0012 0.0097
--------------------------------------------------------------------
--------------------------------------------------------------------
Total soil rain loss = 0.70(In)
Total effective rainfall = 6.32(In)
Peak flow rate in flood hydrograph = 30.98(CFS)
---------------------------------------------------------------------
11
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
24 - H O U R S T O R M
R u n o f f H y d r o g r a p h
--------------------------------------------------------------------
Hydrograph in 5 Minute intervals ((CFS))
--------------------------------------------------------------------
Time(h+m) Volume Ac.Ft Q(CFS) 0 10.0 20.0 30.0 40.0
-----------------------------------------------------------------------
0+ 5 0.0005 0.07 Q | | | |
0+10 0.0035 0.43 Q | | | |
0+15 0.0093 0.85 Q | | | |
0+20 0.0161 0.99 Q | | | |
0+25 0.0232 1.02 VQ | | | |
0+30 0.0303 1.04 VQ | | | |
0+35 0.0375 1.04 VQ | | | |
0+40 0.0447 1.05 VQ | | | |
0+45 0.0519 1.05 VQ | | | |
0+50 0.0592 1.05 VQ | | | |
0+55 0.0665 1.06 VQ | | | |
1+ 0 0.0738 1.06 VQ | | | |
1+ 5 0.0811 1.06 VQ | | | |
1+10 0.0884 1.07 VQ | | | |
1+15 0.0958 1.07 VQ | | | |
1+20 0.1032 1.07 VQ | | | |
1+25 0.1106 1.08 VQ | | | |
1+30 0.1180 1.08 |Q | | | |
1+35 0.1255 1.08 |Q | | | |
1+40 0.1329 1.09 |Q | | | |
1+45 0.1404 1.09 |Q | | | |
1+50 0.1480 1.09 |Q | | | |
1+55 0.1555 1.10 |Q | | | |
2+ 0 0.1631 1.10 |Q | | | |
2+ 5 0.1707 1.10 |Q | | | |
2+10 0.1783 1.11 |Q | | | |
2+15 0.1860 1.11 |Q | | | |
2+20 0.1936 1.11 |Q | | | |
2+25 0.2013 1.12 |Q | | | |
2+30 0.2091 1.12 |Q | | | |
2+35 0.2168 1.13 |Q | | | |
2+40 0.2246 1.13 |Q | | | |
2+45 0.2324 1.13 |QV | | | |
2+50 0.2402 1.14 |QV | | | |
2+55 0.2481 1.14 |QV | | | |
3+ 0 0.2560 1.15 |QV | | | |
3+ 5 0.2639 1.15 |QV | | | |
3+10 0.2718 1.15 |QV | | | |
3+15 0.2798 1.16 |QV | | | |
3+20 0.2878 1.16 |QV | | | |
3+25 0.2958 1.17 |QV | | | |
3+30 0.3039 1.17 |QV | | | |
3+35 0.3120 1.17 |QV | | | |
3+40 0.3201 1.18 |QV | | | |
3+45 0.3283 1.18 |QV | | | |
3+50 0.3364 1.19 |QV | | | |
3+55 0.3446 1.19 |QV | | | |
4+ 0 0.3529 1.20 |Q V | | | |
4+ 5 0.3611 1.20 |Q V | | | |
4+10 0.3694 1.21 |Q V | | | |
4+15 0.3778 1.21 |Q V | | | |
4+20 0.3861 1.21 |Q V | | | |
4+25 0.3945 1.22 |Q V | | | |
4+30 0.4030 1.22 |Q V | | | |
4+35 0.4114 1.23 |Q V | | | |
4+40 0.4199 1.23 |Q V | | | |
4+45 0.4285 1.24 |Q V | | | |
4+50 0.4370 1.24 |Q V | | | |
4+55 0.4456 1.25 |Q V | | | |
5+ 0 0.4543 1.25 |Q V | | | |
5+ 5 0.4629 1.26 |Q V | | | |
5+10 0.4716 1.26 |Q V | | | |
12
5+15 0.4804 1.27 |Q V | | | |
5+20 0.4892 1.28 |Q V | | | |
5+25 0.4980 1.28 |Q V | | | |
5+30 0.5069 1.29 |Q V | | | |
5+35 0.5158 1.29 |Q V | | | |
5+40 0.5247 1.30 |Q V | | | |
5+45 0.5337 1.30 |Q V | | | |
5+50 0.5427 1.31 |Q V | | | |
5+55 0.5517 1.31 |Q V | | | |
6+ 0 0.5608 1.32 |Q V | | | |
6+ 5 0.5700 1.33 |Q V | | | |
6+10 0.5791 1.33 |Q V | | | |
6+15 0.5884 1.34 |Q V | | | |
6+20 0.5976 1.35 |Q V | | | |
6+25 0.6069 1.35 |Q V | | | |
6+30 0.6163 1.36 |Q V | | | |
6+35 0.6257 1.36 |Q V | | | |
6+40 0.6351 1.37 |Q V | | | |
6+45 0.6446 1.38 |Q V | | | |
6+50 0.6541 1.38 |Q V | | | |
6+55 0.6637 1.39 |Q V | | | |
7+ 0 0.6733 1.40 |Q V | | | |
7+ 5 0.6830 1.41 |Q V | | | |
7+10 0.6928 1.41 |Q V | | | |
7+15 0.7025 1.42 |Q V | | | |
7+20 0.7124 1.43 |Q V | | | |
7+25 0.7222 1.43 |Q V | | | |
7+30 0.7322 1.44 |Q V | | | |
7+35 0.7421 1.45 |Q V | | | |
7+40 0.7522 1.46 |Q V | | | |
7+45 0.7623 1.47 |Q V | | | |
7+50 0.7724 1.47 |Q V | | | |
7+55 0.7826 1.48 |Q V | | | |
8+ 0 0.7929 1.49 |Q V | | | |
8+ 5 0.8032 1.50 |Q V | | | |
8+10 0.8136 1.51 |Q V | | | |
8+15 0.8240 1.52 |Q V | | | |
8+20 0.8345 1.52 |Q V | | | |
8+25 0.8451 1.53 |Q V | | | |
8+30 0.8557 1.54 |Q V | | | |
8+35 0.8664 1.55 |Q V | | | |
8+40 0.8771 1.56 |Q V | | | |
8+45 0.8880 1.57 |Q V | | | |
8+50 0.8989 1.58 |Q V | | | |
8+55 0.9098 1.59 |Q V | | | |
9+ 0 0.9208 1.60 |Q V | | | |
9+ 5 0.9319 1.61 |Q V | | | |
9+10 0.9431 1.62 |Q V | | | |
9+15 0.9543 1.63 |Q V | | | |
9+20 0.9657 1.64 |Q V | | | |
9+25 0.9771 1.65 |Q V | | | |
9+30 0.9885 1.67 |Q V | | | |
9+35 1.0001 1.68 |Q V | | | |
9+40 1.0117 1.69 |Q V | | | |
9+45 1.0234 1.70 |Q V | | | |
9+50 1.0352 1.71 |Q V | | | |
9+55 1.0471 1.73 |Q V| | | |
10+ 0 1.0591 1.74 |Q V| | | |
10+ 5 1.0712 1.75 |Q V| | | |
10+10 1.0833 1.77 |Q V| | | |
10+15 1.0956 1.78 |Q V| | | |
10+20 1.1079 1.79 |Q V| | | |
10+25 1.1203 1.81 |Q V| | | |
10+30 1.1329 1.82 |Q V| | | |
10+35 1.1455 1.84 |Q V| | | |
10+40 1.1583 1.85 |Q V| | | |
10+45 1.1711 1.87 |Q V | | |
10+50 1.1841 1.88 |Q V | | |
10+55 1.1972 1.90 |Q V | | |
11+ 0 1.2104 1.92 |Q V | | |
11+ 5 1.2237 1.93 |Q V | | |
13
11+10 1.2371 1.95 |Q V | | |
11+15 1.2507 1.97 |Q V | | |
11+20 1.2644 1.99 |Q V | | |
11+25 1.2782 2.01 | Q |V | | |
11+30 1.2922 2.03 | Q |V | | |
11+35 1.3062 2.05 | Q |V | | |
11+40 1.3205 2.07 | Q |V | | |
11+45 1.3349 2.09 | Q |V | | |
11+50 1.3494 2.11 | Q |V | | |
11+55 1.3641 2.13 | Q |V | | |
12+ 0 1.3789 2.16 | Q |V | | |
12+ 5 1.3941 2.20 | Q | V | | |
12+10 1.4102 2.34 | Q | V | | |
12+15 1.4274 2.50 | Q | V | | |
12+20 1.4451 2.57 | Q | V | | |
12+25 1.4630 2.61 | Q | V | | |
12+30 1.4812 2.64 | Q | V | | |
12+35 1.4996 2.67 | Q | V | | |
12+40 1.5182 2.70 | Q | V | | |
12+45 1.5370 2.73 | Q | V | | |
12+50 1.5560 2.76 | Q | V | | |
12+55 1.5753 2.80 | Q | V | | |
13+ 0 1.5948 2.83 | Q | V | | |
13+ 5 1.6145 2.87 | Q | V | | |
13+10 1.6345 2.91 | Q | V | | |
13+15 1.6548 2.95 | Q | V | | |
13+20 1.6754 2.99 | Q | V | | |
13+25 1.6963 3.03 | Q | V | | |
13+30 1.7174 3.08 | Q | V | | |
13+35 1.7389 3.12 | Q | V | | |
13+40 1.7608 3.17 | Q | V | | |
13+45 1.7830 3.22 | Q | V | | |
13+50 1.8056 3.28 | Q | V | | |
13+55 1.8285 3.34 | Q | V | | |
14+ 0 1.8519 3.40 | Q | V | | |
14+ 5 1.8758 3.46 | Q | V | | |
14+10 1.9001 3.53 | Q | V | | |
14+15 1.9249 3.60 | Q | V | | |
14+20 1.9502 3.68 | Q | V | | |
14+25 1.9762 3.76 | Q | V | | |
14+30 2.0027 3.85 | Q | V | | |
14+35 2.0299 3.95 | Q | V | | |
14+40 2.0578 4.05 | Q | V | | |
14+45 2.0864 4.16 | Q | V | | |
14+50 2.1159 4.28 | Q | V | | |
14+55 2.1463 4.41 | Q | V | | |
15+ 0 2.1777 4.56 | Q | V | | |
15+ 5 2.2102 4.72 | Q | V| | |
15+10 2.2440 4.90 | Q | V| | |
15+15 2.2792 5.11 | Q | V| | |
15+20 2.3159 5.34 | Q | V| | |
15+25 2.3539 5.52 | Q | V | |
15+30 2.3908 5.36 | Q | V | |
15+35 2.4266 5.19 | Q | V | |
15+40 2.4643 5.47 | Q | |V | |
15+45 2.5059 6.04 | Q | |V | |
15+50 2.5535 6.92 | Q | | V | |
15+55 2.6104 8.26 | Q | | V | |
16+ 0 2.6843 10.74 | Q | V | |
16+ 5 2.8021 17.11 | | Q | V | |
16+10 3.0155 30.98 | | | V Q |
16+15 3.2268 30.68 | | | V Q |
16+20 3.3354 15.77 | | Q | V | |
16+25 3.3945 8.59 | Q | | V| |
16+30 3.4407 6.71 | Q | | V| |
16+35 3.4802 5.72 | Q | | V |
16+40 3.5165 5.28 | Q | | V |
16+45 3.5501 4.87 | Q | | V |
16+50 3.5814 4.55 | Q | | V |
16+55 3.6108 4.27 | Q | | |V |
17+ 0 3.6386 4.04 | Q | | |V |
14
17+ 5 3.6650 3.84 | Q | | |V |
17+10 3.6903 3.67 | Q | | |V |
17+15 3.7145 3.52 | Q | | | V |
17+20 3.7378 3.39 | Q | | | V |
17+25 3.7604 3.27 | Q | | | V |
17+30 3.7821 3.16 | Q | | | V |
17+35 3.8033 3.07 | Q | | | V |
17+40 3.8238 2.98 | Q | | | V |
17+45 3.8437 2.90 | Q | | | V |
17+50 3.8632 2.82 | Q | | | V |
17+55 3.8822 2.76 | Q | | | V |
18+ 0 3.9007 2.69 | Q | | | V |
18+ 5 3.9187 2.61 | Q | | | V |
18+10 3.9355 2.44 | Q | | | V |
18+15 3.9511 2.26 | Q | | | V |
18+20 3.9660 2.17 | Q | | | V |
18+25 3.9805 2.11 | Q | | | V |
18+30 3.9947 2.06 | Q | | | V |
18+35 4.0086 2.02 | Q | | | V |
18+40 4.0223 1.98 |Q | | | V |
18+45 4.0357 1.95 |Q | | | V |
18+50 4.0489 1.91 |Q | | | V |
18+55 4.0618 1.88 |Q | | | V |
19+ 0 4.0745 1.85 |Q | | | V |
19+ 5 4.0870 1.82 |Q | | | V |
19+10 4.0994 1.79 |Q | | | V |
19+15 4.1115 1.76 |Q | | | V |
19+20 4.1235 1.74 |Q | | | V |
19+25 4.1352 1.71 |Q | | | V |
19+30 4.1469 1.69 |Q | | | V |
19+35 4.1583 1.66 |Q | | | V |
19+40 4.1696 1.64 |Q | | | V |
19+45 4.1808 1.62 |Q | | | V |
19+50 4.1918 1.60 |Q | | | V |
19+55 4.2026 1.58 |Q | | | V |
20+ 0 4.2134 1.56 |Q | | | V |
20+ 5 4.2240 1.54 |Q | | | V |
20+10 4.2345 1.52 |Q | | | V |
20+15 4.2448 1.50 |Q | | | V |
20+20 4.2551 1.49 |Q | | | V |
20+25 4.2652 1.47 |Q | | | V |
20+30 4.2753 1.46 |Q | | | V |
20+35 4.2852 1.44 |Q | | | V |
20+40 4.2950 1.43 |Q | | | V |
20+45 4.3047 1.41 |Q | | | V |
20+50 4.3143 1.40 |Q | | | V |
20+55 4.3238 1.38 |Q | | | V |
21+ 0 4.3333 1.37 |Q | | | V |
21+ 5 4.3426 1.36 |Q | | | V |
21+10 4.3519 1.34 |Q | | | V |
21+15 4.3610 1.33 |Q | | | V |
21+20 4.3701 1.32 |Q | | | V |
21+25 4.3791 1.31 |Q | | | V |
21+30 4.3881 1.30 |Q | | | V |
21+35 4.3969 1.28 |Q | | | V |
21+40 4.4057 1.27 |Q | | | V |
21+45 4.4144 1.26 |Q | | | V |
21+50 4.4230 1.25 |Q | | | V |
21+55 4.4316 1.24 |Q | | | V |
22+ 0 4.4401 1.23 |Q | | | V |
22+ 5 4.4485 1.22 |Q | | | V |
22+10 4.4568 1.21 |Q | | | V |
22+15 4.4651 1.20 |Q | | | V |
22+20 4.4734 1.20 |Q | | | V |
22+25 4.4815 1.19 |Q | | | V |
22+30 4.4896 1.18 |Q | | | V |
22+35 4.4977 1.17 |Q | | | V |
22+40 4.5057 1.16 |Q | | | V |
22+45 4.5136 1.15 |Q | | | V |
22+50 4.5215 1.14 |Q | | | V |
22+55 4.5293 1.14 |Q | | | V|
15
23+ 0 4.5371 1.13 |Q | | | V|
23+ 5 4.5448 1.12 |Q | | | V|
23+10 4.5525 1.11 |Q | | | V|
23+15 4.5601 1.11 |Q | | | V|
23+20 4.5677 1.10 |Q | | | V|
23+25 4.5752 1.09 |Q | | | V|
23+30 4.5827 1.09 |Q | | | V|
23+35 4.5901 1.08 |Q | | | V|
23+40 4.5975 1.07 |Q | | | V|
23+45 4.6048 1.06 |Q | | | V|
23+50 4.6121 1.06 |Q | | | V|
23+55 4.6193 1.05 |Q | | | V|
24+ 0 4.6265 1.05 |Q | | | V|
24+ 5 4.6332 0.97 Q | | | V|
24+10 4.6374 0.60 Q | | | V|
24+15 4.6387 0.19 Q | | | V|
24+20 4.6390 0.05 Q | | | V|
24+25 4.6391 0.01 Q | | | V|
-----------------------------------------------------------------------
APPENDIX C.2: 25-YEAR STORM EVENT
1
U n i t H y d r o g r a p h A n a l y s i s
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2014, Version 9.0
Study date 04/11/22
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
------------------------------------------------------------------------
San Bernardino County Synthetic Unit Hydrology Method
Manual date - August 1986
Program License Serial Number 6279
---------------------------------------------------------------------
265.22.22
UNIT HYDROGRAPH FOR ONSITE AREA
POST-PROJECT CONDITION
FN: ARAPOST25
--------------------------------------------------------------------
Storm Event Year = 25
Antecedent Moisture Condition = 2
English (in-lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
Area averaged rainfall intensity isohyetal data:
Sub-Area Duration Isohyetal
(Ac.) (hours) (In)
Rainfall data for year 10
8.81 1 0.93
--------------------------------------------------------------------
Rainfall data for year 2
8.81 6 1.64
--------------------------------------------------------------------
Rainfall data for year 2
8.81 24 3.07
--------------------------------------------------------------------
Rainfall data for year 100
8.81 1 1.51
--------------------------------------------------------------------
Rainfall data for year 100
8.81 6 3.78
--------------------------------------------------------------------
Rainfall data for year 100
8.81 24 7.02
--------------------------------------------------------------------
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
******** Area-averaged max loss rate, Fm ********
SCS curve SCS curve Area Area Fp(Fig C6) Ap Fm
No.(AMCII) NO.(AMC 2) (Ac.) Fraction (In/Hr) (dec.) (In/Hr)
46.0 46.0 8.81 1.000 0.856 0.100 0.086
Area-averaged adjusted loss rate Fm (In/Hr) = 0.086
********* Area-Averaged low loss rate fraction, Yb **********
2
Area Area SCS CN SCS CN S Pervious
(Ac.) Fract (AMC2) (AMC2) Yield Fr
0.88 0.100 46.0 46.0 11.74 0.127
7.93 0.900 98.0 98.0 0.20 0.958
Area-averaged catchment yield fraction, Y = 0.875
Area-averaged low loss fraction, Yb = 0.125
User entry of time of concentration = 0.173 (hours)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Watershed area = 8.81(Ac.)
Catchment Lag time = 0.138 hours
Unit interval = 5.000 minutes
Unit interval percentage of lag time = 60.3340
Hydrograph baseflow = 0.00(CFS)
Average maximum watershed loss rate(Fm) = 0.086(In/Hr)
Average low loss rate fraction (Yb) = 0.125 (decimal)
VALLEY DEVELOPED S-Graph Selected
Computed peak 5-minute rainfall = 0.430(In)
Computed peak 30-minute rainfall = 0.880(In)
Specified peak 1-hour rainfall = 1.161(In)
Computed peak 3-hour rainfall = 2.087(In)
Specified peak 6-hour rainfall = 3.022(In)
Specified peak 24-hour rainfall = 5.620(In)
Rainfall depth area reduction factors:
Using a total area of 8.81(Ac.) (Ref: fig. E-4)
5-minute factor = 1.000 Adjusted rainfall = 0.430(In)
30-minute factor = 1.000 Adjusted rainfall = 0.880(In)
1-hour factor = 1.000 Adjusted rainfall = 1.161(In)
3-hour factor = 1.000 Adjusted rainfall = 2.087(In)
6-hour factor = 1.000 Adjusted rainfall = 3.022(In)
24-hour factor = 1.000 Adjusted rainfall = 5.620(In)
---------------------------------------------------------------------
U n i t H y d r o g r a p h
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Interval 'S' Graph Unit Hydrograph
Number Mean values ((CFS))
---------------------------------------------------------------------
(K = 106.55 (CFS))
1 6.589 7.020
2 42.052 37.785
3 82.029 42.593
4 95.655 14.518
5 98.687 3.231
6 100.000 1.399
---------------------------------------------------------------------
Peak Unit Adjusted mass rainfall Unit rainfall
Number (In) (In)
1 0.4297 0.4297
2 0.5669 0.1373
3 0.6668 0.0998
4 0.7481 0.0813
5 0.8179 0.0698
6 0.8798 0.0619
7 0.9358 0.0560
8 0.9871 0.0513
9 1.0347 0.0476
10 1.0793 0.0445
11 1.1212 0.0419
12 1.1609 0.0397
13 1.2116 0.0507
14 1.2605 0.0489
15 1.3078 0.0473
16 1.3537 0.0459
17 1.3982 0.0445
18 1.4416 0.0433
19 1.4838 0.0422
3
20 1.5250 0.0412
21 1.5652 0.0403
22 1.6046 0.0394
23 1.6432 0.0385
24 1.6809 0.0378
25 1.7180 0.0370
26 1.7543 0.0364
27 1.7900 0.0357
28 1.8251 0.0351
29 1.8597 0.0345
30 1.8936 0.0340
31 1.9271 0.0334
32 1.9600 0.0329
33 1.9925 0.0325
34 2.0245 0.0320
35 2.0561 0.0316
36 2.0873 0.0312
37 2.1180 0.0307
38 2.1484 0.0304
39 2.1784 0.0300
40 2.2080 0.0296
41 2.2373 0.0293
42 2.2662 0.0290
43 2.2949 0.0286
44 2.3232 0.0283
45 2.3512 0.0280
46 2.3790 0.0277
47 2.4064 0.0275
48 2.4336 0.0272
49 2.4606 0.0269
50 2.4872 0.0267
51 2.5137 0.0264
52 2.5398 0.0262
53 2.5658 0.0260
54 2.5915 0.0257
55 2.6170 0.0255
56 2.6423 0.0253
57 2.6674 0.0251
58 2.6923 0.0249
59 2.7169 0.0247
60 2.7414 0.0245
61 2.7657 0.0243
62 2.7898 0.0241
63 2.8137 0.0239
64 2.8375 0.0237
65 2.8611 0.0236
66 2.8845 0.0234
67 2.9077 0.0232
68 2.9308 0.0231
69 2.9537 0.0229
70 2.9765 0.0228
71 2.9991 0.0226
72 3.0216 0.0225
73 3.0403 0.0187
74 3.0589 0.0186
75 3.0773 0.0184
76 3.0956 0.0183
77 3.1138 0.0182
78 3.1318 0.0180
79 3.1497 0.0179
80 3.1675 0.0178
81 3.1852 0.0177
82 3.2027 0.0175
83 3.2201 0.0174
84 3.2374 0.0173
85 3.2546 0.0172
86 3.2717 0.0171
87 3.2887 0.0170
88 3.3056 0.0169
89 3.3223 0.0168
90 3.3390 0.0167
4
91 3.3555 0.0166
92 3.3720 0.0165
93 3.3884 0.0164
94 3.4046 0.0163
95 3.4208 0.0162
96 3.4369 0.0161
97 3.4528 0.0160
98 3.4687 0.0159
99 3.4845 0.0158
100 3.5003 0.0157
101 3.5159 0.0156
102 3.5314 0.0155
103 3.5469 0.0155
104 3.5622 0.0154
105 3.5775 0.0153
106 3.5928 0.0152
107 3.6079 0.0151
108 3.6229 0.0151
109 3.6379 0.0150
110 3.6528 0.0149
111 3.6677 0.0148
112 3.6824 0.0148
113 3.6971 0.0147
114 3.7117 0.0146
115 3.7262 0.0145
116 3.7407 0.0145
117 3.7551 0.0144
118 3.7694 0.0143
119 3.7837 0.0143
120 3.7979 0.0142
121 3.8121 0.0141
122 3.8261 0.0141
123 3.8401 0.0140
124 3.8541 0.0139
125 3.8680 0.0139
126 3.8818 0.0138
127 3.8955 0.0138
128 3.9092 0.0137
129 3.9229 0.0136
130 3.9365 0.0136
131 3.9500 0.0135
132 3.9635 0.0135
133 3.9769 0.0134
134 3.9902 0.0134
135 4.0035 0.0133
136 4.0168 0.0132
137 4.0300 0.0132
138 4.0431 0.0131
139 4.0562 0.0131
140 4.0693 0.0130
141 4.0822 0.0130
142 4.0952 0.0129
143 4.1081 0.0129
144 4.1209 0.0128
145 4.1337 0.0128
146 4.1464 0.0127
147 4.1591 0.0127
148 4.1718 0.0126
149 4.1843 0.0126
150 4.1969 0.0125
151 4.2094 0.0125
152 4.2219 0.0125
153 4.2343 0.0124
154 4.2466 0.0124
155 4.2590 0.0123
156 4.2712 0.0123
157 4.2835 0.0122
158 4.2957 0.0122
159 4.3078 0.0121
160 4.3199 0.0121
161 4.3320 0.0121
5
162 4.3440 0.0120
163 4.3560 0.0120
164 4.3679 0.0119
165 4.3798 0.0119
166 4.3917 0.0119
167 4.4035 0.0118
168 4.4153 0.0118
169 4.4271 0.0117
170 4.4388 0.0117
171 4.4504 0.0117
172 4.4621 0.0116
173 4.4737 0.0116
174 4.4852 0.0116
175 4.4967 0.0115
176 4.5082 0.0115
177 4.5197 0.0114
178 4.5311 0.0114
179 4.5425 0.0114
180 4.5538 0.0113
181 4.5651 0.0113
182 4.5764 0.0113
183 4.5876 0.0112
184 4.5988 0.0112
185 4.6100 0.0112
186 4.6211 0.0111
187 4.6322 0.0111
188 4.6433 0.0111
189 4.6544 0.0110
190 4.6654 0.0110
191 4.6763 0.0110
192 4.6873 0.0109
193 4.6982 0.0109
194 4.7091 0.0109
195 4.7199 0.0109
196 4.7308 0.0108
197 4.7415 0.0108
198 4.7523 0.0108
199 4.7630 0.0107
200 4.7737 0.0107
201 4.7844 0.0107
202 4.7950 0.0106
203 4.8057 0.0106
204 4.8162 0.0106
205 4.8268 0.0106
206 4.8373 0.0105
207 4.8478 0.0105
208 4.8583 0.0105
209 4.8687 0.0104
210 4.8791 0.0104
211 4.8895 0.0104
212 4.8999 0.0104
213 4.9102 0.0103
214 4.9205 0.0103
215 4.9308 0.0103
216 4.9411 0.0103
217 4.9513 0.0102
218 4.9615 0.0102
219 4.9717 0.0102
220 4.9818 0.0101
221 4.9919 0.0101
222 5.0020 0.0101
223 5.0121 0.0101
224 5.0222 0.0100
225 5.0322 0.0100
226 5.0422 0.0100
227 5.0522 0.0100
228 5.0621 0.0100
229 5.0720 0.0099
230 5.0819 0.0099
231 5.0918 0.0099
232 5.1017 0.0099
6
233 5.1115 0.0098
234 5.1213 0.0098
235 5.1311 0.0098
236 5.1409 0.0098
237 5.1506 0.0097
238 5.1603 0.0097
239 5.1700 0.0097
240 5.1797 0.0097
241 5.1893 0.0097
242 5.1990 0.0096
243 5.2086 0.0096
244 5.2182 0.0096
245 5.2277 0.0096
246 5.2373 0.0095
247 5.2468 0.0095
248 5.2563 0.0095
249 5.2658 0.0095
250 5.2752 0.0095
251 5.2847 0.0094
252 5.2941 0.0094
253 5.3035 0.0094
254 5.3128 0.0094
255 5.3222 0.0094
256 5.3315 0.0093
257 5.3408 0.0093
258 5.3501 0.0093
259 5.3594 0.0093
260 5.3687 0.0093
261 5.3779 0.0092
262 5.3871 0.0092
263 5.3963 0.0092
264 5.4055 0.0092
265 5.4146 0.0092
266 5.4238 0.0091
267 5.4329 0.0091
268 5.4420 0.0091
269 5.4511 0.0091
270 5.4601 0.0091
271 5.4692 0.0090
272 5.4782 0.0090
273 5.4872 0.0090
274 5.4962 0.0090
275 5.5052 0.0090
276 5.5141 0.0090
277 5.5231 0.0089
278 5.5320 0.0089
279 5.5409 0.0089
280 5.5498 0.0089
281 5.5586 0.0089
282 5.5675 0.0088
283 5.5763 0.0088
284 5.5851 0.0088
285 5.5939 0.0088
286 5.6027 0.0088
287 5.6114 0.0088
288 5.6202 0.0087
---------------------------------------------------------------------
Unit Unit Unit Effective
Period Rainfall Soil-Loss Rainfall
(number) (In) (In) (In)
---------------------------------------------------------------------
1 0.0087 0.0011 0.0076
2 0.0088 0.0011 0.0077
3 0.0088 0.0011 0.0077
4 0.0088 0.0011 0.0077
5 0.0088 0.0011 0.0077
6 0.0089 0.0011 0.0078
7 0.0089 0.0011 0.0078
8 0.0089 0.0011 0.0078
9 0.0090 0.0011 0.0078
10 0.0090 0.0011 0.0078
7
11 0.0090 0.0011 0.0079
12 0.0090 0.0011 0.0079
13 0.0091 0.0011 0.0079
14 0.0091 0.0011 0.0079
15 0.0091 0.0011 0.0080
16 0.0091 0.0011 0.0080
17 0.0092 0.0012 0.0080
18 0.0092 0.0012 0.0080
19 0.0092 0.0012 0.0081
20 0.0093 0.0012 0.0081
21 0.0093 0.0012 0.0081
22 0.0093 0.0012 0.0081
23 0.0094 0.0012 0.0082
24 0.0094 0.0012 0.0082
25 0.0094 0.0012 0.0082
26 0.0094 0.0012 0.0083
27 0.0095 0.0012 0.0083
28 0.0095 0.0012 0.0083
29 0.0095 0.0012 0.0083
30 0.0096 0.0012 0.0084
31 0.0096 0.0012 0.0084
32 0.0096 0.0012 0.0084
33 0.0097 0.0012 0.0085
34 0.0097 0.0012 0.0085
35 0.0097 0.0012 0.0085
36 0.0098 0.0012 0.0085
37 0.0098 0.0012 0.0086
38 0.0098 0.0012 0.0086
39 0.0099 0.0012 0.0086
40 0.0099 0.0012 0.0087
41 0.0100 0.0012 0.0087
42 0.0100 0.0013 0.0087
43 0.0100 0.0013 0.0088
44 0.0100 0.0013 0.0088
45 0.0101 0.0013 0.0088
46 0.0101 0.0013 0.0089
47 0.0102 0.0013 0.0089
48 0.0102 0.0013 0.0089
49 0.0103 0.0013 0.0090
50 0.0103 0.0013 0.0090
51 0.0103 0.0013 0.0090
52 0.0104 0.0013 0.0091
53 0.0104 0.0013 0.0091
54 0.0104 0.0013 0.0091
55 0.0105 0.0013 0.0092
56 0.0105 0.0013 0.0092
57 0.0106 0.0013 0.0093
58 0.0106 0.0013 0.0093
59 0.0107 0.0013 0.0093
60 0.0107 0.0013 0.0094
61 0.0108 0.0013 0.0094
62 0.0108 0.0014 0.0094
63 0.0109 0.0014 0.0095
64 0.0109 0.0014 0.0095
65 0.0109 0.0014 0.0096
66 0.0110 0.0014 0.0096
67 0.0110 0.0014 0.0097
68 0.0111 0.0014 0.0097
69 0.0111 0.0014 0.0097
70 0.0112 0.0014 0.0098
71 0.0112 0.0014 0.0098
72 0.0113 0.0014 0.0099
73 0.0113 0.0014 0.0099
74 0.0114 0.0014 0.0100
75 0.0114 0.0014 0.0100
76 0.0115 0.0014 0.0100
77 0.0116 0.0014 0.0101
78 0.0116 0.0015 0.0101
79 0.0117 0.0015 0.0102
80 0.0117 0.0015 0.0102
81 0.0118 0.0015 0.0103
8
82 0.0118 0.0015 0.0103
83 0.0119 0.0015 0.0104
84 0.0119 0.0015 0.0104
85 0.0120 0.0015 0.0105
86 0.0121 0.0015 0.0106
87 0.0121 0.0015 0.0106
88 0.0122 0.0015 0.0107
89 0.0123 0.0015 0.0107
90 0.0123 0.0015 0.0108
91 0.0124 0.0016 0.0109
92 0.0125 0.0016 0.0109
93 0.0125 0.0016 0.0110
94 0.0126 0.0016 0.0110
95 0.0127 0.0016 0.0111
96 0.0127 0.0016 0.0111
97 0.0128 0.0016 0.0112
98 0.0129 0.0016 0.0113
99 0.0130 0.0016 0.0114
100 0.0130 0.0016 0.0114
101 0.0131 0.0016 0.0115
102 0.0132 0.0017 0.0115
103 0.0133 0.0017 0.0116
104 0.0134 0.0017 0.0117
105 0.0135 0.0017 0.0118
106 0.0135 0.0017 0.0118
107 0.0136 0.0017 0.0119
108 0.0137 0.0017 0.0120
109 0.0138 0.0017 0.0121
110 0.0139 0.0017 0.0121
111 0.0140 0.0018 0.0123
112 0.0141 0.0018 0.0123
113 0.0142 0.0018 0.0124
114 0.0143 0.0018 0.0125
115 0.0144 0.0018 0.0126
116 0.0145 0.0018 0.0127
117 0.0146 0.0018 0.0128
118 0.0147 0.0018 0.0128
119 0.0148 0.0019 0.0130
120 0.0149 0.0019 0.0130
121 0.0151 0.0019 0.0132
122 0.0151 0.0019 0.0132
123 0.0153 0.0019 0.0134
124 0.0154 0.0019 0.0134
125 0.0155 0.0019 0.0136
126 0.0156 0.0020 0.0137
127 0.0158 0.0020 0.0138
128 0.0159 0.0020 0.0139
129 0.0161 0.0020 0.0141
130 0.0162 0.0020 0.0141
131 0.0164 0.0021 0.0143
132 0.0165 0.0021 0.0144
133 0.0167 0.0021 0.0146
134 0.0168 0.0021 0.0147
135 0.0170 0.0021 0.0148
136 0.0171 0.0021 0.0149
137 0.0173 0.0022 0.0151
138 0.0174 0.0022 0.0152
139 0.0177 0.0022 0.0154
140 0.0178 0.0022 0.0156
141 0.0180 0.0023 0.0158
142 0.0182 0.0023 0.0159
143 0.0184 0.0023 0.0161
144 0.0186 0.0023 0.0162
145 0.0225 0.0028 0.0197
146 0.0226 0.0028 0.0198
147 0.0229 0.0029 0.0200
148 0.0231 0.0029 0.0202
149 0.0234 0.0029 0.0205
150 0.0236 0.0030 0.0206
151 0.0239 0.0030 0.0209
152 0.0241 0.0030 0.0211
9
153 0.0245 0.0031 0.0214
154 0.0247 0.0031 0.0216
155 0.0251 0.0031 0.0219
156 0.0253 0.0032 0.0221
157 0.0257 0.0032 0.0225
158 0.0260 0.0033 0.0227
159 0.0264 0.0033 0.0231
160 0.0267 0.0033 0.0233
161 0.0272 0.0034 0.0238
162 0.0275 0.0034 0.0240
163 0.0280 0.0035 0.0245
164 0.0283 0.0036 0.0248
165 0.0290 0.0036 0.0253
166 0.0293 0.0037 0.0256
167 0.0300 0.0038 0.0262
168 0.0304 0.0038 0.0266
169 0.0312 0.0039 0.0273
170 0.0316 0.0040 0.0276
171 0.0325 0.0041 0.0284
172 0.0329 0.0041 0.0288
173 0.0340 0.0043 0.0297
174 0.0345 0.0043 0.0302
175 0.0357 0.0045 0.0312
176 0.0364 0.0046 0.0318
177 0.0378 0.0047 0.0330
178 0.0385 0.0048 0.0337
179 0.0403 0.0050 0.0352
180 0.0412 0.0052 0.0360
181 0.0433 0.0054 0.0379
182 0.0445 0.0056 0.0390
183 0.0473 0.0059 0.0414
184 0.0489 0.0061 0.0428
185 0.0397 0.0050 0.0347
186 0.0419 0.0053 0.0367
187 0.0476 0.0060 0.0416
188 0.0513 0.0064 0.0449
189 0.0619 0.0071 0.0548
190 0.0698 0.0071 0.0627
191 0.0998 0.0071 0.0927
192 0.1373 0.0071 0.1302
193 0.4297 0.0071 0.4225
194 0.0813 0.0071 0.0742
195 0.0560 0.0070 0.0489
196 0.0445 0.0056 0.0390
197 0.0507 0.0064 0.0443
198 0.0459 0.0057 0.0401
199 0.0422 0.0053 0.0369
200 0.0394 0.0049 0.0344
201 0.0370 0.0046 0.0324
202 0.0351 0.0044 0.0307
203 0.0334 0.0042 0.0293
204 0.0320 0.0040 0.0280
205 0.0307 0.0039 0.0269
206 0.0296 0.0037 0.0259
207 0.0286 0.0036 0.0250
208 0.0277 0.0035 0.0243
209 0.0269 0.0034 0.0236
210 0.0262 0.0033 0.0229
211 0.0255 0.0032 0.0223
212 0.0249 0.0031 0.0218
213 0.0243 0.0030 0.0212
214 0.0237 0.0030 0.0208
215 0.0232 0.0029 0.0203
216 0.0228 0.0029 0.0199
217 0.0187 0.0023 0.0164
218 0.0183 0.0023 0.0160
219 0.0179 0.0022 0.0157
220 0.0175 0.0022 0.0153
221 0.0172 0.0022 0.0150
222 0.0169 0.0021 0.0148
223 0.0166 0.0021 0.0145
10
224 0.0163 0.0020 0.0142
225 0.0160 0.0020 0.0140
226 0.0157 0.0020 0.0137
227 0.0155 0.0019 0.0135
228 0.0152 0.0019 0.0133
229 0.0150 0.0019 0.0131
230 0.0148 0.0018 0.0129
231 0.0145 0.0018 0.0127
232 0.0143 0.0018 0.0125
233 0.0141 0.0018 0.0124
234 0.0139 0.0017 0.0122
235 0.0138 0.0017 0.0120
236 0.0136 0.0017 0.0119
237 0.0134 0.0017 0.0117
238 0.0132 0.0017 0.0116
239 0.0131 0.0016 0.0114
240 0.0129 0.0016 0.0113
241 0.0128 0.0016 0.0112
242 0.0126 0.0016 0.0111
243 0.0125 0.0016 0.0109
244 0.0124 0.0016 0.0108
245 0.0122 0.0015 0.0107
246 0.0121 0.0015 0.0106
247 0.0120 0.0015 0.0105
248 0.0119 0.0015 0.0104
249 0.0117 0.0015 0.0103
250 0.0116 0.0015 0.0102
251 0.0115 0.0014 0.0101
252 0.0114 0.0014 0.0100
253 0.0113 0.0014 0.0099
254 0.0112 0.0014 0.0098
255 0.0111 0.0014 0.0097
256 0.0110 0.0014 0.0096
257 0.0109 0.0014 0.0095
258 0.0108 0.0014 0.0095
259 0.0107 0.0013 0.0094
260 0.0106 0.0013 0.0093
261 0.0106 0.0013 0.0092
262 0.0105 0.0013 0.0092
263 0.0104 0.0013 0.0091
264 0.0103 0.0013 0.0090
265 0.0102 0.0013 0.0089
266 0.0101 0.0013 0.0089
267 0.0101 0.0013 0.0088
268 0.0100 0.0013 0.0087
269 0.0099 0.0012 0.0087
270 0.0099 0.0012 0.0086
271 0.0098 0.0012 0.0086
272 0.0097 0.0012 0.0085
273 0.0097 0.0012 0.0084
274 0.0096 0.0012 0.0084
275 0.0095 0.0012 0.0083
276 0.0095 0.0012 0.0083
277 0.0094 0.0012 0.0082
278 0.0093 0.0012 0.0082
279 0.0093 0.0012 0.0081
280 0.0092 0.0012 0.0081
281 0.0092 0.0011 0.0080
282 0.0091 0.0011 0.0080
283 0.0090 0.0011 0.0079
284 0.0090 0.0011 0.0079
285 0.0089 0.0011 0.0078
286 0.0089 0.0011 0.0078
287 0.0088 0.0011 0.0077
288 0.0088 0.0011 0.0077
--------------------------------------------------------------------
--------------------------------------------------------------------
Total soil rain loss = 0.64(In)
Total effective rainfall = 4.98(In)
Peak flow rate in flood hydrograph = 23.65(CFS)
---------------------------------------------------------------------
11
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
24 - H O U R S T O R M
R u n o f f H y d r o g r a p h
--------------------------------------------------------------------
Hydrograph in 5 Minute intervals ((CFS))
--------------------------------------------------------------------
Time(h+m) Volume Ac.Ft Q(CFS) 0 7.5 15.0 22.5 30.0
-----------------------------------------------------------------------
0+ 5 0.0004 0.05 Q | | | |
0+10 0.0027 0.34 Q | | | |
0+15 0.0073 0.67 Q | | | |
0+20 0.0127 0.78 VQ | | | |
0+25 0.0183 0.81 VQ | | | |
0+30 0.0240 0.82 VQ | | | |
0+35 0.0296 0.82 VQ | | | |
0+40 0.0353 0.83 VQ | | | |
0+45 0.0411 0.83 VQ | | | |
0+50 0.0468 0.83 VQ | | | |
0+55 0.0525 0.83 VQ | | | |
1+ 0 0.0583 0.84 VQ | | | |
1+ 5 0.0641 0.84 VQ | | | |
1+10 0.0699 0.84 VQ | | | |
1+15 0.0757 0.84 VQ | | | |
1+20 0.0815 0.85 VQ | | | |
1+25 0.0874 0.85 VQ | | | |
1+30 0.0933 0.85 |Q | | | |
1+35 0.0991 0.86 |Q | | | |
1+40 0.1051 0.86 |Q | | | |
1+45 0.1110 0.86 |Q | | | |
1+50 0.1169 0.86 |Q | | | |
1+55 0.1229 0.87 |Q | | | |
2+ 0 0.1289 0.87 |Q | | | |
2+ 5 0.1349 0.87 |Q | | | |
2+10 0.1409 0.87 |Q | | | |
2+15 0.1470 0.88 |Q | | | |
2+20 0.1530 0.88 |Q | | | |
2+25 0.1591 0.88 |Q | | | |
2+30 0.1652 0.89 |Q | | | |
2+35 0.1713 0.89 |Q | | | |
2+40 0.1775 0.89 |Q | | | |
2+45 0.1836 0.90 |QV | | | |
2+50 0.1898 0.90 |QV | | | |
2+55 0.1960 0.90 |QV | | | |
3+ 0 0.2023 0.90 |QV | | | |
3+ 5 0.2085 0.91 |QV | | | |
3+10 0.2148 0.91 |QV | | | |
3+15 0.2211 0.91 |QV | | | |
3+20 0.2274 0.92 |QV | | | |
3+25 0.2338 0.92 |QV | | | |
3+30 0.2401 0.92 |QV | | | |
3+35 0.2465 0.93 |QV | | | |
3+40 0.2529 0.93 |QV | | | |
3+45 0.2594 0.93 |QV | | | |
3+50 0.2658 0.94 |QV | | | |
3+55 0.2723 0.94 |QV | | | |
4+ 0 0.2788 0.94 |Q V | | | |
4+ 5 0.2853 0.95 |Q V | | | |
4+10 0.2919 0.95 |Q V | | | |
4+15 0.2985 0.96 |Q V | | | |
4+20 0.3051 0.96 |Q V | | | |
4+25 0.3117 0.96 |Q V | | | |
4+30 0.3184 0.97 |Q V | | | |
4+35 0.3251 0.97 |Q V | | | |
4+40 0.3318 0.97 |Q V | | | |
4+45 0.3385 0.98 |Q V | | | |
4+50 0.3453 0.98 |Q V | | | |
4+55 0.3521 0.99 |Q V | | | |
5+ 0 0.3589 0.99 |Q V | | | |
5+ 5 0.3658 0.99 |Q V | | | |
5+10 0.3726 1.00 |Q V | | | |
12
5+15 0.3795 1.00 |Q V | | | |
5+20 0.3865 1.01 |Q V | | | |
5+25 0.3935 1.01 |Q V | | | |
5+30 0.4005 1.02 |Q V | | | |
5+35 0.4075 1.02 |Q V | | | |
5+40 0.4145 1.02 |Q V | | | |
5+45 0.4216 1.03 |Q V | | | |
5+50 0.4287 1.03 |Q V | | | |
5+55 0.4359 1.04 |Q V | | | |
6+ 0 0.4431 1.04 |Q V | | | |
6+ 5 0.4503 1.05 |Q V | | | |
6+10 0.4575 1.05 |Q V | | | |
6+15 0.4648 1.06 |Q V | | | |
6+20 0.4721 1.06 |Q V | | | |
6+25 0.4795 1.07 |Q V | | | |
6+30 0.4869 1.07 |Q V | | | |
6+35 0.4943 1.08 |Q V | | | |
6+40 0.5018 1.08 |Q V | | | |
6+45 0.5092 1.09 |Q V | | | |
6+50 0.5168 1.09 |Q V | | | |
6+55 0.5243 1.10 |Q V | | | |
7+ 0 0.5319 1.10 |Q V | | | |
7+ 5 0.5396 1.11 |Q V | | | |
7+10 0.5473 1.12 |Q V | | | |
7+15 0.5550 1.12 |Q V | | | |
7+20 0.5628 1.13 |Q V | | | |
7+25 0.5706 1.13 |Q V | | | |
7+30 0.5784 1.14 |Q V | | | |
7+35 0.5863 1.14 |Q V | | | |
7+40 0.5942 1.15 |Q V | | | |
7+45 0.6022 1.16 |Q V | | | |
7+50 0.6102 1.16 |Q V | | | |
7+55 0.6182 1.17 |Q V | | | |
8+ 0 0.6264 1.18 |Q V | | | |
8+ 5 0.6345 1.18 |Q V | | | |
8+10 0.6427 1.19 |Q V | | | |
8+15 0.6509 1.20 |Q V | | | |
8+20 0.6592 1.20 |Q V | | | |
8+25 0.6676 1.21 |Q V | | | |
8+30 0.6760 1.22 |Q V | | | |
8+35 0.6844 1.23 |Q V | | | |
8+40 0.6929 1.23 |Q V | | | |
8+45 0.7014 1.24 |Q V | | | |
8+50 0.7100 1.25 |Q V | | | |
8+55 0.7187 1.26 |Q V | | | |
9+ 0 0.7274 1.26 |Q V | | | |
9+ 5 0.7361 1.27 |Q V | | | |
9+10 0.7450 1.28 |Q V | | | |
9+15 0.7538 1.29 |Q V | | | |
9+20 0.7628 1.30 |Q V | | | |
9+25 0.7718 1.31 |Q V | | | |
9+30 0.7808 1.32 |Q V | | | |
9+35 0.7899 1.32 |Q V | | | |
9+40 0.7991 1.33 |Q V | | | |
9+45 0.8084 1.34 |Q V | | | |
9+50 0.8177 1.35 |Q V | | | |
9+55 0.8271 1.36 |Q V| | | |
10+ 0 0.8365 1.37 |Q V| | | |
10+ 5 0.8460 1.38 |Q V| | | |
10+10 0.8556 1.39 |Q V| | | |
10+15 0.8653 1.40 |Q V| | | |
10+20 0.8751 1.42 |Q V| | | |
10+25 0.8849 1.43 |Q V| | | |
10+30 0.8948 1.44 |Q V| | | |
10+35 0.9048 1.45 |Q V| | | |
10+40 0.9148 1.46 |Q V | | |
10+45 0.9250 1.47 |Q V | | |
10+50 0.9352 1.49 |Q V | | |
10+55 0.9455 1.50 |Q V | | |
11+ 0 0.9560 1.51 | Q V | | |
11+ 5 0.9665 1.53 | Q V | | |
13
11+10 0.9771 1.54 | Q V | | |
11+15 0.9878 1.55 | Q V | | |
11+20 0.9986 1.57 | Q V | | |
11+25 1.0095 1.58 | Q |V | | |
11+30 1.0205 1.60 | Q |V | | |
11+35 1.0316 1.61 | Q |V | | |
11+40 1.0428 1.63 | Q |V | | |
11+45 1.0542 1.65 | Q |V | | |
11+50 1.0656 1.66 | Q |V | | |
11+55 1.0772 1.68 | Q |V | | |
12+ 0 1.0890 1.70 | Q |V | | |
12+ 5 1.1010 1.74 | Q | V | | |
12+10 1.1139 1.88 | Q | V | | |
12+15 1.1279 2.04 | Q | V | | |
12+20 1.1424 2.10 | Q | V | | |
12+25 1.1571 2.13 | Q | V | | |
12+30 1.1720 2.16 | Q | V | | |
12+35 1.1870 2.18 | Q | V | | |
12+40 1.2022 2.21 | Q | V | | |
12+45 1.2176 2.23 | Q | V | | |
12+50 1.2331 2.26 | Q | V | | |
12+55 1.2489 2.28 | Q | V | | |
13+ 0 1.2648 2.31 | Q | V | | |
13+ 5 1.2809 2.34 | Q | V | | |
13+10 1.2972 2.37 | Q | V | | |
13+15 1.3138 2.40 | Q | V | | |
13+20 1.3305 2.43 | Q | V | | |
13+25 1.3475 2.47 | Q | V | | |
13+30 1.3647 2.50 | Q | V | | |
13+35 1.3822 2.54 | Q | V | | |
13+40 1.3999 2.58 | Q | V | | |
13+45 1.4180 2.62 | Q | V | | |
13+50 1.4363 2.66 | Q | V | | |
13+55 1.4549 2.70 | Q | V | | |
14+ 0 1.4738 2.75 | Q | V | | |
14+ 5 1.4931 2.80 | Q | V | | |
14+10 1.5128 2.85 | Q | V | | |
14+15 1.5328 2.91 | Q | V | | |
14+20 1.5533 2.97 | Q | V | | |
14+25 1.5742 3.03 | Q | V | | |
14+30 1.5955 3.10 | Q | V | | |
14+35 1.6174 3.17 | Q | V | | |
14+40 1.6398 3.25 | Q | V | | |
14+45 1.6628 3.34 | Q | V | | |
14+50 1.6864 3.43 | Q | V | | |
14+55 1.7108 3.53 | Q | V | | |
15+ 0 1.7359 3.65 | Q | V | | |
15+ 5 1.7618 3.77 | Q | V| | |
15+10 1.7887 3.91 | Q | V| | |
15+15 1.8167 4.06 | Q | V| | |
15+20 1.8459 4.24 | Q | V | |
15+25 1.8759 4.36 | Q | V | |
15+30 1.9046 4.17 | Q | V | |
15+35 1.9320 3.97 | Q | |V | |
15+40 1.9605 4.15 | Q | |V | |
15+45 1.9919 4.56 | Q | |V | |
15+50 2.0277 5.19 | Q | | V | |
15+55 2.0703 6.19 | Q | | V | |
16+ 0 2.1260 8.09 | Q | V | |
16+ 5 2.2154 12.98 | | Q | V | |
16+10 2.3784 23.65 | | | V |Q |
16+15 2.5397 23.42 | | | V |Q |
16+20 2.6221 11.97 | | Q | V | |
16+25 2.6668 6.49 | Q | | V| |
16+30 2.7023 5.16 | Q | | V| |
16+35 2.7332 4.49 | Q | | V| |
16+40 2.7620 4.18 | Q | | V |
16+45 2.7888 3.88 | Q | | V |
16+50 2.8138 3.63 | Q | | V |
16+55 2.8374 3.42 | Q | | |V |
17+ 0 2.8597 3.24 | Q | | |V |
14
17+ 5 2.8810 3.09 | Q | | |V |
17+10 2.9014 2.96 | Q | | |V |
17+15 2.9210 2.84 | Q | | |V |
17+20 2.9399 2.74 | Q | | | V |
17+25 2.9581 2.65 | Q | | | V |
17+30 2.9758 2.57 | Q | | | V |
17+35 2.9930 2.49 | Q | | | V |
17+40 3.0097 2.43 | Q | | | V |
17+45 3.0260 2.36 | Q | | | V |
17+50 3.0419 2.31 | Q | | | V |
17+55 3.0574 2.25 | Q | | | V |
18+ 0 3.0725 2.20 | Q | | | V |
18+ 5 3.0872 2.13 | Q | | | V |
18+10 3.1008 1.97 | Q | | | V |
18+15 3.1132 1.80 | Q | | | V |
18+20 3.1250 1.71 | Q | | | V |
18+25 3.1364 1.67 | Q | | | V |
18+30 3.1476 1.63 | Q | | | V |
18+35 3.1586 1.60 | Q | | | V |
18+40 3.1694 1.57 | Q | | | V |
18+45 3.1800 1.54 | Q | | | V |
18+50 3.1904 1.51 | Q | | | V |
18+55 3.2006 1.48 |Q | | | V |
19+ 0 3.2107 1.46 |Q | | | V |
19+ 5 3.2205 1.44 |Q | | | V |
19+10 3.2303 1.41 |Q | | | V |
19+15 3.2399 1.39 |Q | | | V |
19+20 3.2493 1.37 |Q | | | V |
19+25 3.2586 1.35 |Q | | | V |
19+30 3.2678 1.33 |Q | | | V |
19+35 3.2768 1.31 |Q | | | V |
19+40 3.2857 1.30 |Q | | | V |
19+45 3.2945 1.28 |Q | | | V |
19+50 3.3032 1.26 |Q | | | V |
19+55 3.3118 1.25 |Q | | | V |
20+ 0 3.3203 1.23 |Q | | | V |
20+ 5 3.3287 1.22 |Q | | | V |
20+10 3.3369 1.20 |Q | | | V |
20+15 3.3451 1.19 |Q | | | V |
20+20 3.3532 1.17 |Q | | | V |
20+25 3.3612 1.16 |Q | | | V |
20+30 3.3691 1.15 |Q | | | V |
20+35 3.3770 1.14 |Q | | | V |
20+40 3.3847 1.13 |Q | | | V |
20+45 3.3924 1.11 |Q | | | V |
20+50 3.4000 1.10 |Q | | | V |
20+55 3.4075 1.09 |Q | | | V |
21+ 0 3.4150 1.08 |Q | | | V |
21+ 5 3.4223 1.07 |Q | | | V |
21+10 3.4296 1.06 |Q | | | V |
21+15 3.4369 1.05 |Q | | | V |
21+20 3.4441 1.04 |Q | | | V |
21+25 3.4512 1.03 |Q | | | V |
21+30 3.4582 1.02 |Q | | | V |
21+35 3.4652 1.01 |Q | | | V |
21+40 3.4721 1.01 |Q | | | V |
21+45 3.4790 1.00 |Q | | | V |
21+50 3.4858 0.99 |Q | | | V |
21+55 3.4926 0.98 |Q | | | V |
22+ 0 3.4993 0.97 |Q | | | V |
22+ 5 3.5060 0.97 |Q | | | V |
22+10 3.5126 0.96 |Q | | | V |
22+15 3.5191 0.95 |Q | | | V |
22+20 3.5256 0.94 |Q | | | V |
22+25 3.5321 0.94 |Q | | | V |
22+30 3.5385 0.93 |Q | | | V |
22+35 3.5448 0.92 |Q | | | V |
22+40 3.5511 0.92 |Q | | | V |
22+45 3.5574 0.91 |Q | | | V |
22+50 3.5636 0.90 |Q | | | V |
22+55 3.5698 0.90 |Q | | | V|
15
23+ 0 3.5760 0.89 |Q | | | V|
23+ 5 3.5821 0.89 |Q | | | V|
23+10 3.5881 0.88 |Q | | | V|
23+15 3.5941 0.87 |Q | | | V|
23+20 3.6001 0.87 |Q | | | V|
23+25 3.6061 0.86 |Q | | | V|
23+30 3.6120 0.86 |Q | | | V|
23+35 3.6178 0.85 |Q | | | V|
23+40 3.6237 0.85 |Q | | | V|
23+45 3.6295 0.84 |Q | | | V|
23+50 3.6352 0.84 |Q | | | V|
23+55 3.6410 0.83 |Q | | | V|
24+ 0 3.6466 0.83 |Q | | | V|
24+ 5 3.6519 0.77 |Q | | | V|
24+10 3.6552 0.48 Q | | | V|
24+15 3.6562 0.15 Q | | | V|
24+20 3.6565 0.04 Q | | | V|
24+25 3.6565 0.01 Q | | | V|
-----------------------------------------------------------------------
APPENDIX D: 96” CMP SUBSURFACE STORAGE SYSTEM
41660 IVY STREET, SUITE A
MURRIETA, CA 92562
PH. 951.304.9552 FAX 951.304.3568
Engineering & Consulting, Inc.
5 Barrell 96-Inch Subsurface Infiltration Basin Volume Calculations
Elevation
96" Pipe
Area
Each (ft2)
Pipe Area
Total (ft2)
96" Pipe
Total Gross
Volume at
Elev. (ft3)
Gross
Cross
Sectional
Area of
System (ft2)
Net Gravel
Area (ft2)
Gravel
Volume (ft3)
Cumulative
Subsurface
System Volume
(ft3)
Cumulative
Subsurface
System Volume
(ac-ft)
Cumulative
Subsurface
System Volume
above 1010.0
(ft3)
Subsurface
System
Volume
above 1010.0
(ac-ft)
1263 0 0 0 0 0 0 0 0 0 0.000
1263.5 0 0 0 26 26 2028 2028 0.0466 0.0000 0.000
1264 0 0 0 52 52 4056 4056 0.0931 0.0000 0.000
1264.5 1.31 6.55 1277.25 78 71.45 5573.1 6850.35 0.1573 0.0000 0.000
1265 3.63 18.15 3539.25 104 85.85 6696.3 10235.55 0.2350 0.0000 0.000
1265.5 6.52 32.6 6357 130 97.4 7597.2 13954.2 0.3203 0.0000 0.000
1266 9.83 49.15 9584.25 156 106.85 8334.3 17918.55 0.4114 0.0000 0.000
1266.5 13.42 67.1 13084.5 182 114.9 8962.2 22046.7 0.5061 0.00 0.000
1267 17.22 86.1 16789.5 208 121.9 9508.2 26297.7 0.6037 0.00 0.000
1267.5 21.14 105.7 20611.5 234 128.3 10007.4 30618.9 0.7029 0.00 0.000
1268 25.13 125.65 24501.75 260 134.35 10479.3 34981.05 0.8031 0.00 0.000
1268.5 29.12 145.6 28392 286 140.4 10951.2 39343.2 0.9032 4362.15 0.100
1269 33.05 165.25 32223.75 312 146.75 11446.5 43670.25 1.0025 8689.20 0.199
1269.5 36.85 184.25 35928.75 338 153.75 11992.5 47921.25 1.1001 12940.20 0.297
1270 40.44 202.2 39429 364 161.8 12620.4 52049.4 1.1949 17068.35 0.392
1270.5 43.74 218.7 42646.5 390 171.3 13361.4 56007.9 1.2858 21026.85 0.483
1271 46.64 233.2 45474 416 182.8 14258.4 59732.4 1.3713 24751.35 0.568
1271.5 48.96 244.8 47736 442 197.2 15381.6 63117.6 1.4490 28136.55 0.646
1272 50.27 251.35 49013.25 468 216.65 16898.7 65911.95 1.5131 30930.90 0.710
1272.5 50.27 0 0 494 242.65 18926.7 67939.95 1.5597 32958.90 0.757
1273 50.27 0 0 520 268.65 20954.7 69967.95 1.6062 34986.90 0.803
Storage Volume
Below
Orifice at 1269.0
43670.25 Cu. Ft.
LENGTH OF SUBSURFACE SYSTEM (FT) = 195
EXCERPTS
EXCERPT A: NRCS SOIL SURVEY HYDROLOGIC SOILS MAP
Hydrologic Soil Group—San Bernardino County Southwestern Part, California
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
4/6/2022
Page 1 of 4
37
7
3
9
0
0
37
7
4
0
0
0
37
7
4
1
0
0
37
7
4
2
0
0
37
7
4
3
0
0
37
7
4
4
0
0
37
7
4
5
0
0
37
7
4
6
0
0
37
7
4
7
0
0
37
7
4
8
0
0
37
7
4
9
0
0
37
7
3
8
0
0
37
7
3
9
0
0
37
7
4
0
0
0
37
7
4
1
0
0
37
7
4
2
0
0
37
7
4
3
0
0
37
7
4
4
0
0
37
7
4
5
0
0
37
7
4
6
0
0
37
7
4
7
0
0
37
7
4
8
0
0
37
7
4
9
0
0
455300 455400 455500 455600 455700 455800 455900 456000 456100 456200 456300 456400 456500 456600 456700 456800 456900 457000 457100 457200 457300
455300 455400 455500 455600 455700 455800 455900 456000 456100 456200 456300 456400 456500 456600 456700 456800 456900 457000 457100 457200 457300
34° 6' 52'' N
11
7
°
2
9
'
5
'
'
W
34° 6' 52'' N
11
7
°
2
7
'
4
3
'
'
W
34° 6' 14'' N
11
7
°
2
9
'
5
'
'
W
34° 6' 14'' N
11
7
°
2
7
'
4
3
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84
0 250 500 1000 1500
Feet
0 50 100 200 300
Meters
Map Scale: 1:5,660 if printed on B landscape (17" x 11") sheet.
Soil Map may not be valid at this scale.
PROJECT
SITE
HYDROLOGICAL
SOIL TYPE A
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
TvC Tujunga gravelly loamy
sand, 0 to 9 percent
slopes
A 233.5 100.0%
Totals for Area of Interest 233.5 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Hydrologic Soil Group—San Bernardino County Southwestern Part, California
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
4/6/2022
Page 3 of 4
EXCERPT B: NOAA ATLAS 14 RAINFALL
EXCERPT C INFILTRATION REPORT
22885 Savi Ranch Parkway Suite E Yorba Linda California 92887
voice: (714) 685-1115 fax: (714) 685-1118 www.socalgeo.com
December 8, 2021
AIREF ACQUISITIONS, LLC
4675 MacArthur Court, Suite 625
Newport Beach, California 92660
Attention: Mr. Peter F. Schafer
AVP, Development
Project No.: 21G260-2
Subject: Results of Infiltration Testing
Proposed Warehouse
Beech Avenue, North of Foothill Boulevard
Fontana, California
Reference: Geotechnical Investigation, Proposed Warehouse, Beech Avenue, North of
Foothill Boulevard, Fontana, California, prepared for AIREF ACQUISITIONS, LLC,
by Southern California Geotechnical, Inc. (SCG), SCG Project No. 21G260-1,
dated December 7, 2021.
Dear Mr. Schafer:
In accordance with your request, we have conducted additional infiltration testing at the subject
site. We are pleased to present this report summarizing the results of the infiltration testing and
our design recommendations.
Scope of Services
The scope of services performed for this project was in general accordance with our Proposal
No. 21P453R, dated October 19, 2021. The scope of services included site reconnaissance,
subsurface exploration, field testing, and engineering analysis to determine the infiltration rates
of the on-site soils. The infiltration testing was performed in general accordance with ASTM Test
Method D-3385-03, Standard Test Method for Infiltration Rate of Soils in Field Using Double
Ring Infiltrometer.
Site and Project Description
The site is located on the west side of Beech Avenue, 330± feet north of Foothill Boulevard in
Fontana, California. The site is bounded to the north by a vacant lot, to the west by an existing
commercial/industrial building and a vacant lot, to the south by a single-family residence and a
vacant lot, and to the east by the Beech Avenue easement. The general location of the site is
illustrated on the Site Location Map, included as Plate 1 of this report.
The site consists of an irregular-shaped parcel, 8.38± acres in size. The site is presently vacant
and undeveloped. Ground surface consists of exposed soil and cobbles with sparse grass and
weed growth. One large tree is located in the central area of the site.
Proposed Warehouse – Fontana, CA
Project No. 21G260-2 Page 2
Detailed topographic information was not available at the time of this report. Based on
elevations obtained from Google Earth and visual observations made at the time of the
subsurface investigation, the overall site generally slopes downward to the south at a gradient
of 1.5± percent.
Proposed Development
Based on a conceptual site plan provided to our office by the client, the site will be developed
with one (1) new industrial building, 185,380± ft2 in size, located in the west-central area of the
site. Dock-high doors will be constructed along a portion of the east building wall. The building
will be surrounded by asphaltic concrete pavements in the parking and drive lanes, Portland
cement concrete pavements in the loading dock areas, and limited areas of concrete flatwork
and landscape planters throughout. Beech Avenue will be paved with asphaltic concrete for this
new development.
The proposed development will include on-site stormwater infiltration systems. We understand
that the infiltration system will consist of a below-grade chamber system, located in the
southern and northern regions of the site. The bottom of the below-grade chamber system is
expected to be 10 to 12± feet below existing site grades.
Concurrent Study
Southern California Geotechnical, Inc. (SCG) concurrently conducted a geotechnical
investigation at the subject site, referenced above. As a part of this study, seven (7) borings
(identified as Boring Nos. B-1 through B-7) were advanced to depths of 5 to 25± feet below
existing site grades.
Native alluvium was encountered at the ground surface of all boring locations, extending to at
least the maximum depth explored of 25± feet below ground surface. The near-surface alluvial
soils, within the upper 2½ to 4½± feet, generally consist of medium dense to dense silty fine
sands and silty fine to coarse sands with varying cobble content. At depths greater than 4½±
feet, the alluvial soils generally consist of medium dense to very dense fine to coarse sands with
little fine to coarse gravel and occasional to abundant cobbles. Boring No. B-3 encountered
gravelly fine to coarse sands from the ground surface, extending to 15± feet below ground
surface.
Groundwater
Free water was not encountered during the drilling of any of the borings. Based on the lack of
any water within the borings, and the moisture contents of the recovered soil samples, the
static groundwater table is considered to have existed at a depth in excess of 25± feet at the
time of the subsurface exploration.
Recent water level data was obtained from the California Department of Water Resources
website, http://www.water.ca.gov/waterdatalibrary/. One monitoring well on record is located
5,121± feet north of the site. Water level readings within this monitoring well indicates a high
groundwater level of 492± feet below ground surface in April 2016.
Proposed Warehouse – Fontana, CA
Project No. 21G260-2 Page 3
Subsurface Exploration
Scope of Exploration
The subsurface exploration for the infiltration testing consisted of four (4) backhoe-excavated
trenches, extending to depths of 10 to 12± feet below existing site grades. The trenches were
logged during excavation by a member of our staff. The approximate locations of the infiltration
trenches (identified as I-1 through I-4) are indicated on the Infiltration Test Location Plan,
enclosed as Plate 2 of this report.
Geotechnical Conditions
Native alluvial soils were encountered at all of the trench locations, extending to the maximum
explored depth of 12± feet below existing site grades. The alluvial soils within the upper 1-foot
consists of medium dense silty sands. The alluvium encountered at greater depths consists of
dense to very dense gravelly fine to coarse sands, with varying amounts of silt and occasional
to extensive cobbles.
Infiltration Testing
We understand that the results of the testing will be used to prepare a preliminary design for
the storm water infiltration system that will be used at the subject site. As previously
mentioned, the infiltration testing was performed in general accordance with ASTM Test Method
D-3385-03, Standard Test Method for Infiltration Rate of Soils in Field Using Double Ring
Infiltrometer.
Two stainless steel infiltration rings were used for the infiltration testing. The outer infiltration
ring is 2 feet in diameter and 20 inches in height. The inner infiltration ring is 1 foot in diameter
and 20 inches in height. At the test locations, the outer ring was driven 3± inches into the soil
at the base of each trench. The inner ring was centered inside the outer ring and subsequently
driven 3± inches into the soil at the base of the trench. The rings were driven into the soil using
a ten-pound sledge hammer. The soil surrounding the wall of the infiltration rings was only
slightly disturbed during the driving process.
Infiltration Testing Procedure
Infiltration testing was performed at both of the trench locations. The infiltration testing
consisted of filling the inner ring and the annular space (the space between the inner and outer
rings) with water, approximately 3 to 4 inches above the soil. To prevent the flow of water from
one ring to the other, the water level in both the inner ring and the annular space between the
rings was maintained using constant-head float valves. The volume of water that was added to
maintain a constant head in the inner ring and the annular space during each time interval was
determined and recorded. A cap was placed over the rings to minimize the evaporation of water
during the tests.
The schedule for readings was determined based on the observed soil type at the base of each
backhoe-excavated trench. Based on the existing soils at the trench locations, the volumetric
measurements were made at 6-minute increments. The water volume measurements are
Proposed Warehouse – Fontana, CA
Project No. 21G260-2 Page 4
presented on the spreadsheets enclosed with this report. The infiltration rates for each of the
timed intervals are also tabulated on these spreadsheets.
The infiltration rates for the infiltration tests are calculated in centimeters per hour and then
converted to inches per hour. The rates are summarized below:
Infiltration
Test No.
Depth
(feet) Soil Description Infiltration Rate
(inches/hour)
I-1 12 Gray Brown Gravelly fine to coarse Sand, trace Silt 20.2
I-2 10 Light Brown Gravelly fine to coarse Sand 12.1
I-3 10 Gray Brown Gravelly fine to coarse Sand 22.4
I-4 10 Light Brown Gravelly fine to coarse Sand, trace Silt 21.3
Laboratory Testing
Moisture Content
The moisture contents for the recovered soil samples within the borings were determined in
accordance with ASTM D-2216 and are expressed as a percentage of the dry weight. These test
results are presented on the Trench Logs.
Grain Size Analysis
The grain size distribution of selected soils collected from the base of each infiltration test
boring have been determined using a range of wire mesh screens. These tests were performed
in general accordance with ASTM D-422 and/or ASTM D-1140. The weight of the portion of the
sample retained on each screen is recorded and the percentage finer or coarser of the total
weight is calculated. The results of these tests are presented on Plates C-1 through C-4 of this
report.
Design Recommendations
Four (4) infiltration tests were performed at the subject site. As noted above, the calculated
infiltration rates at the infiltration test locations range from 12.1 to 22.4 inches per hour. Based
on the results of infiltration testing, we recommend the following infiltration rate be
used for the design of the proposed infiltration system:
Infiltration
Test No.
Location Infiltration Rate
(Inches per Hour)
I-1 & I-2 Eastern System 12.1
I-3 & I-4 Southern Ssytem 21.3
Proposed Warehouse – Fontana, CA
Project No. 21G260-2 Page 5
We recommend that a representative from the geotechnical engineer be on-site during the
construction of the proposed infiltration system to identify the soil classification at the base of
the infiltration basin. It should be confirmed that the soils at the base of the proposed
infiltration system corresponds with those presented in this report to ensure that the
performance of the system will be consistent with the rates reported herein.
The design of the storm water infiltration system should be performed by the project civil
engineer, in accordance with the City of Fontana and/or County of San Bernardino guidelines. It
is recommended that the system be constructed so as to facilitate removal of silt and clay, or
other deleterious materials from any water that may enter the systems. The presence of such
materials would decrease the effective infiltration rates. It is recommended that the project
civil engineer apply an appropriate factor of safety. The infiltration rates
recommended above is based on the assumption that only clean water will be
introduced to the subsurface profile. Any fines, debris, or organic materials could
significantly impact the infiltration rate. It should be noted that the recommended
infiltration rates are based on infiltration testing at four (4) discrete locations and that the
overall infiltration rates of the proposed infiltration systems could vary considerably.
Infiltration Rate Considerations
The infiltration rates presented herein was determined in accordance with the San Bernardino
County guidelines and are considered valid only for the time and place of the actual test.
Varying subsurface conditions will exist in other areas of the site, which could alter the
recommended infiltration rates presented above. The infiltration rates will decline over time
between maintenance cycles as silt or clay particles accumulate on the BMP surface. The
infiltration rate is highly dependent upon a number of factors, including density, silt and clay
content, grainsize distribution throughout the range of particle sizes, and particle shape. Small
changes in these factors can cause large changes in the infiltration rates.
Infiltration rates are based on unsaturated flow. As water is introduced into soils by infiltration,
the soils become saturated and the wetting front advances from the unsaturated zone to the
saturated zone. Once the soils become saturated, infiltration rates become zero, and water can
only move through soils by hydraulic conductivity at a rate determined by pressure head and
soil permeability. Changes in soil moisture content will affect the infiltration rate. Infiltration
rates should be expected to decrease until the soils become saturated. Soil permeability values
will then govern groundwater movement. Permeability values may be on the order of 10 to 20
times less than infiltration rates. The system designer should incorporate adequate factors of
safety and allow for overflow design into appropriate traditional storm drain systems, which
would transport storm water off-site.
Construction Considerations
The infiltration rates presented in this report are specific to the tested locations and tested
depths. Infiltration rates can be significantly reduced if the soils are exposed to excessive
disturbance or compaction during construction. Compaction of the soils at the bottom of the
infiltration system can significantly reduce the infiltration ability of the basins. Therefore, the
subgrade soils within proposed infiltration system areas should not be over-excavated, undercut
Proposed Warehouse – Fontana, CA
Project No. 21G260-2 Page 6
or compacted in any significant manner. It is recommended that a note to this effect be
added to the project plans and/or specifications.
We recommend that a representative from the geotechnical engineer be on-site during the
construction of the proposed infiltration systems to identify the soil classification at the base of
each system. It should be confirmed that the soils at the base of the proposed infiltration
systems correspond with those presented in this report to ensure that the performance of the
systems will be consistent with the rates reported herein.
We recommend that scrapers and other rubber-tired heavy equipment not be operated on the
basin bottom, or at levels lower than 2 feet above the bottom of the system, particularly within
basins. As such, the bottom 24 inches of the infiltration systems should be excavated with non-
rubber-tired equipment, such as excavators.
Infiltration Chamber Maintenance
The proposed project may include infiltration chambers. Water flowing into these chambers will
carry some level of sediment. This layer has the potential to significantly reduce the infiltration
rate of the chamber subgrade soils. Therefore, a formal chamber maintenance program should
be established to ensure that these silt and clay deposits are removed from the chamber on a
regular basis.
Location of Infiltration Systems
The use of on-site storm water infiltration systems carries a risk of creating adverse
geotechnical conditions. Increasing the moisture content of the soil can cause the soil to lose
internal shear strength and increase its compressibility, resulting in a change in the designed
engineering properties. Overlying structures and pavements in the infiltration area could
potentially be damaged due to saturation of the subgrade soils. The proposed infiltration
systems for this site should be located at least 25 feet away from any structures,
including retaining walls. Even with this provision of locating the infiltration system at least
25 feet from the building(s), it is possible that infiltrating water into the subsurface soils could
have an adverse effect on the proposed or existing structures. It should also be noted that
utility trenches which happen to collect storm water can also serve as conduits to transmit
storm water toward the structure, depending on the slope of the utility trench. Therefore,
consideration should also be given to the proposed locations of underground utilities which may
pass near the proposed infiltration system.
The infiltration system designer should also give special consideration to the effect
that the proposed infiltration systems may have on nearby subterranean structures,
open excavations, or descending slopes. In particular, infiltration systems should
not be located near the crest of descending slopes, particularly where the slopes are
comprised of granular soils. Such systems will require specialized design and analysis to
evaluate the potential for slope instability, piping failures and other phenomena that typically
apply to earthen dam design. This type of analysis is beyond the scope of this infiltration test
report, but these factors should be considered by the infiltration system designer when locating
the infiltration systems.
Proposed Warehouse – Fontana, CA
Project No. 21G260-2 Page 7
General Comments
This report has been prepared as an instrument of service for use by the client in order to aid in
the evaluation of this property and to assist the architects and engineers in the design and
preparation of the project plans and specifications. This report may be provided to the
contractor(s) and other design consultants to disclose information relative to the project.
However, this report is not intended to be utilized as a specification in and of itself, without
appropriate interpretation by the project architect, structural engineer, and/or civil engineer.
The design of the infiltration system is the responsibility of the civil engineer. The role of the
geotechnical engineer is limited to determination of infiltration rate only. By using the design
infiltration rates contained herein, the civil engineer agrees to indemnify, defend, and hold
harmless the geotechnical engineer for all aspects of the design and performance of the
infiltration system. The reproduction and distribution of this report must be authorized by the
client and Southern California Geotechnical, Inc. Furthermore, any reliance on this report by an
unauthorized third party is at such party’s sole risk, and we accept no responsibility for damage
or loss which may occur. The analysis of this site was based on a subsurface profile interpolated
from limited discrete soil samples. While the materials encountered in the project area are
considered to be representative of the total area, some variations should be expected between
boring locations and testing depths. If the conditions encountered during construction vary
significantly from those detailed herein, we should be contacted immediately to determine if the
conditions alter the recommendations contained herein.
This report has been based on assumed or provided characteristics of the proposed
development. It is recommended that the owner, client, architect, structural engineer, and civil
engineer carefully review these assumptions to ensure that they are consistent with the
characteristics of the proposed development. If discrepancies exist, they should be brought to
our attention to verify that they do not affect the conclusions and recommendations contained
herein. We also recommend that the project plans and specifications be submitted to our office
for review to verify that our recommendations have been correctly interpreted. The analysis,
conclusions, and recommendations contained within this report have been promulgated in
accordance with generally accepted professional geotechnical engineering practice. No other
warranty is implied or expressed.
Closure
We sincerely appreciate the opportunity to be of service on this project. We look forward to
providing additional consulting services during the course of the project. If we may be of
further assistance in any manner, please contact our office.
Proposed Warehouse – Fontana, CA
Project No. 21G260-2 Page 8
Respectfully Submitted,
SOUTHERN CALIFORNIA GEOTECHNICAL, INC.
Ricardo Frias, RCE 91772
Project Engineer
Robert G. Trazo, GE 2655
Principal Engineer
Distribution: (1) Addressee
Enclosures: Plate 1 - Site Location Map
Plate 2 - Infiltration Test Location Plan
Trench Log Legend and Logs (6 pages)
Infiltration Test Results Spreadsheets (4 pages)
Grain Size Distribution Graphs (4 pages)
S
I
T
E
PROPOSED WAREHOUSE
SCALE: 1" = 2000'
DRAWN: MD
CHKD: RGT
SCG PROJECT
21G260-2
PLATE 1
SITE LOCATION MAP
FONTANA, CALIFORNIA
SOURCE: USGS TOPOGRAPHIC MAP OF THE FONTANA
QUADRANGLE, SAN BERNARDINO COUNTY, CALIFORNIA, 2018.
B-1
B-2
B-3
B-4 B-5
B-6
B-7
FU
T
U
R
E
B
E
E
C
H
A
V
E
N
U
E
I-1
I-2
I-3I-4
PROPERTY LINE
SCALE: 1" = 80'
DRAWN: MD
CHKD: RGT
PLATE 2
SCG PROJECT
21G260-2
FONTANA, CALIFORNIA
PROPOSED WAREHOUSE
INFILTRATION TEST LOCATION PLAN
NO
R
T
H
So
C
a
l
G
e
o
APPROXIMATE INFILTRATION
APPROXIMATE BORING LOCATION
GEOTECHNICAL LEGEND
NOTE: SITE PLAN PREPARED BY HPA ARCHITECTURE.
AERIAL PHOTO OBTAINED FROM GOOGLE EARTH.
TEST LOCATION
FROM CONCURRENT STUDY (SCG
PROJECT NO. 21G260-1)
APPROXIMATE UNDERGROUND
CHAMBER SYSTEM LOCATION
TRENCH LOG LEGEND
SAMPLE TYPE GRAPHICAL
SYMBOL SAMPLE DESCRIPTION
AUGER SAMPLE COLLECTED FROM AUGER CUTTINGS, NO FIELD
MEASUREMENT OF SOIL STRENGTH. (DISTURBED)
CORE ROCK CORE SAMPLE: TYPICALLY TAKEN WITH A DIAMOND-TIPPED CORE BARREL. TYPICALLY USED
ONLY IN HIGHLY CONSOLIDATED BEDROCK.
GRAB
SOIL SAMPLE TAKEN WITH NO SPECIALIZED
EQUIPMENT, SUCH AS FROM A STOCKPILE OR THE GROUND SURFACE. (DISTURBED)
CS CALIFORNIA SAMPLER: 2-1/2 INCH I.D. SPLIT BARREL SAMPLER, LINED WITH 1-INCH HIGH BRASS RINGS.
DRIVEN WITH SPT HAMMER. (RELATIVELY UNDISTURBED)
NSR
NO RECOVERY: THE SAMPLING ATTEMPT DID NOT RESULT IN RECOVERY OF ANY SIGNIFICANT SOIL OR
ROCK MATERIAL.
SPT STANDARD PENETRATION TEST: SAMPLER IS A 1.4 INCH INSIDE DIAMETER SPLIT BARREL, DRIVEN 18
INCHES WITH THE SPT HAMMER. (DISTURBED)
SH SHELBY TUBE: TAKEN WITH A THIN WALL SAMPLE
TUBE, PUSHED INTO THE SOIL AND THEN EXTRACTED. (UNDISTURBED)
VANE VANE SHEAR TEST: SOIL STRENGTH OBTAINED USING
A 4 BLADED SHEAR DEVICE. TYPICALLY USED IN SOFT CLAYS-NO SAMPLE RECOVERED.
COLUMN DESCRIPTIONS
DEPTH: Distance in feet below the ground surface.
SAMPLE: Sample Type as depicted above.
BLOW COUNT: Number of blows required to advance the sampler 12 inches using a 140 lb
hammer with a 30-inch drop. 50/3” indicates penetration refusal (>50 blows)
at 3 inches. WH indicates that the weight of the hammer was sufficient to
push the sampler 6 inches or more.
POCKET PEN.: Approximate shear strength of a cohesive soil sample as measured by pocket
penetrometer.
GRAPHIC LOG: Graphic Soil Symbol as depicted on the following page.
DRY DENSITY: Dry density of an undisturbed or relatively undisturbed sample in lbs/ft3.
MOISTURE CONTENT: Moisture content of a soil sample, expressed as a percentage of the dry weight.
LIQUID LIMIT: The moisture content above which a soil behaves as a liquid.
PLASTIC LIMIT: The moisture content above which a soil behaves as a plastic.
PASSING #200 SIEVE: The percentage of the sample finer than the #200 standard sieve.
UNCONFINED SHEAR: The shear strength of a cohesive soil sample, as measured in the unconfined state.
SM
SP
COARSE
GRAINEDSOILS
SW
TYPICAL
DESCRIPTIONS
WELL-GRADED GRAVELS, GRAVEL -
SAND MIXTURES, LITTLE OR NOFINES
SILTY GRAVELS, GRAVEL - SAND -
SILT MIXTURES
LETTERGRAPH
POORLY-GRADED GRAVELS,
GRAVEL - SAND MIXTURES, LITTLEOR NO FINES
GC
GM
GP
GW
POORLY-GRADED SANDS,
GRAVELLY SAND, LITTLE OR NOFINES
SILTSAND
CLAYS
MORE THAN 50%
OF MATERIAL ISLARGER THANNO. 200 SIEVE
SIZE
MORE THAN 50%OF MATERIAL IS
SMALLER THANNO. 200 SIEVESIZE
MORE THAN 50%OF COARSEFRACTION
PASSING ON NO.4 SIEVE
MORE THAN 50%OF COARSE
FRACTIONRETAINED ON NO.4 SIEVE CLAYEY GRAVELS, GRAVEL - SAND -
CLAY MIXTURES
FINEGRAINED
SOILS
SYMBOLSMAJOR DIVISIONS
SOIL CLASSIFICATION CHART
PT
OH
CH
MH
OL
CL
ML
CLEAN SANDS
SC
SILTY SANDS, SAND - SILTMIXTURES
CLAYEY SANDS, SAND - CLAY
MIXTURES
INORGANIC SILTS AND VERY FINESANDS, ROCK FLOUR, SILTY OR
CLAYEY FINE SANDS OR CLAYEYSILTS WITH SLIGHT PLASTICITY
INORGANIC CLAYS OF LOW TO
MEDIUM PLASTICITY, GRAVELLYCLAYS, SANDY CLAYS, SILTY CLAYS,LEAN CLAYS
ORGANIC SILTS AND ORGANICSILTY CLAYS OF LOW PLASTICITY
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS FINE SAND ORSILTY SOILS
INORGANIC CLAYS OF HIGH
PLASTICITY
ORGANIC CLAYS OF MEDIUM TO
HIGH PLASTICITY, ORGANIC SILTS
PEAT, HUMUS, SWAMP SOILS WITHHIGH ORGANIC CONTENTS
SILTS
AND
CLAYS
GRAVELS WITH
FINES
SAND
AND
SANDY
SOILS (LITTLE OR NO FINES)
SANDS WITH
FINES
LIQUID LIMITLESS THAN 50
LIQUID LIMIT
GREATER THAN 50
HIGHLY ORGANIC SOILS
NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS
GRAVEL
AND
GRAVELLYSOILS
(APPRECIABLE
AMOUNT OF FINES)
(APPRECIABLE
AMOUNT OF FINES)
(LITTLE OR NO FINES)
WELL-GRADED SANDS, GRAVELLYSANDS, LITTLE OR NO FINES
CLEAN
GRAVELS
2
ALLUVIUM: Light Brown Silty fine to coarse Sand, little fineGravel, trace fine root fibers, medium dense-dry
Gray Brown Gravelly fine to coarse Sand, trace Silt, occasional toextensive Cobbles, dense to very dense-dry to damp
Trench Terminated at 12'
4
SURFACE ELEVATION: --- MSL LI
Q
U
I
D
LI
M
I
T
PL
A
S
T
I
C
LI
M
I
T
SA
M
P
L
E
FIELD RESULTS
WATER DEPTH: Dry
CAVE DEPTH: 12 feet
READING TAKEN: At Completion
DR
Y
D
E
N
S
I
T
Y
(P
C
F
)
OR
G
A
N
I
C
CO
N
T
E
N
T
(
%
)
LABORATORY RESULTS
PA
S
S
I
N
G
#2
0
0
S
I
E
V
E
(
%
)
BL
O
W
C
O
U
N
T
DESCRIPTION
DE
P
T
H
(
F
E
E
T
)
MO
I
S
T
U
R
E
CO
N
T
E
N
T
(
%
)
TRENCH NO.
I-1
TEST TRENCH LOG
CO
M
M
E
N
T
S
EXCAVATION DATE: 11/9/21
EXCAVATION METHOD: Backhoe
LOGGED BY: Caleb Brackett
JOB NO.: 21G260-2
PROJECT: Proposed Warehouse
LOCATION: Fontana, California
PLATE B-1
5
10
GR
A
P
H
I
C
L
O
G
PO
C
K
E
T
P
E
N
.
(T
S
F
)
TB
L
2
1
G
2
6
0
-
2
.
G
P
J
S
O
C
A
L
G
E
O
.
G
D
T
1
2
/
8
/
2
1
1
ALLUVIUM: Light Brown Silty fine to coarse Sand, trace fine tocoarse Gravel, medium dense-dry
Light Brown Gravelly fine to coarse Sand, extensive Cobbles,dense to very dense-dry
Trench Terminated at 10'
1
SURFACE ELEVATION: --- MSL LI
Q
U
I
D
LI
M
I
T
PL
A
S
T
I
C
LI
M
I
T
SA
M
P
L
E
FIELD RESULTS
WATER DEPTH: Dry
CAVE DEPTH: 10 feet
READING TAKEN: At Completion
DR
Y
D
E
N
S
I
T
Y
(P
C
F
)
OR
G
A
N
I
C
CO
N
T
E
N
T
(
%
)
LABORATORY RESULTS
PA
S
S
I
N
G
#2
0
0
S
I
E
V
E
(
%
)
BL
O
W
C
O
U
N
T
DESCRIPTION
DE
P
T
H
(
F
E
E
T
)
MO
I
S
T
U
R
E
CO
N
T
E
N
T
(
%
)
TRENCH NO.
I-2
TEST TRENCH LOG
CO
M
M
E
N
T
S
EXCAVATION DATE: 11/9/21
EXCAVATION METHOD: Backhoe
LOGGED BY: Caleb Brackett
JOB NO.: 21G260-2
PROJECT: Proposed Warehouse
LOCATION: Fontana, California
PLATE B-2
5
10
GR
A
P
H
I
C
L
O
G
PO
C
K
E
T
P
E
N
.
(T
S
F
)
TB
L
2
1
G
2
6
0
-
2
.
G
P
J
S
O
C
A
L
G
E
O
.
G
D
T
1
2
/
8
/
2
1
1
ALLUVIUM: Light Brown Silty fine to medium Sand, little coarseSand, trace fine Gravel, trace fine root fibers, medium dense-dry
Light Brown Gravelly fine to medium Sand, trace Silt, occasionalCobbles, dense-dry
Gray Brown Gravelly fine to coarse Sand, occasional to extensiveCobbles, dense to very dense-dry
Trench Terminated at 10'
1
SURFACE ELEVATION: --- MSL LI
Q
U
I
D
LI
M
I
T
PL
A
S
T
I
C
LI
M
I
T
SA
M
P
L
E
FIELD RESULTS
WATER DEPTH: Dry
CAVE DEPTH: 10 feet
READING TAKEN: At Completion
DR
Y
D
E
N
S
I
T
Y
(P
C
F
)
OR
G
A
N
I
C
CO
N
T
E
N
T
(
%
)
LABORATORY RESULTS
PA
S
S
I
N
G
#2
0
0
S
I
E
V
E
(
%
)
BL
O
W
C
O
U
N
T
DESCRIPTION
DE
P
T
H
(
F
E
E
T
)
MO
I
S
T
U
R
E
CO
N
T
E
N
T
(
%
)
TRENCH NO.
I-3
TEST TRENCH LOG
CO
M
M
E
N
T
S
EXCAVATION DATE: 11/9/21
EXCAVATION METHOD: Backhoe
LOGGED BY: Caleb Brackett
JOB NO.: 21G260-2
PROJECT: Proposed Warehouse
LOCATION: Fontana, California
PLATE B-3
5
10
GR
A
P
H
I
C
L
O
G
PO
C
K
E
T
P
E
N
.
(T
S
F
)
TB
L
2
1
G
2
6
0
-
2
.
G
P
J
S
O
C
A
L
G
E
O
.
G
D
T
1
2
/
8
/
2
1
3
ALLUVIUM: Light Brown Silty fine to coarse Sand, trace fineGravel, trace fine root fibers, medium dense-dry
Light Brown Gravelly fine to coarse Sand, trace Silt, extensiveCobbles, dense to very dense-dry to damp
Trench Terminated at 10'
3
SURFACE ELEVATION: --- MSL LI
Q
U
I
D
LI
M
I
T
PL
A
S
T
I
C
LI
M
I
T
SA
M
P
L
E
FIELD RESULTS
WATER DEPTH: Dry
CAVE DEPTH: 10 feet
READING TAKEN: At Completion
DR
Y
D
E
N
S
I
T
Y
(P
C
F
)
OR
G
A
N
I
C
CO
N
T
E
N
T
(
%
)
LABORATORY RESULTS
PA
S
S
I
N
G
#2
0
0
S
I
E
V
E
(
%
)
BL
O
W
C
O
U
N
T
DESCRIPTION
DE
P
T
H
(
F
E
E
T
)
MO
I
S
T
U
R
E
CO
N
T
E
N
T
(
%
)
TRENCH NO.
I-4
TEST TRENCH LOG
CO
M
M
E
N
T
S
EXCAVATION DATE: 11/9/21
EXCAVATION METHOD: Backhoe
LOGGED BY: Caleb Brackett
JOB NO.: 21G260-2
PROJECT: Proposed Warehouse
LOCATION: Fontana, California
PLATE B-4
5
10
GR
A
P
H
I
C
L
O
G
PO
C
K
E
T
P
E
N
.
(T
S
F
)
TB
L
2
1
G
2
6
0
-
2
.
G
P
J
S
O
C
A
L
G
E
O
.
G
D
T
1
2
/
8
/
2
1
INFILTRATION CALCULATIONS
Project Name Proposed Warehouse
Project Location
Project Number
Engineer
Infiltration Test No I-1
Constants
Diameter
(ft)
Area
(ft2)
Area
(cm2)
Inner 1 0.79 730 *Note: The infiltration rate was calculated
Anlr. Space 2 2.36 2189 based on current time interval
Interval
Elapsed
Inner
Ring
Ring
Flow
Annular
Ring
Space
Flow
Inner
Ring*
Annular
Space*
Inner
Ring*
Annular
Space*
(min) (ml)(cm3)(ml)(cm3)(cm/hr) (cm/hr) (in/hr) (in/hr)
Initial 7:10 AM 6 0 0
Final 7:16 AM 6 7000 24000
Initial 7:16 AM 6 0 0
Final 7:22 AM 12 6000 26000
Initial 7:22 AM 6 0 0
Final 7:28 AM 18 5500 24000
Initial 7:28 AM 6 0 0
Final 7:34 AM 24 4750 23000
Initial 7:34 AM 6 0 0
Final 7:40 AM 30 4250 22000
Initial 7:40 AM 6 0 0
Final 7:46 AM 36 4000 22000
Initial 7:46 AM 6 0 0
Final 7:52 AM 42 3750 22000
Initial 7:52 AM 6 0 0
Final 7:58 AM 48 3750 22000
Initial 7:58 AM 6 0 0
Final 8:04 AM 54 3750 22000
Initial 8:04 AM 6 0 0
Final 8:10 AM 60 3750 22000
39.57
39.57
20.23 39.57
20.23
51.40 100.51 39.57
51.40 100.51
3750 22000
3750 22000 51.40 100.51
4000 22000 54.82 100.51
3750 22000 51.40 100.51
8
9
39.57
10
20.23
20.23
3750 22000
6
7
43.17
2 6000 26000
21.58
118.78 32.38 46.76
1 7000
Flow Readings Infiltration Rates
Test
Interval Time (hr)
41.37
3 5500 24000 75.38
109.64 37.7724000 95.94
109.64
39.575425022000 58.25
43.17
4 4750 23000 65.10
21G260-2
Fontana, CA
Caleb Brackett
100.51 22.93
105.08 25.63
29.68
82.23
21G260-2 Infiltration Test No. I-1
INFILTRATION CALCULATIONS
Project Name Proposed Warehouse
Project Location
Project Number
Engineer
Infiltration Test No I-2
Constants
Diameter
(ft)
Area
(ft2)
Area
(cm2)
Inner 1 0.79 730 *Note: The infiltration rate was calculated
Anlr. Space 2 2.36 2189 based on current time interval
Interval
Elapsed
Inner
Ring
Ring
Flow
Annular
Ring
Space
Flow
Inner
Ring*
Annular
Space*
Inner
Ring*
Annular
Space*
(min) (ml)(cm3)(ml)(cm3)(cm/hr) (cm/hr) (in/hr) (in/hr)
Initial 8:30 AM 6 0 0
Final 8:36 AM 6 3500 11500
Initial 8:36 AM 6 0 0
Final 8:42 AM 12 3000 10000
Initial 8:42 AM 6 0 0
Final 8:48 AM 18 3000 9700
Initial 8:48 AM 6 0 0
Final 8:54 AM 24 2800 9400
Initial 8:54 AM 6 0 0
Final 9:00 AM 30 2600 9300
Initial 9:00 AM 6 0 0
Final 9:06 AM 36 2400 9400
Initial 9:06 AM 6 0 0
Final 9:12 AM 42 2250 9500
Initial 9:12 AM 6 0 0
Final 9:18 AM 48 2250 9400
Initial 9:18 AM 6 0 0
Final 9:24 AM 54 2250 9500
Initial 9:24 AM 6 0 0
Final 9:30 AM 60 2250 9500
17.09
10 2250 9500 30.84 43.40 12.14 17.09
9 2250 9500 30.84 43.40 12.14
17.09
8 2250 9400 30.84 42.94 12.14 16.91
7 2250 9500 30.84 43.40 12.14
16.73
6 2400 9400 32.89 42.94 12.95 16.91
5 2600 9300 35.63 42.49 14.03
17.45
4 2800 9400 38.38 42.94 15.11 16.91
3 3000 9700 41.12 44.31 16.19
20.68
2 3000 10000 41.12 45.68 16.19 17.99
1 3500 11500 47.97 52.54 18.89
Fontana, CA
21G260-2
Caleb Brackett
Flow Readings Infiltration Rates
Test
Interval Time (hr)
21G260-2 Infiltration Test No. I-2
INFILTRATION CALCULATIONS
Project Name Proposed Warehouse
Project Location
Project Number
Engineer
Infiltration Test No I-3
Constants
Diameter
(ft)
Area
(ft2)
Area
(cm2)
Inner 1 0.79 730 *Note: The infiltration rate was calculated
Anlr. Space 2 2.36 2189 based on current time interval
Interval
Elapsed
Inner
Ring
Ring
Flow
Annular
Ring
Space
Flow
Inner
Ring*
Annular
Space*
Inner
Ring*
Annular
Space*
(min) (ml)(cm3)(ml)(cm3)(cm/hr) (cm/hr) (in/hr) (in/hr)
Initial 9:45 AM 6 0 0
Final 9:51 AM 6 5000 20000
Initial 9:51 AM 6 0 0
Final 9:57 AM 12 5000 20000
Initial 9:57 AM 6 0 0
Final 10:03 AM 18 4850 20000
Initial 10:03 AM 6 0 0
Final 10:09 AM 24 4700 18500
Initial 10:09 AM 6 0 0
Final 10:15 AM 30 4600 18500
Initial 10:15 AM 6 0 0
Final 10:21 AM 36 4400 18500
Initial 10:21 AM 6 0 0
Final 10:27 AM 42 4150 17000
Initial 10:27 AM 6 0 0
Final 10:33 AM 48 4150 17000
Initial 10:33 AM 6 0 0
Final 10:39 AM 54 4150 17000
Initial 10:39 AM 6 0 0
Final 10:45 AM 60 4150 17000
30.58
10 4150 17000 56.88 77.66 22.39 30.58
9 4150 17000 56.88 77.66 22.39
30.58
8 4150 17000 56.88 77.66 22.39 30.58
7 4150 17000 56.88 77.66 22.39
33.27
6 4400 18500 60.30 84.52 23.74 33.27
5 4600 18500 63.05 84.52 24.82
35.97
4 4700 18500 64.42 84.52 25.36 33.27
3 4850 20000 66.47 91.37 26.17
35.97
2 5000 20000 68.53 91.37 26.98 35.97
1 5000 20000 68.53 91.37 26.98
Fontana, CA
21G260-2
Caleb Brackett
Flow Readings Infiltration Rates
Test
Interval Time (hr)
21G260-2 Infiltration Test No. I-3
INFILTRATION CALCULATIONS
Project Name Proposed Warehouse
Project Location
Project Number
Engineer
Infiltration Test No I-4
Constants
Diameter
(ft)
Area
(ft2)
Area
(cm2)
Inner 1 0.79 730 *Note: The infiltration rate was calculated
Anlr. Space 2 2.36 2189 based on current time interval
Interval
Elapsed
Inner
Ring
Ring
Flow
Annular
Ring
Space
Flow
Inner
Ring*
Annular
Space*
Inner
Ring*
Annular
Space*
(min) (ml)(cm3)(ml)(cm3)(cm/hr) (cm/hr) (in/hr) (in/hr)
Initial 11:30 AM 6 0 0
Final 11:36 AM 6 4850 20000
Initial 11:36 AM 6 0 0
Final 11:42 AM 12 4850 20000
Initial 11:42 AM 6 0 0
Final 11:48 AM 18 4600 20000
Initial 11:48 AM 6 0 0
Final 11:54 AM 24 4500 20000
Initial 11:54 AM 6 0 0
Final 12:00 PM 30 4250 19200
Initial 12:00 PM 6 0 0
Final 12:06 PM 36 4200 18000
Initial 12:06 PM 6 0 0
Final 12:12 PM 42 3950 16000
Initial 12:12 PM 6 0 0
Final 12:18 PM 48 3950 16000
Initial 12:18 PM 6 0 0
Final 12:24 PM 54 3950 15000
Initial 12:24 PM 6 0 0
Final 12:30 PM 60 3950 15000
26.98
10 3950 15000 54.14 68.53 21.31 26.98
9 3950 15000 54.14 68.53 21.31
28.78
8 3950 16000 54.14 73.10 21.31 28.78
7 3950 16000 54.14 73.10 21.31
34.53
6 4200 18000 57.56 82.23 22.66 32.38
5 4250 19200 58.25 87.72 22.93
35.97
4 4500 20000 61.67 91.37 24.28 35.97
3 4600 20000 63.05 91.37 24.82
35.97
2 4850 20000 66.47 91.37 26.17 35.97
1 4850 20000 66.47 91.37 26.17
Fontana, CA
21G260-2
Caleb Brackett
Flow Readings Infiltration Rates
Test
Interval Time (hr)
21G260-2 Infiltration Test No. I-4
Sample Description I-1 @ 12'
Soil Classification Gray Brown Gravelly fine to coarse Sand, trace Silt
Proposed Warehouse
Fontana, California
Project No. 21G260-2
PLATE C- 1
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100
Percent
Passing
by
Weight
Grain Size in Millimeters
Grain Size Distribution
Sieve Analysis Hydrometer Analysis
US Standard Sieve Sizes
Coarse Gravel Fine Gravel Crs. Sand Med. Sand Fine Sand Fines (Silt and Clay)
2 1 3/4 1/2 3/8 1/4 #4 #8 #10 #16 #20 #30 #40 #50 #100 #200
Sample Description I-2 @ 10'
Soil Classification Light Brown Gravelly fine to coarse Sand
Proposed Warehouse
Fontana, California
Project No. 21G260-2
PLATE C- 2
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100
Percent
Passing
by
Weight
Grain Size in Millimeters
Grain Size Distribution
Sieve Analysis Hydrometer Analysis
US Standard Sieve Sizes
Coarse Gravel Fine Gravel Crs. Sand Med. Sand Fine Sand Fines (Silt and Clay)
2 1 3/4 1/2 3/8 1/4 #4 #8 #10 #16 #20 #30 #40 #50 #100 #200
Sample Description I-3 @ 10'
Soil Classification Gray Brown Gravelly fine to coarse Sand
Proposed Warehouse
Fontana, California
Project No. 21G260-2
PLATE C- 3
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100
Percent
Passing
by
Weight
Grain Size in Millimeters
Grain Size Distribution
Sieve Analysis Hydrometer Analysis
US Standard Sieve Sizes
Coarse Gravel Fine Gravel Crs. Sand Med. Sand Fine Sand Fines (Silt and Clay)
2 1 3/4 1/2 3/8 1/4 #4 #8 #10 #16 #20 #30 #40 #50 #100 #200
Sample Description I-4 @ 10'
Soil Classification Light Brown Gravelly fine to coarse Sand, trace Silt
Proposed Warehouse
Fontana, California
Project No. 21G260-2
PLATE C- 4
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100
Percent
Passing
by
Weight
Grain Size in Millimeters
Grain Size Distribution
Sieve Analysis Hydrometer Analysis
US Standard Sieve Sizes
Coarse Gravel Fine Gravel Crs. Sand Med. Sand Fine Sand Fines (Silt and Clay)
2 1 3/4 1/2 3/8 1/4 #4 #8 #10 #16 #20 #30 #40 #50 #100 #200
EXCERPT D PRELIMINARY FOOTHILL REGIONAL STORM DRAIN
m
1 4 t.
Re. 0igiona-f. -St
Fl 'li 'A" Base nea -qq- 6. 06 1 ve
ClT--Y!OF--FONT,,,,,A6NA
D.. y
Tanuary-24,2065
zi L'' .* ar-
s
r-
Aference (661-1677)
PkEPARED,P' A
Madole & AssoclAtes, Inc.
J.10601Y,-C- hurclli,Stmoti- Suite107
Rancho Cuoamwlta!'! CA 91730
909) 948 1311.
l.
Ifax 448-94,64
Aarori'T. Sie"er's Ddte
R.C.E. 62183 - Exp. 98.0/05
CONTENTS
SECTION TITLE
A DISCUSSION
Vicinity Map
o Q Q25INT HYDROLOGY
Q25 HYDROLOGY
Q100 HYDROLOGY
H STORM DRAIN HYDRA ULICS
Proposed Line A from Hemlock to Sultana
Modell Hydraulics
o R REFERENCES & MAPS
Soils Map (from San Bernardino County Hydrology Manual)
Isohyetal Maps (from San Bernardino County Hydrology Manual)
Half Scale Plans
Model 1 Hydraulic Exhibit
Hydrology Map Ultimate
o Hydrology Map Interim
Conceptual Storm Drain Plans
o Foothill Blvd Storm Drain Record Drawing
N
DISCUSSION
Purpose
The purpose of this drainage study is to determine the drainage facility requirements for the
interim and ultimate storm drain along Miller Ave., Beech Ave., Sultana Ave., and Foothill
Blvd. Specifically, the subject area is located south of Baseline Ave., west of Almeria Ave,
north of Foothill Blvd., and east of Hemlock Ave, in the City Fontana, County of San
Bernardino, California.
Interim Condition
In the interim stage, a temporary 66" storm drain will be installed connecting the storm drain
system east of Hemlock Avenue with the system west of Hemlock Avenue along Foothill
Blvd. A hydraulic model was prepared for the interim drainage to determine the effect on
the existing 72" RCP along Foothill Blvd. west of Hemlock Ave after the interim flow was
added. However, this model does not directly add the existing design flow with the interim
flow, since the existing design accounts for full development, which will not be the case in
the interim condition. This model assumes half the tributary area to the existing line will be
developed, therefore reducing the existing flow from 284 cfs to 192 cfs. The total flow will
be 192 cfs plus the additional 206 cfs or 398 cfs.
The above referenced model covers a portion of the existing 72" line (stations 95+64 to
101+67) that appeared to be critical since the hydraulic grade line is shown to be near the
existing ground. However, our analysis shows that even with the added interim flow, the
HGL will remain under the existing ground elevation during a 25 -year storm event.
Madole and Associates recommends that all existing detention basins remain in operation
until the ultimate storm drain design is completed.
Ultimate Condition
The ultimate watershed will consist of mainly single-family residences on approximately
382 acres. The ultimate drainage facilities will consist of reinfored concrete boxes and pipes
along Hemlock Avenue, Foothill Boulevard, Sultana Avenue and Miller Avenue with local
lines connecting from Beech Avenue and Lime Avenue. The ultimate storm improvements
will be installed with the interim system, with the exception of the 90 -inch storm drain along
Hemlock Avenue south of Foothill Avenue. The 90 -inch storm drain will be installed later
to complete the ultimate design. When this occurs, the temporary 66" storm drain line will
be removed. The ultimate storm drain facilities will accommodate the developed 100 -year
flow consisting of 757 cfs. Altough, the facilities will be under pressure, all catch basins are
expected to have at least 6 -inches of freeboard.
The rational method hydrologic model, as defined by Flood Control for San Bernardino
County, was followed in the determination of storm runoff. AES software was utilized for
hydrology calculations. CivilDesign's WSPGW hydraulic software program was used to
validate pipe sizes.
01/23/03
25 INTERIM HYDROLOGY
QINT25-1
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: 1986 ORANGE COUNTY HYDROLOGY CRITERION)
c) Copyright 1983-2002 Advanced Engineering Software (aes)
Ver. 8.0 Release Date: 01/01/2002 License ID 1251
Analysis prepared by:
MADOLE & ASSOCIATES
10601 CHURCH STREET, SUITE 107
RANCHO CUCAMONGA, CA 91730
DESCRIPTION OF STUDY **************************
Q25 INTERIM HYDROLOGY
FILE NAME: P:\661-1677\Drainage\MSD-INT.DAT
TIME/DATE OF STUDY: 17:20 01/17/2003
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
TIME-OF-CONCENTRATION MODEL* --
USER SPECIFIED STORM EVENT(YEAR) = 25.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00
rrSPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95
USER -DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL*
10 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 0.980
100 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 1.470
COMPUTED RAINFALL INTENSITY DATA:
STORM EVENT = 25.00 1 -HOUR INTENSITY(INCH/HOUR) = 1.1520
SLOPE OF INTENSITY DURATION CURVE = 0.6000
ANTECEDENT MOISTURE CONDITION (AMC) II ASSUMED FOR RATIONAL METHOD*
USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL*
HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING
WIDTH CROSSFALL IN- / OUT -/PARK- HEIGHT WIDTH LIP HIKE FACTOR
NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
1 22.0 11.0 0.020/0.920/0.020 0.67 1.50 0.0312 0.167 0.0150
GLOBAL STREET FLOW -DEPTH CONSTRAINTS:
1. Relative Flow -Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top -of -Curb)
2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED
k*********************************
FLOW PROCESS FROM NODE 20.00 TO NODE 21.00 IS CODE = 21
01 /23/03 QINT25-2
RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<<
INITIAL SUBAREA FLOW-LENGTH(FEET) = 930.00
ELEVATION DATA: UPSTREAM(FEET) = 1375.00 DOWNSTREAM(FEET) = 1358.00
Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 13.334
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.84.0
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp
LAND USE GROUP (ACRES) (INCH/HR)
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 10.00 0.40
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) _
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA RUNOFF(CFS) = 23.76
TOTAL AREA(ACRES) = 10.00 PEAK FLOW RATE(CFS)
Ap SCS Tc
DECIMAL) CN (MIN.)
0.40
0.50 32 13.33
23.76
FLOW PROCESS FROM NODE 21.00 TO NODE 22.00 IS CODE = 62
COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<<
STREET TABLE SECTION # 1 USED)<<<<<
UPSTREAM ELEVATION(FEET) = 1358.00 DOWNSTREAM ELEVATION(FEET) = 1337.00
STREET LENGTH(FEET) = 1310.00 CURB HEIGHT(INCHES) = 8.0
STREET HALFWIDTH(FEET) = 22.00
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 11.00
1rr INSIDE STREET CROSSFALL(DECIMAL) = 0.020
OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 2
STREET PARKWAY CROSSFALL(DECIMAL) = 0.020
Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0150
Manning's FRICTION FACTOR for Back -of -Walk Flow Section = 0.0199
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 52.46
STREET FLOWING FULL***
STREETFLOW MODEL RESULTS USING ESTIMATED FLOW:
STREET FLOW DEPTH(FEET) = 0.63
HALFSTREET FLOOD WIDTH(FEET) = 22.00
AVERAGE FLOW VELOCITY(FEET/SEC.) = 4.83
PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 3.03
STREET FLOW TRAVEL TIME(MIN.) = 4.52 TC(MIN.) = 17.86
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.384
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 29.00 0.40 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.40
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 29.00 SUBAREA RUNOFF(CFS) = 57.00
EFFECTIVE AREA(ACRES) = 39.00 AREA -AVERAGED Fm(INCH/HR) = 0.20
W-
AREA -AVERAGED Fp(INCH/HR) = 0.40 AREA -AVERAGED Ap = 0.50
N%A TOTAL AREA(ACRES) = 39.00 PEAK FLOW RATE(CFS) = 76.65
01/23/03 QINT25-3
q
m
END OF SUBAREA STREET FLOW HYDRAULICS:
DEPTH(FEET) = 0.69 HALFSTREET FLOOD WIDTH(FEET) = 23.20
FLOW VELOCITY(FEET/SEC.) = 5.62 DEPTH*VELOCITY(FT*FT/SEC.) = 3.88
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 22.00 = 2240.00 FEET.
FLOW PROCESS FROM NODE 22.00 TO NODE 12.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) «« <
ELEVATION DATA: UPSTREAM(FEET) = 1337.00 DOWNSTREAM(FEET) = 1301.00
FLOW LENGTH(FEET) = 1320.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 33.0 INCH PIPE IS 24.5 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 16.22
ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 76.65
PIPE TRAVEL TIME(MIN.) = 1.36 Tc(MIN.) = 19.21
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 12.00 = 3560.00 FEET.
FLOW PROCESS FROM NODE 12.00 TO NODE 12.00 IS CODE = 1
DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 19.21
RAINFALL INTENSITY(INCH/HR) = 2.28
AREA -AVERAGED Fm(INCH/HR) = 0.20
AREA -AVERAGED Fp(INCH/HR) = 0.40
AREA -AVERAGED Ap = 0.50
EFFECTIVE STREAM AREA(ACRES) = 39.00
TOTAL STREAM AREA(ACRES) = 39.00
PEAK FLOW RATE(CFS) AT CONFLUENCE = 76.65
FLOW PROCESS FROM NODE 31.00 TO NODE 32.00 IS CODE = 21
RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<<
INITIAL SUBAREA FLOW-LENGTH(FEET) = 1000.00
ELEVATION DATA: UPSTREAM(FEET) = 1348.00 DOWNSTREAM(FEET) = 1343.00
Tc = K*[(LENGTH** 3.00)/(ELEVF.TION CHANGE)1**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 17.789
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.389
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp
LAND USE GROUP (ACRES) (INCH/HR)
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 12.90 0.40
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) =
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA RUNOFF(CFS) = 25.42
TOTAL AREA(ACRES) = 12.90 PEAK FLOW RATE(CFS)
01/23/03 QINT25-4
Ap SCS Tc
DECIMAL) CN (MIN.)
0.40
0.50 32 17.79
25.42
r"" FLOW PROCESS FROM NODE 32.00 TO NODE 10.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 1333.00 DOWNSTREAM(FEET) = 1317.00
FLOW LENGTH(FEET) = 802.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 24.0 INCH PIPE IS 16.5 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 11.05
ESTIMATED PIPE DIAMETER(INCH) = 24.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 25.42
PIPE TRAVEL TIME(MIN.) = 1.21 Tc(MIN.) = 19.00
LONGEST FLOWPATH FROM NODE 31.00 TO NODE 10.00 = 1802.00 FEET.
FLOW PROCESS FROM NODE 10.00 TO NODE 10.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW«« <
MAINLINE Tc(MIN) = 19.00
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.297
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 16.90 0.40 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.40
oso.. SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
w SUBAREA AREA(ACRES) = 16.90 SUBAREA RUNOFF(CFS) = 31.89
EFFECTIVE AREA(ACRES) = 29.80 AREA -AVERAGED FM(INCH/HR) = 0.20
AREA -AVERAGED Fp(INCH/HR) = 0.40 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 29.80 PEAK FLOW RATE(CFS) = 56.24,
FLOW PROCESS FROM NODE 10.00 TO NODE 12.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA««<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 1317.00 DOWNSTREAM(FEET) = 1301.00
FLOW LENGTH(FEET) = 1305.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 33.0 INCH PIPE IS 26.6 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 10.95
ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 56.24
PIPE TRAVEL TIME(MIN.) = 1.99 Tc(MIN.) = 20.98
LONGEST FLOWPATH FROM NODE 31.00 TO NODE 12.00 = 3107.00 FEET.
FLOW PROCESS FROM NODE 12.00 TO NODE 12.00 IS CODE = 1
DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<<
AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
11%wl CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
01/23/03 QINT25-5
TIME OF CONCENTRATION(MIN.) = 20.98
RAINFALL INTENSITY(INCH/HR) = 2.16
AREA -AVERAGED Fm(INCH/HR) = 0.20
AREA -AVERAGED Fp(INCH/HR) = 0.40
AREA -AVERAGED Ap = 0.50
EFFECTIVE STREAM AREA(ACRES) = 29.80
TOTAL STREAM AREA(ACRES) = 29.80
PEAK FLOW RATE(CFS) AT CONFLUENCE = 56.24
CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 76.65 19.21 2.281 0.40( 0.20) 0.50 39.0 20.00
2 56.24 20.98 2.164 0.40( 0.20) 0.50 29.8 31.00
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 131.22 19.21 2.281 0.40( 0.20) 0.50 66.3 20.00
2 128.56 20.98 2.164 0.40( 0.20) 0.50 68.8 31.00
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 131.22 TC(MIN.) = 19.21
EFFECTIVE AREA(ACRES) = 66.28 AREA -AVERAGED Fm(INCH/HR) = 0.20
AREA -AVERAGED Fp(INCH/HR) = 0.40 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 68.80
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 12.00 = 3560.00 FEET.
FLOW PROCESS FROM NODE 12.00 TO NODE 13.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1301.00 DOWNSTREAM(FEET) = 1288.00
FLOW LENGTH(FEET) = 1008.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 45.0 INCH PIPE IS 36.1 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 13.81
ESTIMATED PIPE DIAMETER(INCH) = 45.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 131.22
PIPE TRAVEL TIME(MIN.) = 1.22 Tc(MIN.) = 20.43
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 13.00 = 4568.00 FEET.
FLOW PROCESS FROM NODE 13.00 TO NODE 13.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 20.43
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.199
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
10,01,
RESIDENTIAL
Nomw "5-7 DWELLINGS/ACRE" A 14.10 0.40 0.50 32
01/23/03 QINT25-6
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.40
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 14.10 SUBAREA RUNOFF(CFS) = 25.37
EFFECTIVE AREA(ACRES) = 80.38 AREA -AVERAGED Fm(INCH/HR) = 0.20
AREA -AVERAGED Fp(INCH/HR) = 0.40 AREA -AVERAGED Ap = 0.50
144.61
TOTAL AREA(ACRES) = 82.90 PEAK FLOW RATE(CFS) _
FLOW PROCESS FROM NODE 13.00 TO NODE 13.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 20.43
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.199
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 10.80 0.40 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.40
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 10.80 SUBAREA RUNOFF(CFS) = 19.43
EFFECTIVE AREA(ACRES) = 91.18 AREA -AVERAGED Fm(INCH/HR) = 0.20
AREA -AVERAGED Fp(INCH/HR) = 0.40 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 93.70 PEAK FLOW RATE(CFS) = 164.04
FLOW PROCESS FROM NODE 13.00 TO NODE 15.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 1288.00 DOWNSTREAM(FEET) = 1258.00
FLOW LENGTH(FEET) = 1775.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 48.0 INCH PIPE IS 35.6 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 16.39
ESTIMATED PIPE DIAMETER(INCH) = 48.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 164.04
PIPE TRAVEL TIME(MIN.) = 1.80 Tc(MIN.) = 22.23
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 15.00 = 6343.00 FEET.
FLOW PROCESS FROM NODE 15.00 TO NODE 15.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 22.23
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.090
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 30.00 0.40 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.40
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 30.00 SUBAREA RUNOFF(CFS) = 51.03
EFFECTIVE AREA(ACRES) = 121.18 AREA -AVERAGED Fm(INCH/HR) = 0.20
AREA -AVERAGED Fp(INCH/HR) = 0.40 AREA -AVERAGED Ap = 0.50
01/23/03 QINT225-7
m
TOTAL AREA(ACRES) = 123.70 PEAK FLOW RATE(CFS) = 206.14
FLOW PROCESS FROM NODE 15.00 TO NODE 18.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 1258.00 DOWNSTREAM(FEET) = 1247.50
FLOW LENGTH(FEET) = 2015.00 RANNING'S N = 0.013
DEPTH OF FLOW IN 63.0 INCH PIPE IS 50.9 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 10.99
ESTIMATED PIPE DIAMETER(INCH) = 63.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 206.14
PIPE TRAVEL TIME(MIN.) = 3.06 Tc(MIN.) = 25.29
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 18.00 = 8358.00 FEET.
END OF STUDY SUMMARY: '
TOTAL AREA(ACRES) = 123.70 TC(MIN.) = 25.29
EFFECTIVE AREA(ACRES) = 121.18 AREA -AVERAGED Fm (INCH/HR)= 0.20
AREA -AVERAGED Fp(INCH/HR) = 0.40 AREA -AVERAGED Ap = 0.50
PEAK FLOW RATE(CFS) = 206.14
PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 206.14 25.29 1.935 0.40( 0.20) 0.50 121.2 20.00
2 199.91 27.07 1.857 0.40( 0.20) 0.50 123.7 31.00
END OF RATIONAL METHOD ANALYSIS
01/23/03 QINT25-8
Q 25 HYDROLOGY
01/23/03 Q25-1
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION)
c) Copyright 1983-2002 Advanced Engineering Software (aes)
Ver. 8.0 Release Date: 01/01/2002 License ID 1251
Analysis prepared by:
MADOLE & ASSOCIATES
10601 CHURCH STREET, SUITE 107
RANCHO CUCAMONGA, CA 91730
DESCRIPTION OF STUDY **************************
Q25 HYDROLOGY FOOTHILL REGIONAL STORM DRAIN
ULTIMATE DESIGN
FILE NAME: P:\661-1677\Drainage\MSDQ25.DAT
TIME/DATE OF STUDY: 14:55 01/23/2003
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
TIME-OF-CONCENTRATION MODEL'
s",- USER SPECIFIED STORM EVENT(YEAR) = 25.00
N41,1 SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95
USER -DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL*
10 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 0.980
100 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 1.470
COMPUTED RAINFALL INTENSITY DATA:
STORM EVENT = 25.00 1 -HOUR INTENSITY(INCH/HOUR) = 1.1520
SLOPE OF INTENSITY DURATION CURVE = 0.6000
ANTECEDENT MOISTURE CONDITION (AMC) II ASSUMED FOR RATIONAL METHOD*
USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL*
HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING
WIDTH CROSSFALL IN- / OUT -/PARK -'HEIGHT WIDTH LIP HIKE FACTOR
NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
1 40.0 20.0 0.020/0.020/0.020 0.67 1.50 0.0312 0.125 0.0150
2 20.0 10.0 0.020/0.020/0.020 0.50 1.50 0.0312 0.125 0.0150
3 20.0 10.0 0.020/0.020/0.020 0.67 1.50 0.0312 0.125 0.0150
GLOBAL STREET FLOW -DEPTH CONSTRAINTS:
1. Relative Flow -Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top -of -Curb)
2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
PIPE MAY BE SIZED TO HAVE A FLOW CAPACITY LESS THAN
UPSTREAM TRIBUTARY PIPE.*
USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED
WW
01/23/03 Q25"2
WWI
FLOW PROCESS FROM NODE 30.00 TO NODE 31.00 IS CODE = 21
RATIONAL METHOD INITIAL SUBAREA ANALYSIS«« <
USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<<
INITIAL SUBAREA FLOW-LENGTH(FEET) = 1000.00
ELEVATION DATA: UPSTREAM(FEET) = 1383.00 DOWNSTREAM(FEET) = 1363.00
Tc = K*((LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 13.482
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.822
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp
LAND USE GROUP (ACRES) (INCH/HR)
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 20.30 0.98
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) =
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA RUNOFF(CFS) = 42.65
TOTAL AREA(ACRES) = 20.30 PEAK FLOW RATE(CFS)
Ap SCS Tc
DECIMAL) CN (MIN.)
mom -
0.500.50 32 13.48
42.65
FLOW PROCESS FROM NODE 31.00 TO NODE 32.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 1356.00 DOWNSTREAM(FEET) = 1333.00
FLOW LENGTH(FEET) = 1166.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 30.0 INCH PIPE IS 19.6 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 12.59
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 42.65
PIPE TRAVEL TIME(MIN.) = 1.54 Tc(MIN.) = 15.03
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 32.00 = 2166.00 FEET.
FLOW PROCESS FROM NODE 32.00 TO NODE 32.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 15.03
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.644
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GFOUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 35.50 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.97
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 35..50 SUBAREA RUNOFF(CFS) = 68.90
EFFECTIVE AREA(ACRES) = 55.80 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 55.80 PEAK FLOW RATE(CFS) = 108.30
FLOW PROCESS FROM NODE 32.00 TO NODE 10.00 IS CODE = 31
01/23/03 Q25-3
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE -FLOW) «« <----- ----
ELEVATION DATA: UPSTREAM(FEET) = 1333.00 DOWNSTREAM(FEET) = 1317.00
FLOW LENGTH(FEET) = 802.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 39.0 INCH PIPE IS 30.4 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 15.60
ESTIMATED PIPE DIAMETER(INCH) = 39.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 108.30
PIPE TRAVEL TIME(MIN.) = 0.86 Tc(MIN.) = 15.88
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 10.00 = 2968.00 FEET.
FLOW PROCESS FROM NODE 10.00 TO NODE 10.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 15.88
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.557
SUBAREA LOSS RATE DATA(AMC II):
Ap SCSAREAFp
LAND USE
DEVELOPMENT TYPE/ SCSSOIL
ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 24.50 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RETE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 24.50 SUBAREA RUNOFF(CFS) = 45.64
EFFECTIVE AREA(ACRES) = 80.30 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 80.30 PEAK FLOW RATE(CFS) = 149.59
FLOW PROCESS FROM NODE 10.00 TO NODE 11.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE -FLOW)<<<<< --------
ELEVATION DATA: UPSTREAM(FEET) = 1317.00 DOWNSTREAM(FEET) = 1310.00
FLOW LENGTH(FEET) = 520.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 48.0 INCH PIPE IS 36.3 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 14.67
ESTIMATED PIPE DIAMETER(INCH) = 48.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 149.59
PIPE TRAVEL TIME(MIN.) = 0.59 Tc(MIN.) = 16.47
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 11.00 = 3488.00 FEET.
FLOW PROCESS FROM NODE 11.00 TO NODE 11.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW«« <
MAINLINE Tc(MIN) = 16.47
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.502
SUBAREA LOSS RATE DATA(AMC II):
SCS
DEVELOPMENT TYPE/ SCS SOIL AREA Fp AP
Aw- LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
v"Ne RESIDENTIAL
01/23/03
Q25-4
5-7 DWELLINGS/ACRE" A 31.10 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 31.10 SUBAREA RUNOFF(CFS) = 56.38
EFFECTIVE AREA(ACRES) = 111.40 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 111.40 PEAK FLOW RATE(CFS) = 201.97
FLOW PROCESS FROM NODE 11.00 TO NODE 12.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1310.00 DOWNSTREAM(FEET) = 1301.00
FLOW LENGTH(FEET) = 670.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 54.0 INCH PIPE IS 40.4 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 15.83
ESTIMATED PIPE DIAMETER(INCH) = 54.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 201.97
PIPE TRAVEL TIME(MIN.) = 0.71 Tc(MIN.) = 17.18
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 12.00 = 4158.00 FEET.
FLOW PROCESS FROM NODE 12.00 TO NODE 12.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 17.18
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.440
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 39.30 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 39.30 SUBAREA RUNOFF(CFS) = 69.05
EFFECTIVE AREA(ACRES) = 150.70 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 150.70 PEAK FLOW RATE(CFS) = 264.78
FLOW PROCESS FROM NODE 12.00 TO NODE 13.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1301.00 DOWNSTREAM(FEET) = 1288.00
FLOW LENGTH(FEET) = 1008.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 60.0 INCH PIPE IS 45.3 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 16.65
ESTIMATED PIPE DIAMETER(INCH) = 60.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 264.78
PIPE TRAVEL TIME(MIN.) = 1.01 Tc(MIN.) = 18.19
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 13.00 = 5166.00 FEET.
01/23/03 Q25-5
FLOW PROCESS FROM NODE 13.00 TO NODE 13.00 IS CODE = --81 ----------
ADDITION-OF- SUBAREA -TO- MAINLINE -PEAK -FLOW<<<<<-----------------------
N. MAINLINE Tc(MIN) = 18.19
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.358
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCSSOIL AREA Fp
LAND USE (ACRES) (INCH/HR) (DECIMAL)
SCS
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 30.30 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 30.30 SUBAREA RUNOFF(CFS) = 51.00
EFFECTIVE AREA(ACRES) = 181.00 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 181.00 PEAK FLOW RATE(CFS) = 304.65
FLOW PROCESS FROM NODE 13.00 TO NODE 13.50 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ----
ELEVATION DATA: UPSTREAM(FEET) = 1288.00 DOWNSTREAM(FEET) = 1269.00
FLOW LENGTH(FEET) = 980.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 57.0 INCH PIPE IS 46.1 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 19.83
ESTIMATED PIPE DIAMETER(INCH) = 57.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 304.65
PIPE TRAVEL TIME(MIN.) = 0.82 Tc(MIN.) = 19.01
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 13.50 = 6146.00 FEET.
FLOW PROCESS FROM NODE 13.50 TO NODE 13.50 IS CODE = 1
DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 19.01
RAINFALL INTENSITY(INCH/HR) = 2.30
AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.97
AREA -AVERAGED Ap = 0.50
EFFECTIVE STREAM AREA(ACRES) = 181.00
TOTAL STREAM AREA(ACRES) = 181.00
PEAK FLOW RATE(CFS) AT CONFLUENCE = 304.65
FLOW PROCESS FROM NODE 20.00 TO NODE 21.00 IS CODE = 21
RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<<
INITIAL SUBAREA FLOW-LENGTH(FEET) = 970.00
401"'^• ELEVATION DATA: UPSTREAM(FEET) = 1317.00 DOWNSTREAM(FEET) = 1302.00
01/23/03
Q25-6
L_
m
Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 14.851
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.663
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp
LAND USE GROUP (ACRES) (INCH/HR)
RESIDENTIAL
3-4 DWELLINGS/ACRE" A 10.00 0.98
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) _
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.60
SUBAREA RUNOFF(CFS) = 18.70
TOTAL AREA(ACRES) = 10.00 PEAK FLOW RATE(CFS}
Ap SCS Tc
DECIMAL) CN (MIN.)
0.60 32 14.85
18.70
FLOW PROCESS FROM NODE 21.00 TO NODE 21.00 IS CODE = 81
ADDITION OF SUBAREA TO :MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 14.85
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.663
SUBAREA LOSS RATE .DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
3-4 DWELLINGS/ACRE" A 10.00 0.98 0.60 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.60
SUBAREA AREA(ACRES) = 10.00 SUBAREA RUNOFF(CFS) = 18.70
EFFECTIVE AREA(ACRES) = 20.00 AREA -AVERAGED Fm(INCH/HR) = 0.59
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.60
TOTAL AREA(ACRES) = 20.00 PEAK FLOW RATE(CFS) = 37.40
FLOW PROCESS FROM NODE 21.00 TO NODE 22.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 1294.00 DOWNSTREAM(FEET) = 1278.00
FLOW LENGTH(FEET) = 920.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 27.0 INCH PIPE IS 20.8 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 11.38
ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 37.40
PIPE TRAVEL TIME(MIN.) = 1.35 Tc(MIN.) = 16.20
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 22.00 = 1890.00 FEET.
FLOW PROCESS FROM NODE 22.00 TO NODE 22.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 16.20
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.527
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
01/23/03 Q25-7
3-4 DWELLINGS/ACRE" A 30.00 0.98 0.60 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.60
SUBAREA AREA(ACRES) = 30.00 SUBAREA RUNOFF(CFS) = 52.4
EFFECTIVE AREA(ACRES) = 50.00 AREA -AVERAGED Fm(INCH/HR) = 0.59
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.60
87.41
TOTAL AREA(ACRES) = 50.00 PEAK FLOW RATE(CFS) _
FLOW PROCESS FROM NODE 22.00 TO NODE 13.50 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1278.00 DOWNSTREAM(FEET) = 1269.00
FLOW LENGTH(FEET) = 800.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 42.0 INCH PIPE IS 29.5 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 12.11
ESTIMATED PIPE DIAMETER(INCH) = 42.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 87.41
PIPE TRAVEL TIME(MIN.) = 1.10 Tc(MIN.) = 17.30
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 13.50 = 2690.00 FEET.
FLOW PROCESS FROM NODE 13.50 TO NODE 13.50 IS CODE = 1
DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<<
AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 17.30
RAINFALL INTENSITY(INCH/HR) = 2.43
AREA -AVERAGED Fm(INCH/HR) = 0.59 ,
AREA -AVERAGED Fp(INCH/HR) = 0.98
AREA -AVERAGED Ap = 0.60
EFFECTIVE STREAM AREA(ACRES) = 50.00
TOTAL STREAM AREA(ACRES) = 50.00
PEAK FLOW RATE(CFS) AT CONFLUENCE = 87.41
CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 304.65 19.01 2.296 0.97( 0.49) 0.50 181.0 30.00
2 87.41 17.30 2.430 0.98( 0.59) 0.60 50.0 20.00
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
20.00
NODE
1 385.12 17.30 2.430 0.98( 0.51) 0.52 214.
2 385.71 19.01 2.296 0.98( 0.51) 0.52 231.0 30.00
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
ter... PEAK FLOW RATE(CFS) = 385.71 Tc(MIN.) = 19.01
rrrr
EFFECTIVE AREA(ACRES) = 231.00 AREA -AVERAGED Fm (INCH/HR) = 0.51
01/23/03
Q25-8
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.52
TOTAL AREA(ACRES) = 231.00
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 13.50 = 6146.00 FEET.
FLOW PROCESS FROM NODE 13.50 TO NODE 14.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA«« <
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 1269.00 DOWNSTREAM(FEET) = 1264.00
FLOW LENGTH(FEET) = 330.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 66.0 INCH PIPE IS 51.7 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 19.31
ESTIMATED PIPE DIAMETER(INCH) = 66.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 385.71
PIPE TRAVEL TIME(MIN.) = 0.28 Tc(MIN.) = 19.30
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 14.00 = 6476.00 FEET.
FLOW PROCESS FROM NODE 14.00 TO NODE 14.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc.(MIN) = 19.30
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.275
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 39.50 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 39.50 SUBAREA RUNOFF(CFS) = 63.56
EFFECTIVE AREA(ACRES) = 270.50 AREA -AVERAGED Fm(INCH/HR) = 0.51
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.52
TOTAL AREA(ACRES) = 270.50 PEAK FLOW RATE(CFS) = 430.88
PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 434.50 17.58 2.406 0.98( 0.51) 0.52 254.2 20.00
2 430.88 19.30 2.275 0.98( 0.51) 0.52 270.5 30.00
NEW PEAK FLOW DATA ARE:
PEAK FLOW RATE(CFS) = 434.50 Tc(MIN.) = 17.58
AREA -AVERAGED Fm(INCH/HR) = 0.51 AREA -AVERAGED Fp(INCH/HR) = 0.98
AREA -AVERAGED Ap = 0.52 EFFECTIVE AREA(ACRES) = 254.19
FLOW PROCESS FROM NODE 14.00 TO NODE 14.00 IS CODE = 1
DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 17.58
RAINFALL INTENSITY(INCH/HR) = 2.41
AREA -AVERAGED Fm(INCH/HR) = 0.51
01/23/03 Q25-9
AREA -AVERAGED Fp(INCH/HR) = 0.98
AREA -AVERAGED Ap = 0.52
EFFECTIVE STREAM AREA(ACRES) = 254.19
TOTAL STREAM AREA(ACRES) = 270.50
PEAK FLOW RATE(CFS) AT CONFLUENCE = 434.50
FLOW PROCESS FROM NODE 40.00 TO NODE 41.00 IS CODE = 21
RATIONAL METHOD INITIAL SUBAREA ANALYSIS««<
USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<<
INITIAL SUBAREA FLOW-LENGTH(FEET) = 1000.00
ELEVATION DATA: UPSTREAM(FEET) = 1332.00 DOWNSTREAM(FEET) = 1318.00
Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 14.479
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.703
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp
LAND USE GROUP (ACRES) (INCH/HR)
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 9.00 0.98
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) _
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA RUNOFF(CFS.) = 17.95
TOTAL AREA(ACRES) = 9.00 PEAK FLOW RATE(CFS)
Ap SCS Tc
DECIMAL) CN (MIN.)
0.50 32 14.48
0.98
17.95
FLOW PROCESS FROM NODE 41.00 TO NODE 42.00 IS CODE = 62
COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA«« <
STREET TABLE SECTION # 3 USED) ««<
UPSTREAM ELEVATION(FEET) = 1318.00 DOWNSTREAM ELEVATION(FEET) = 1305.00
STREET LENGTH(FEET) = 1000.00 CURB HEIGHT(INCHES) = 8.0
STREET HALFWIDTH(FEET) = 20.00
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 10.00
INSIDE STREET CROSSFALL(DECIMAL) = 0.020
OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 2
STREET PARKWAY CROSSFALL(DECIMAL) = 0.020
Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0150
Manning's FRICTION FACTOR for Back -of -Walk Flow Section = 0.0299
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 40.88
STREET FLOWING FULL***
STREETFLOW MODEL RESULTS USING ESTIMATED FLOW:
STREET FLOW DEPTH(FEET) = 0.56
HALFSTREET FLOOD WIDTH(FEET) = 20.00
AVERAGE FLOW VELOCITY(FEET/SEC.) = 4.27
PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 2.39
STREET FLOW TRAVEL TIME(MIN.) = 3.90 Tc(MIN.) = 18.38
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.343
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
01/23/03 Q25-10
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 27.30 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 27.30 SUBAREA RUNOFF(CFS) = 45.58
EFFECTIVE AREA(ACRES) = 36.30 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 36.30 PEAK FLOW RATE(CFS) = 60.61
END OF SUBAREA STREET FLOW HYDRAULICS:
DEPTH(FEET) = 0.62 HALFSTREET FLOOD WIDTH(FEET) = 20.00
FLOW VELOCITY(FEET/SEC.) = 4.98 DEPTH*VELOCITY(FT*FT/SEC.) = 3.11
LONGEST FLOWPATH FROM NODE 40.00 TO NODE 42.00 = 2000.00 FEET.
FLOW PROCESS FROM NODE 42.00 TO NODE 43.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) «« <
ELEVATION DATA: UPSTREAM(FEET) = 1298.00 DOWNSTREAM(FEET) = 1280.00
FLOW LENGTH(FEET) = 985.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 33.0 INCH PIPE IS 23.8 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 13.21
ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 60.61
PIPE TRAVEL TIME(MIN.) = 1.24 Tc(MIN.) = 19.63
LONGEST FLOWPATH FROM NODE 40.00 TO NODE 43.00 = 2985.00 FEET.
FLOW PROCESS FROM NODE 43.00 TO NODE 43.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 19.63
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.252
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
1'5-7 DWELLINGS/ACRE" A 30.10 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 30.10 SUBAREA RUNOFF(CFS) = 47.81
EFFECTIVE AREA(ACRES) = 66.40 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 66.40 PEAK FLOW RATE(CFS) = 105.47
FLOW PROCESS FROM NODE 43.00 TO NODE 14.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1280.00 DOWNSTREAM(FEET) = 1264.00
FLOW LENGTH(FEET) = 1320.00 MANNING'S N = 0.013
err DEPTH OF FLOW IN 42.0 INCH PIPE IS 33.6 INCHES
01/23/03 Q25-11
cm
2.7PIPE-FLOW VELOCITY(FEET/SEC.) = 42.00 NUMBER OF PIPES = 1
ESTIMATED PIPE DIAMETER(INCH) _
PIPE-FLOW(CFS) = 105.47
PIPE TRAVEL TIME(MIN.) = 1.72 TC(MIN.) = 21.35
LONGEST FLOWPATH FROM NODE 40.00 TO NODE 14.00 = 4305.00 FEET.
FLOW PROCESS FROM NODE 14.00 TO NODE 14.00 IS CODE = 1
DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<<
AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 21.35
RAINFALL INTENSITY(INCH/HR) = 2.14
AREA -AVERAGED Fm(INCH/HR) = C.49
AREA -AVERAGED Fp(INCH/HR) = 0.98
AREA -AVERAGED Ap = 0.50
EFFECTIVE STREAM AREA(ACRES) = 66.40
TOTAL STREAM AREA(ACRES) = 66.40
PEAK FLOW RATE(CFS) AT CONFLUENCE = 105.47
CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 434.50 17.58 2.406 0.98( 0.51) 0.52 254.2 20.00
1 430.88 19.30 2.275 0.98( 0.51) 0.52 270.5 30.00
2 105.47 21.35 2.142 0.98( 0.49) 0.50 66.4 40.00
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 535.26 17.58 2.406 0.97( 0.50) 0.52 308.9 20.00
2 533.94 19.30 2.275 0.98( 0.50) 0.52 330.5 30.00
3 503.81 21.35 2.142 0.98( 0.50) 0.51 336.9 40.00
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 535.26 Tc(MIN.) = 17.58
EFFECTIVE AREA(ACRES) = 308.88 AREA -AVERAGED Fm (INCH/HR) = 0.50
AREA -AVERAGED Fp(INCH/HR) = C.97 AREA -AVERAGED Ap = 0.52
TOTAL AREA(ACRES) = 336.90
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 14.00 = 6476.00 FEET.
FLOW PROCESS FROM NODE 14.00 TO NODE 15.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) «« <
ELEVATION DATA: UPSTREAM(FEET) = 1264.00 DOWNSTREAM(FEET) = 1258.00
FLOW LENGTH(FEET) = 465.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 78.0 INCH PIPE IS 59.1 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 19.85
ESTIMATED PIPE DIAMETER(INCH) = 78.00 NUMBER OF PIPES = 1
01/23/03
Q25-12
PIPE-FLOW(CFS) = 535.26
PIPE TRAVEL TIME(MIN.) = 0.39 Tc(MIN.) = 17.97
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 15.00 = 6941.00 FEET.
FLOW PROCESS FROM NODE 15.00 TO NODE 15.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW««<
MAINLINE Tc(MIN) = 17.97
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.374
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 4.60 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 4.60 SUBAREA RUNOFF(CFS) = 7.81
EFFECTIVE AREA(ACRES) = 313.48 AREA -AVERAGED Fm(INCH/HR) = 0.50
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.52
TOTAL AREA(ACRES) = 341.50 PEAK FLOW RATE(CFS) = 535.26
NOTE: PEAK FLOW RATE DEFAULTED TO UPSTREAM VALUE
FLOW PROCESS FROM NODE 15.00 TO NODE 16.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA«« <
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
vp.w/ ELEVATION DATA: UPSTREAM(FEET) = 1258.00 DOWNSTREAM(FEET) = 1252.00
FLOW LENGTH(FEET) = 685.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 84.0 INCH PIPE IS 63.4 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 17.18
ESTIMATED PIPE DIAMETER(INCH) = 84.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 535.26
PIPE TRAVEL TIME(MIN.) = 0.66 Tc(MIN.) = 18.64
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 16.00 = 7626.00 FEET.
FLOW PROCESS FROM NODE 16.00 TO NODE 16.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW««<
MAINLINE Tc(MIN) = 18.64
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.323
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
3-4 DWELLINGS/ACRE" A 15.00 0.98 0.60 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.60
SUBAREA AREA(ACRES) = 15.00 SUBAREA RUNOFF(CFS) = 23.47
EFFECTIVE AREA(ACRES) = 328.48 AREA -AVERAGED Fm(INCH/HR) = 0.51
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.52
4wk TOTAL AREA(ACRES) = 356.50 PEAK FLOW RATE(CFS) = 537.03
01/23/03 Q25-13
FLOW PROCESS FROM NODE 16.00 TO NODE 17.00 IS CODE = --36----------
w >>>>>COMPUTE BOX -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED BOX SIZE (PRESSURE FLOW)<<<<<--------- ----
ELEVATION DATA: UPSTREAM(FEET) = 1252.00 DOWNSTREAM(FEET) = 1249.00
FLOW LENGTH(FEET) = 990.00 8NONOING'
STIM=
0.013
BOX HEIGHT(FEET) = 7.16
GIVEN BOX BASEWIDTH(FEET) _
BOX -FLOW VELOCITY(FEET/SEC.) = 9.37
BOX-FLOW(CFS) = 537.03
BOX -FLOW TRAVEL TIME(MIN.) = 1.76 Tc(MIN.) = 20.40
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 17.00 = 8616.00 FEET.
FLOW PROCESS FROM NODE 17.00 TO NODE 17.00 IS CODE=--81----------
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 20.40
25 YEAR RAINFALL INTENSITY(INCH/HR) = 2.201
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL A 25.00 0.98 0.10 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.10
SUBAREA AREA(ACRES) = 25.00 SUBAREA RUNOFF(CFS) = 47.33
EFFECTIVE AREA(ACRES) = 353.48 AREA -AVERAGED Fm(INCH/HR) = 0.48
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.49
TOTAL AREA(ACRES) = 381.50 PEAK FLOW RATE(CFS) = 548.15
FLOW PROCESS FROM NODE 17.00 TO NODE 18.00 IS CODE -_--36----------
COMPUTE BOX -FLOW TRAVEL TIME THRU SUBAREA«« <
USING COMPUTER -ESTIMATED BOX SIZE (PRESSURE -FLOW)<<<<<--------- ----
ELEVATION DATA: UPSTREAM(FEET) = 1249.00 DOWNSTREAM(FEET) = 1247.50
FLOW LENGTH(FEET) = 290.00 MANNING'S N = 0.013
GIVEN BOX BASEWIDTH(FEET) = 8.00 ESTIMATED BOX HEIGHT(FEET) _ 5.98
BOX -FLOW VELOCITY(FEET/SEC.) = 11.46
BOX-FLOW(CFS) = 548.15
BOX -FLOW TRAVEL TIME(MIN.) = 0.42 Tc(MIN.) = 20,82
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 18.00 = 8906.00 FEET.
END OF STUDY SUMMARY: 20.82
TOTAL AREA(ACRES) = 381.50 TC (MIN.) _
EFFECTIVE AREA(ACRES) = 353.48 AREA -AVERAGED Fm (INCH/HR)= 0.48
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.49
PEAK FLOW RATE(CFS) = 548.15
PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HP.) (INCH/HR) (ACRES) NODE
1 548.15 20.82 2.174 0.97( 0.48) 0.49 353.5 20.00
A..
2 546.38 22.54 2.073 0.98( 0.48) 0.49 375.1 30.00
3 517.49 24.64 1.965 0.98( 0.48) 0.49 381.5 40.00
01/23/03
Q25-14
On
01/23/03
Q 100 HYDROLOGY
Q-1
tri
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION)
c) Copyright 1983-2002 Advanced Engineering Software (aes)
Ver. 8.0 Release Date: 01/01/2002 License ID 1251
Analysis prepared by:
M_kDOLE & ASSOCIATES
10601 CHURCH STREET, SUITE 107
RANCHO CUCAMONGA, CA 91730
DESCRIPTION OF STUDY **************************
Q100 HYDROLOGY FOR FOOTHILL REGIONAL STORM DRAIN
ULTIMATE DESIGN
FILE NAME: P:\661-1677\Drainage\MSDQ100.DAT
TIME/DATE OF STUDY: 14:55 01/23/2003
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
TIME-OF-CONCENTRATION MODEL*--
USER SPECIFIED STORM EVENT(YEAR) = 100.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95
USER -DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL*
10 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 0.980
100 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 1.470
COMPUTED RAINFALL INTENSITY DATA:
STORM EVENT = 100.00 1 -HOUR INTENSITY(INCH/HOUR) = 1.4700
SLOPE OF INTENSITY DURATION CURVE = 0.6000
ANTECEDENT MOISTURE CONDITION (AMC) II ASSUMED FOR RATIONAL METHOD*
USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL*
HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING
WIDTH CROSSFALL IN- / OTiT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR
NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
1 40.0 20.0 0.020/0.020/0.020 0.67 1.50 0.0312 0.125 0.0150
2 20.0 10.0 0.020/0.020/0.020 0.50 1.50 0.0312 0.125 0.0150
3 20.0 10.0 0.020/0.020/0.020 0.67 1.50 0.0312 0.125 0.0150
GLOBAL STREET FLOW -DEPTH CONSTRAINTS:
1. Relative Flow -Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top -of -Curb)
2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
PIPE MAY BE SIZED TO HAVE A FLOW CAPACITY LESS THAN
UPSTREAM TRIBUTARY PIPE.*
USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED
01/23/03 Q-2
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
low >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 1333.00 DOWNSTREAM(FEET) = 1317.00
FLOW LENGTH(FEET) = 802.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 45.0 INCH PIPE IS 32.6 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 16.99
ESTIMATED PIPE DIAMETER(INCH) = 45.0'0 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 145.65
PIPE TRAVEL TIME(MIN.) = 0.79 Tc(MIN.) = 15.71
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 10.00 = 2968.00 FEET.
FLOW PROCESS FROM NODE 10.00 TO NODE 10.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 15.71
100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.285
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 24.50 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 24.50 SUBAREA RUNOFF(CFS) = ) =
0.49
EFFECTIVE AREA(ACRES) = 80.30 AREA -AVERAGED Fm(INCH/HR=
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 80.30 PEAK FLOW RATE(CFS) = 202.17
FLOW PROCESS FROM NODE 10.00 TO NODE 11.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1317.00 DOWNSTREAM(FEET) = 1310.00
FLOW LENGTH(FEET) = 520.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 54.0 INCH PIPE IS 40.4 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 15.84
ESTIMATED PIPE DIAMETER(INCH) = 54.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 202.17 _
PIPE TRAVEL TIME(MIN.) = 0.55 Tc(MIN.) = 16.26
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 11.00 = 3488.00 FEET.
FLOW PROCESS FROM NODE 11.00 TO NODE 11.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW«« <
MAINLINE Tc(MIN) = 16.26
100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.218
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
01/23/03 Q-4
115-7 DWELLINGS/ACRE" A 31.10 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
76.43
AMW' SUBAREA AREA(ACRES) = 31.10 SUBAREA RUNOFF(CFS) _
EFFECTIVE AREA(ACRES) = 111.40 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 111.40 PEAK FLOW RATE(CFS) = 273.78
FLOW PROCESS FROM NODE 11.00 TO NODE 12.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) «« <
ELEVATION DATA: UPSTREAM(FEET) = 1310.00 DOWNSTREAM(FEET) = 1301.00
FLOW LENGTH(FEET) = 670.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 60.0 INCH PIPE IS 45.8 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 17.02
ESTIMATED PIPE DIAMETER(INCH) = 60.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 273.78
PIPE TRAVEL TIME(MIN.) = 0.66 Tc(MIN.) = 16.91
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 12.00 = 4158.00 FEET.
FLOW PROCESS FROM NODE 12.00 TO NODE 12.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 16.91
100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.143
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp
CSCS
CI
LAND USE GROUP (ACRES) (INCH/HR) (DE CMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 39.30 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 39.30 SUBAREA RUNOFF(CFS) = 93.91
EFFECTIVE AREA(ACRES) = 150.70 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 150.70 PEAK FLOW RATE(CFS) = 360.12
FLOW PROCESS FROM NODE 12.00 TO NODE 13.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 1301.00 DOWNSTREAM(FEET) = 1288.00
FLOW LENGTH(FEET) = 1008.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 66.0 INCH PIPE IS 52.3 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 17.82
ESTIMATED PIPE DIAMETER(INCH) = 66.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 360.12
PIPE TRAVEL TIME(MIN.) = 0.94 Tc(MIN.) = 17.85
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 13.00 = 5166.00 FEET.
01/23/03 Q-5
FLOW PROCESS FROM NODE 13.00 TO NODE 13.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 17.85
100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.042
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 30.30 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 30.30 SUBAREA RUNOFF(CFS) = 69.66
EFFECTIVE AREA(ACRES) = 181.00 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50
416.14
TOTAL AREA(ACRES) = 181.00 PEAK FLOW RATE(CFS) _
FLOW PROCESS FROM NODE 13.00 TO NODE 13.50 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 1288.00 DOWNSTREAM(FEET) = 1269.00
FLOW LENGTH(FEET) = 980.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 66.0 INCH PIPE IS 49.6 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 21.75
ESTIMATED PIPE DIAMETER(INCH) = 66.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 416.14
PIPE TRAVEL TIME(MIN.) = 0.75 Tc(MIN.) = 18.60
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 13.50 = 6146.00 FEET.
FLOW PROCESS FROM NODE 13.50 TO NODE 13.50 IS CODE = 1
DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 18.60
RAINFALL INTENSITY(INCH/HR) = 2.97
AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.97
AREA -AVERAGED Ap = 0.50
EFFECTIVE STREAM AREA(ACRES) = 181.00
TOTAL STREAM AREA(ACRES) = 181.00
PEAK FLOW RATE(CFS) AT CONFLUENCE = 416.14
FLOW PROCESS FROM NODE 20.00 TO NODE 21.00 IS CODE = 21
RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<<
INITIAL SUBAREA FLOW-LENGTH(FEET) = 970.00
ELEVATION DATA: UPSTREAM(FEET) = 1317.00 DOWNSTREAM(FEET) = 1302.00
rYw'•'
01/23/03 Q-6
Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 14.851
r.•. * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.398
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
RESIDENTIAL
3-4 DWELLINGS/ACRE" A 10.00 0.98 0.60 32 14.85
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.60
SUBAREA RUNOFF(CFS) = 25.31
TOTAL AREA(ACRES) = 10.00 PEAK FLOW RATE(CFS) = 25.31
FLOW PROCESS FROM NODE 21.00 TO NODE 21.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 14.85
100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.398
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
3-4 DWELLINGS/ACRE" A 10.00 0.98 0.60 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.60
SUBAREA AREA(ACRES) = 10.00 SUBAREA RUNOFF(CFS) = 25.31
EFFECTIVE AREA(ACRES) = 20.00 AREA -AVERAGED Fm(INCH/HR) = 0.59
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.60
TOTAL AREA(ACRES) = 20.00 PEAK FLOW RATE(CFS) = 50.63
FLOW PROCESS FROM NODE 21.00 TO NODE 22.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA«« <
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1294.00 DOWNSTREAM(FEET) = 1278.00
FLOW LENGTH(FEET) = 920.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 30.0 INCH PIPE IS 23.6 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 12.23
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 50.63
PIPE TRAVEL TIME(MIN.) = 1.25 Tc(MIN.) = 16.10
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 22.00 = 1890.00 FEET.
FLOW PROCESS FROM NODE 22.00 TO NODE 22.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 16.10
100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.236
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
01/23/03 Q-7
3-4 DWELLINGS/ACRE" A 30.00 0.98 0.60 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.60
SUBAREA AREA(ACRES) = 30.00 SUBAREA RUNOFF(CFS) = 71.58
EFFECTIVE AREA(ACRES) = 50.00 AREA -AVERAGED Fm(INCH/HR) = 0.59
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.60
TOTAL AREA(ACRES) = 50.00 PEAK FLOW RATE(CFS) = 119.31
FLOW PROCESS FROM NODE 22.00 TO NODE 13.50 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1278.00 DOWNSTREAM(FEET) = 1269.00
FLOW LENGTH(FEET) = 800.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 45.0 INCH PIPE IS 35.2 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 12.88
ESTIMATED PIPE DIAMETER(INCH) = 45.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 119.31
PIPE TRAVEL TIME(MIN.) = 1.03 Tc(MIN.) = 17.14
LONGEST FLOWPATH FROM NODE 20.00 TO NODE 13.50 = 2690.00 FEET.
FLOW PROCESS FROM NODE 13.50 TO NODE 13.50 IS CODE = 1
DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<<
AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 17.14
RAINFALL INTENSITY(INCH/HR) = 3.12
AREA -AVERAGED Fm(INCH/HR) = 0.59
AREA -AVERAGED Fp(INCH/HR) = 0.98
AREA -AVERAGED Ap = 0.60
EFFECTIVE STREAM AREA(ACRES) = 50.00
TOTAL STREAM AREA(ACRES) = 50.00
PEAK FLOW RATE(CFS) AT CONFLUENCE = 119.31
CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 416.14 18.60 2.968 0.97( 0.49) 0.50 181.0 30.00
2 119.31 17.14 3.118 0.98( 0.59) 0.60 50.0 20.00
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 525.81 17.14 3.118 0.98( 0.51) 0.52 216.7 20.00
2 528.39 18.60 2.968 0.98( 0.51) 0.52 231.0 30.00
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE (CFS) = 528.39 Tc (MIN. ) = 18.60
EFFECTIVE AREA(ACRES) = 231.00 AREA -AVERAGED Fm(INCH/HR) = 0.51
01/23/03 Q-8
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.52
TOTAL AREA(ACRES) = 231.00
ww, LONGEST FLOWPATH FROM NODE 30.00 TO NODE 13.50 = 6146.00 FEET.
FLOW PROCESS FROM NODE 13.50 TO NODE 14.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA«« <
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1269.00 DOWNSTREAM(FEET) = 1264.00
FLOW LENGTH(FEET) = 330.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 75.0 INCH PIPE IS 57.4 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 20.98
ESTIMATED PIPE DIAMETER(INCH) = 75.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 528.39
PIPE TRAVEL TIME(MIN.) = 0.26 Tc(MIN.) = 18.87
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 14.00 = 6476.00 FEET.
FLOW PROCESS FROM NODE 14.00 TO NODE 14.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 18.87
100 YEAR RAINFALL INTENSITY(INCH/HR) = 2.943
SUBAREA LOSS RATE DATA(AMC IT):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 39.50 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 39.50 SUBAREA RUNOFF(CFS) = 87.29
EFFECTIVE AREA(ACRES) = 270.50 AREA -AVERAGED Fm(INCH/HR) = 0.51
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.52
TOTAL AREA(ACRES) = 270.50 PEAK FLOW RATE(CFS) = 593.40
PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 595.63 17.40 3.089 0.97( 0.51) 0.52 256.2 20.00
2 593.40 18.87 2.943 0.98( 0.51) 0.52 270.5 30.00
NEW PEAK FLOW DATA ARE:
PEAK FLOW RATE(CFS) = 595.63 Tc(MIN.) = 17.40
AREA -AVERAGED Fm(INCH/HR) = 0.51 AREA -AVERAGED Fp(INCH/HR) = 0.97
AREA -AVERAGED Ap = 0.52 EFFECTIVE AREA(ACRES) = 256.24
FLOW PROCESS FROM NODE 14.00 TO NODE 14.00 IS CODE = 1
DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 17.40
r000+ RAINFALL INTENSITY(INCH/HR) = 3.09
AREA -AVERAGED Fm(INCH/HR) = 0.51
01/23/03 Q-9
AREA -AVERAGED Fp(INCH/HR) = 0.97
AREA -AVERAGED Ap = 0.52
EFFECTIVE STREAM AREA(ACRES) = 256.24
w
TOTAL STREAM AREA(ACRES) = 270.50
PEAK FLOW RATE(CFS) AT CONFLUENCE = 595.63
FLOW PROCESS FROM NODE 40.00 TO NODE 41.00 IS CODE = 21
RATIONAL METHOD INITIAL SUBAREA ANALYSIS «« <
USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<<
INITIAL SUBAREA FLOW-LENGTH(FEET) = 1000.00
ELEVATION DATA: UPSTREAM(FEET) = 1332.00 DOWNSTREAM(FEET) = 1318.00
Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 14.479
100. YEAR RAINFALL INTENSITY(INCH/HR) = 3.450
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp
LAND USE GROUP (ACRES) (INCH/HR)
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 9.00 0.98
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) =
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA RUNOFF(CFS) = 23.99
TOTAL AREA(ACRES) = 9.00 PEAK FLOW RATE(CFS)
Ap SCS Tc
DECIMAL) CN (MIN.)
mom -
0.500.50 32 14.48
23.99
FLOW PROCESS FROM NODE 41.00 TO NODE 42.00 IS CODE = 62
COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA«« <
STREET TABLE SECTION # 3 USED) ««<
UPSTREAM ELEVATION(FEET) = 1318.00 DOWNSTREAM ELEVATION(FEET) = 1305.00
STREET LENGTH(FEET) = 1000.00 CURB HEIGHT(INCHES) = 8.0
STREET HALFWIDTH(FEET) = 20.00
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 10.00
INSIDE STREET CROSSFALL(DECIMAL) = 0.020
OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 2
STREET PARKWAY CROSSFALL(DECIMAL) = D.020
Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0150
Manning's FRICTION FACTOR for Back -of -Walk Flow Section = 0.0299
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 55.41
STREET FLOWING FULL***
STREETFLOW MODEL RESULTS USING ESTIMATED FLOW:
STREET FLOW DEPTH(FEET) = 0.61
HALFSTREET FLOOD WIDTH(FEET) = 20.00
AVERAGE FLOW VELOCITY(FEET/SEC.) = 4.81
PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 2.92
STREET FLOW TRAVEL TIME(MIN.) = 3.47 Tc(MIN.) = 17.95
100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.033
1000- SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
01/23/03 Q-10
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 27.30 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 27.3C SUBAREA RUNOFF(CFS) = 62.53
EFFECTIVE AREA(ACRES) = 36.30 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 36.30 PEAK FLOW RATE(CFS) = 83.15
END OF SUBAREA STREET FLOW HYDRAULICS:
DEPTH(FEET) = 0.69 HALFSTREET FLOOD WIDTH(FEET) = 21.07
FLOW VELOCITY(FEET/SEC.) = 5.65 DEPTH*VELOCITY(FT*FT/SEC.) = 3.88
LONGEST FLOWPATH FROM NODE 40.00 TO NODE 42.00 = 2000.00 FEET.
FLOW PROCESS FROM NODE 42.00 TO NODE 43.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1298.00 DOWNSTREAM(FEET) = 1280.00
FLOW LENGTH(FEET) = 985.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 36.0 INCH PIPE IS 27.9 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 14.14
ESTIMATED PIPE DIAMETER(INCH) = 36.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 83.15
PIPE TRAVEL TIME(MIN.) = 1.16 Tc(MIN.) = 19.11
LONGEST FLOWPATH FROM NODE 40.00 TO NODE 43.00 = 2985.00 FEET.
FLOW PROCESS FROM NODE 43.00 TO NODE 43.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 19.11
100 YEAR RAINFALL INTENSITY(INCH/HR) = 2.921
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 30.10 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 30.10 SUBAREA RUNOFF(CFS) = 65.91
EFFECTIVE AREA(ACRES) = 66.40 AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.50
TOTAL AREA(ACRES) = 66.40 PEAK FLOW RATE(CFS) = 145.41
FLOW PROCESS FROM NODE 43.00 TO NODE 14.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1280.00 DOWNSTREAM(FEET) = 1264.00
FLOW LENGTH(FEET) = 1320.00 MANNING'S N = 0.013
r* DEPTH OF FLOW IN 48.0 INCH PIPE IS 37.1 INCHES
01/23/03 Q-11
PIPE -FLOW VELOCITY(FEET/SEC.) _
ESTIMATED PIPE DIAMETER(INCH) _
PIPE-FLOW(CFS) = 145.41
PIPE TRAVEL TIME(MIN.) = 1.58
LONGEST FLOWPATH FROM NODE
13.95
48.00 NUMBER OF PIPES = 1
Tc(MIN.) = 20.68
40.00 TO NODE 14.00 = 4305.00 FEET.
i.**************************************************
FLOW PROCESS FROM NODE 14.00 TO NODE 14.00 IS CODE = 1 __
DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«« <
AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES«« <
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 20.68
RAINFALL INTENSITY(INCH/HR) = 2.78
AREA -AVERAGED Fm(INCH/HR) = 0.49
AREA -AVERAGED Fp(INCH/HR) = 0.98
AREA -AVERAGED Ap = 0.50
EFFECTIVE STREAM AREA(ACRES) = 66.40
TOTAL STREAM AREA(ACRES) = 66.40
PEAK FLOW RATE(CFS) AT CONFLUENCE = 145.41
CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 595.63 17.40 3.089 0.97( 0.51) 0.52 256.2 20.00
1 593.40 18.87 2.943 0.98( 0.51) 0.52 270.5 30.00
2 145.41 20.68 2.785 0.98( 0.49) 0.50 66.4 40.00
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 734.15 17.40 3.089 0.97( 0.50) 0.52 312.1 20.00
2 735.15 18.87 2.943 0.98( 0.50) 0.52 331.1 30.00
3 700.33 20.68 2.785 0.98( 0.50) 0.51 336.9 40.00
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 735.15 Tc(MIN.) = 18.87
EFFECTIVE AREA(ACRES) = 331.06 AREA -AVERAGED Fm(INCH/HR) = 0.50
AREA -AVERAGED Fp(INCH/HR) _ 0.98 AREA -AVERAGED Ap = 0.52
TOTAL AREA(ACRES) = 336.90
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 14.00 = 6976.00 FEET.
FLOW PROCESS FROM NODE 14.00 TO NODE 15.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA«« <
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FFET) = 1264.00 DOWNSTREAM(FEET) = 1258.00
FLOW LENGTH(FEET) = 465.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 87.0 INCH PIPE IS 67.5 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 21.40
ESTIMATED PIPE DIAMETER(INCH) = 87.00 NUMBER OF PIPES = 1
01/23/03 Q-12
PIPE-FLOW(CFS) = 735.15
PIPE TRAVEL TIME(MIN.) = 0.36 Tc(MIN.) = 19.23
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 15.00 = 6941.00 FEET.
FLOW PROCESS FROM NODE 15.00 TO NODE 15.00 IS CODE = 81
ADDITION OF SUBAREA TO MkINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 19.23
100 YEAR RAINFALL INTENSITY(INCH/HR) = 2.910
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
5-7 DWELLINGS/ACRE" A 4.60 0.98 0.50 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50
SUBAREA AREA(ACRES) = 4.60 SUBAREA RUNOFF(CFS) = 10.03
EFFECTIVE AREA(ACRES) = 335.66 AREA -AVERAGED Fm(INCH/HR) = 0.50
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.51
735.15
TOTAL AREA(ACRES) = 341.50 PEAK FLOW RATE(CFS) _
NOTE: PEAK FLOW RATE DEFAULTED TO UPSTREAM VALUE
FLOW PROCESS FROM NODE 15.00 TO NODE 16.00 IS CODE = 31
COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA«« <
USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1258.00 DOWNSTREAM(FEET) = 1252.00
FLOW LENGTH(FEET) = 685.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 93.0 INCH PIPE IS 73.2 INCHES
PIPE -FLOW VELOCITY(FEET/SEC.) = 18.46
ESTIMATED PIPE DIAMETER(INCH) = 93.00 NUMBER OF PIPES = 1
PIPE-FLOW(CFS) = 735.15
PIPE TRAVEL TIME(MIN.) = 0.62 Tc(MIN.) = 19.85
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 16.00 = 7626.00 FEET.
FLOW PROCESS FROM NODE 16.00 TO NODE 16.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 19.85
100 YEAR RAINFALL INTENSITY(INCH/HR) = 2.855
SUBAREA LOSS RATE DATA(AMC !I):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
RESIDENTIAL
3-4 DWELLINGS/ACRE" A 15.00 0.98 0.60 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREti FRACTION, Ap = 0.60
SUBAREA AREA(ACRES) = 15.00 SUBAREA RUNOFF(CFS) = 30.64
EFFECTIVE AREA(ACRES) = 350.66 AREA -AVERAGED Fm(INCH/HR) = 0.51
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.52
741.42
TOTAL AREA(ACRES) = 356.50 PEAK FLOW RATE(CFS) _
t rrr
01/2303 Q-13
FLOW PROCESS FROM NODE 16.00 TO NODE 17.00 IS CODE = 36
COMPUTE BOX -FLOW TRAVEL TIME THRU SUBAREA«« <
USING COMPUTER -ESTIMATED BOX SIZE (PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 1252.00 DOWNSTREAM(FEET) = 1249.00
FLOW LENGTH(FEET) = 990.00 MANNING'S N = 0.013
GIVEN BOX BASEWIDTH(FEET) = 8.00 ESTIMATED BOX HEIGHT(FEET) = 9.12
BOX -FLOW VELOCITY(FEET/SEC.) = 10.16
BOX-FLOW(CFS) = 741.42
BOX -FLOW TRAVEL TIME(MIN.) = 1.62 Tc(MIN.) = 21.47
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 17.00 = 8616.00 FEET.
FLOW PROCESS FROM NODE 17.00 TO NODE 17.00 IS CODE = 81
ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
MAINLINE Tc(MIN) = 21.47
100 YEAR RAINFALL INTENSITY(INCH/HR) = 2.723
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL A 25.00 0.98 0.10 32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.10
SUBAREA AREA(ACRES) = 25.00 SUBAREA RUNOFF(CFS) = 59.08
EFFECTIVE AREA(ACRES) = 375.66 AREA -AVERAGED Fm(INCH/HR) = 0.48
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.49
758.97
TOTAL AREA(ACRES) = 381.50 PEAK FLOW RATE(CFS) _
FLOW PROCESS FROM NODE 17.00 TO NODE 18.00 IS CODE = 36
COMPUTE BOX -FLOW TRAVEL TIME THRU SUBAREA<<<<<
USING COMPUTER -ESTIMATED BOX SIZE (PRESSURE FLOW) ««<
ELEVATION DATA: UPSTREAM(FEET) = 1249.00 DOWNSTREAM(FEET) = 1247.50
FLOW LENGTH(FEET) = 290.00 MANNING'S N = 0.013
7,59
GIVEN BOX BASEWIDTH(FEET) = 8.00 ESTIMATED BOX HEIGHT(FEET) _
BOX -FLOW VELOCITY(FEET/SEC.) = 12.49
BOX-FLOW(CFS) = 758.97
BOX -FLOW TRAVEL TIME(MIN.) = 0.39 Tc(MIN.) = 21.86
LONGEST FLOWPATH FROM NODE 30.00 TO NODE 18.00 = 8906.00 FEET.
END OF STUDY SUMMARY: 21.86
TOTAL AREA(ACRES)
37=
381.50 TC (MIN.) _
EFFECTIVE AREA(ACRES) ES) = 5.66 AREA -AVERAGED Fm(INCH/HR)= 0.48
AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.49
PEAK FLOW RATE(CFS) = 758.97
PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 758.68 20.39 2.809 0.97( 0.48) 0.49 356.7 20.00
2 758.97 21.86 2.694 0.98( 0.48) 0.49 375.7 30.00
3 725.30 23.72 2.565 0.98( 0.48) 0.49 381.5 40.00
01/23/03 Q-14
IN
a
END OF RATIONAL METHOD ANALYSIS
01/23/03 Q-15
olm
CONCEPTUAL
STORM DRAIN HYDRAULICS
01/23/03 H-1
01/23/03 H-2
FILE: FH-INT.WSW W S P G W - EDIT LISTING Version 14.01 Date: 1-21-2003 Time:10:46:20
WATER SURFACE PROFILE - CHANNEL DEFINITION LISTING PAGE 1
CARD SECT CHN NO OF AVE PIER HEIGHT 1 BASE ZL ZR INV Y(1) Y(2) Y(3) Y(4) Y(5) Y(6) Y(7) Y(8) Y(9) Y(10)
CODE NO TYPE PIER/PIP WIDTH DIAMETER WIDTH DROP
CD 1 4 1 5.500
CD 2 3 0 .000 6.000 8.000 000 .000 00
CD 3 4 1 3.000
CD 4 4 1 7.500
W S P G W PAGE NO 1
WATER SURFACE PROFILE - TITLE CARD LISTING
HEADING LINE NO 1 IS
INTERIM Q25 FOOTHILL STORM DRAIN
HEADING LINE NO 2 IS
EAST OF HEMLOCK AVE
HEADING LINE NO 3 IS
W S P G W PAGE NO 2
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO 1 IS A SYSTEM OUTLET
U/S DATA STATION INVERT SECT W S ELEV
2108.580 1247.490 1 1253.690
ELEMENT NO 2 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
2159.580 1247.740 1 013 000 000 000 0
ELEMENT NO 3 IS A TRANSITION
U/S DATA STATION INVERT SECT N RADIUS ANGLE
2183.580 1247.860 2 013 000 000
ELEMENT NO 4 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
2455.000 1249.220 2 013 000 000 000 0
ELEMENT NO 5 IS A JUNCTION
U/S DATA STATION INVERT SECT LAT -1 LAT -2 N Q3 Q4 INVERT -3 INVERT -4 PHI 3 PHI 4
2458.000 1249.300 2 3 0 013 .010 .000 1250.800 000 45.000 000
RADIUS ANGLE
000 000
ELEMENT NO 6 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
2461.000 1249.420 2 013 000 000 000 0
ELEMENT NO 7 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
2950.000 1251.870 2 013 000 000 000 0
ELEMENT NO 8 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
2956.000 1252.070 2 013 000 000 000 0
ELEMENT NO 9 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
01/23/03 H-2
z
3445.000 1254.510 2 .013
ELEMENT NO 10 IS A JUNCTION
U/S DATA STATION INVERT SECT LAT -1 LAT -2 N Q3
3448.000 1254.610 2 3 0 .013 .010
000 .000 .000 0
Q4 INVERT -3 INVERT -4 PHI 3 PHI 4
000 1256.100 .000 45.000 .000
RADIUS ANGLE
000 .000
01/23/03 H-3
W S P G W PAGE NO 3
WATER SURFACE PROFILE - ELEMENT CARD LISTING
WARNING - ADJACENT SECTIONS ARE NOT IDENTICAL SEE SECTION NUMBERS AND CHANNEL DEFINITIONS
ELEMENT NO 11 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
3451.000 1254.710 4 013 000 000 000 0
ELEMENT NO 12 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
3940.000 1257.160 4 013 000 000 000 0
ELEMENT NO 13 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
3946.000 1257.360 4 013 000 000 000 0
ELEMENT NO 14 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
4123.490 1258.240 4 013 000 000 000 0
ELEMENT NO 15 IS A SYSTEM HEADWORKS
U/S DATA STATION INVERT SECT W S ELEV
4123.490 1258.240 4 1258.240
01/23/03 H-3
01/23/03 H-4
FILE: FH-INT.WSW W S P G W- CIVILDESIGN Version 14.01 PAGE 1
Program Package Serial Number: 1296
WATER SURFACE PROFILE LISTING Date: 1-21-2003 Time:10:46:24
INTERIM Q25 FOOTHILL STORM DRAIN
EAST OF HEMLOCK AVE
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeight/IBase Wt1 INo Wth
Station I Elev I FT) I Elev I CFS) I (FPS) Head I Grd.E1.1 Elev I Depth I Width IDia.-FTIor I.D.I ZL IPrs/Pip
I-
L/Elem
I-
ICh Slope I
I-
I
I-
I
I- -I- -I-
I SF Avel
I-
HF
I-
ISE DpthlFroude
I-
NINorm
I-
Dp
I-
I "N"
I-
I X -Fall) ZR
I
Type Ch
2108.580
I I
1247.490
I
6.200 1253.690
I I
206.02 8.67
I
1.17 1254.86
I
00
I
4.02
I
00
I
5.500
I I
000 00
I
1 .0
I-
51.000
I-
0049
I- I- I- -I- I-
0038
I-
19
I-
6.20
I-
00
I-
3.99
I-
013
I-
00 00
1-
PIPE
2159.580
I
1247.740
I I
6.142 1253.882
I I
206.02 8.67
I
1.17 1255.05
I
00
I
4.02
I
00
I
5.500
I I
000 00
I
1 .0
TRANS STR 0050 0007 02 6.14 00 013 00 00 PIPE
2183.580
I I
1247.860
I
7.045 1254.905
I I
206.02 4.29
I
29 1255.19
I
00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
241.717
I-
0050
I- I- I- -I- I-
0007
I-
17
I-
7.05
I-
31
I-
2.42
I-
013
I-
00 00
1-
BOX
2425.297
I
1249.071
I I
6.000 1255.071
I I
206.02 4.29
I
29 1255.36
I
00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
29.703
I-
0050
I- I- I- -I- I-
0004
I-
01
I-
6.00
I-
31
I-
2.42
I-
013
I-
00 00
1-
BOX
2455.000
I
1249.220
I I
5.849 1255.069
I I
206.02 4.40
I
30 1255.37
I
00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
JUNCT STR
I-
0267
I- I- I- -I- I-
0005
I-
00
I-
5.' 85
I-
32
I- I-
013
I-
00 00
I-
BOX
WARNING - Flow depth near top of box conduit --------------------
2458.000
I
1249.300
I I
5.761 1255.061
I I
206.01 4.47
I
31 1255.37
I
00
I
2.74
I
8.00
I
6.000
I 1
8.000 00
1
0 .0
I-
3.000
I-
0400
I- I- I- -I- I-
0005
I-
00
I-
5.76
I-
33
I-
1.19
I-
013
I-
00 00
1-
BOX
WARNING - Flow depth near top of box conduit --------------------
2461.000
I
1249.420
I I
5.628 1255.048
I I
206.01 4.58
I
33 1255.37
I
00
I
2.74
I
8.00
I
6.000
I 1
8.000 00
1
0 .0
I-
51.428
I-
0050
I- I- I- -I- I-
0005
I-
03
I-
5.63
I-
34
I-
2.42
I-
013
I-
00 00
1-
BOX
WARNING - Flow depth near top of box conduit
01/23/03 H-4
01/23/03 H-5
C)
FILE: FH-INT.WSW W S P G W- CIVILDESIGN Version 14.01 PAGE 2
Program Package Serial Number: 1296
WATER SURFACE PROFILE LISTING Date: 1-21-2003 Time:10:46:24
INTERIM Q25 FOOTHILL STORM DRAIN
EAST OF HEMLOCK AVE
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeight/IBase Wt1 INo Wth
Station I Elev I FT) I Elev I (CFS) I FPS) Head I Grd.El.l Elev I Depth I Width IDia.-FTlor I.D.1 ZL IPrs/Pip
I-
L/Elem
I-
ICh Slope I
I-
I
I-
I
I-
I
I- I-
Sw Avel
I- -I-
HF ISE DpthlFroude
I-
NINorm
I-
Dp
I-
I "N"
1-
I X-Fa111
1
ZR Type Ch
I
2512.428
I
1249.678
I
5.366
I
1255.043 206.01 4.80
I
36
I
1255.40 00 2.74
I
8.00
I
6.000
I
8.000 00
I
0 .0
48.750 0050 0006 03 5.37 37 2.42 013 00 00 BOX
2561.178
I I
1249.922
I
5.116 1255.038
I I
206.01 5.03
I
39
I
1255.43 00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
46.144
I-
0050
I- I- I- I- I-
0007
I-
03
I-
5.12
I-
39
I-
2.42
I-
013
I-
00 00
1-
BOX
2607.322
I
1250.153
I I
4.878 1255.031
I I
206.01 5.28
I
43
I
1255.46 00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
43.597
I-
0050
I- I- I- I- I-
0007
I-
03
i-
4.88
I-
42
I-
2.42
I-
013
I-
00 00
1-
BOX
2650.919
I
1250.372
I I
4.651 1255.022
I I
206.01 5.54
I
48
I
1255.50 00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
41.094
I-
0050
I- I- I- I- I-
0008
I-
03
i-
4.65
I-
45
I-
2.42
I-
013
I-
00 00
1-
BOX
2692.013
I
1250.578
I I
4.434 1255.012
I I
206.01 5.81
I
52
I
1255.54 00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
38.617 0050 0010 04 4.43 49 2.42 013 00 00 BOX
2730.630
I
1250.771
I I
4.228 1254.999
I I
206.01 6.09
I
58
I
1255.58 00
I
2.74
I
8.00
I
6.000
I
8.000
I
00
I
0 .0
I-
36.142
I-
0050
I- I- I- I- I-
0011
I-
04
I-
4.23
I-
52
I-
2.42
I-
013
I-
00 00
1-
BOX
2766.771
I
1250.952
I
4.031
I
1254.983
I I
206.01 6.39
I
63
I
1255.62 00
I
2.74
I
8.00
I
6.000
I
8.000
I
00
I
0 .0
I-
33.639
I-
0050
I- I- I- I- I-
0012
I-
04
I-
4.03
I-
56
I-
2.42
I-
013
I-
00 00
1-
BOX
2800.411
I
1251.121
I
3.844
I
1254.964
I I
206.01 6.70
I
70
I
1255.66 00
I
2.74
I
8.00
I
6.000
I
8.000
1
00
1
0 .0
I-
31.069
I-
0050
I- i- I- I- I-
0014
I-
04
I-
3.84
I-
60
I-
2.42
I-
013
I-
00 00
1-
BOX
01/23/03 H-5
01/23/03 H-6
FILE: FH-INT.WSW W S P G W- CIVILDESIGN Version 14.01 PAGE 3
Program Package Serial Number: 1296
WATER SURFACE PROFILE LISTING Date: 1-21-2003 Time:10:46:24
INTERIM Q25 FOOTHILL STORM DRAIN
EAST OF HEMLOCK AVE
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeight/IBase WtI INo Wth
Station
I-
I Elev I FT) I Elev I (CFS) I
I-
FPS)
I-
Head I
I-
Grd.El.l Elev
I-
I Depth I
I-
Width IDia.-FTlor
I- -I-
I.D.I
I-
ZL
I
IPrs/Pip
L/Elem
I-
ICh Slope I
I-
I
I-
I I SF Avel
I-
HF ISE DpthlFroude NINorm Dp I "N" I X -Fall) ZR Type Ch
2831.480
I I
1251.276
I
3.665 1254.941
I I
206.01 7.03
I
77
I
1255.71 00
i I
2.74 8.00
I
6.000
I I
8.000 00
I
0 .0
I-
28.373
I-
0050
I- I- I- i- I-
0016
I-
05
I-
3.66
I-
65 2.42
I- -I-
013
I-
00 00
1-
BOX
2859.853
I I
1251.418
I
3.494 1254.913
I I
206.01 7.37
I
84
I
1255.76 00
I I
2.74 8.00
I
6.000
I I
8.000 00
I
0 .0
I-
25.464
I-
0050
I- I- I- I- I-
0018
I-
05
i-
3.49
I-
69 2.42
I- -I-
013
i-
00 00
1-
BOX
2885.317
I I
1251.546
I
3.332 1254.878
I I
206.01 7.73
I
93
I
1255.81 00
I
2.74
I
8.00
i
6.000
I I
8.000 00
I
0 .0
I-
8.700
I-
0050
I- I- I- I- I-
0021
I-
02
I-
3.33
I-
75 2.42
I- -i-
013
I-
00 00
1-
BOX
2894.017
I I
1251.590
I
3.274 1254.864
I I
206.01 7.86
I
96
I
1255.82 00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
HYDRAULIC JUMP
2894.017
I I
1251.590
I
2.268 1253.857
I I
206.01 11.36
I
2.00
I
1255.86 00
i
2.74
i
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
55.983
I-
0050
I- I- I- I- I-
0064
I-
36
I-
2.27
I-
1.33 2.42
I- -I-
013
I-
00 00
1-
BOX
2950.000
I I
1251.870 2.187
I
1254.057
I I
206.01 11.78
I
2.15
i
1256.21 00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
632
I-
0333
I- I- I- i- I-
0066
I-
00
I-
2.19
I-
1.40 1.27
i- -I-
013
I-
00 00
1-
BOX
2950.632
I I
1251.891 2.203
I
1254.094
I I
206.01 11.69
i
2.12
I
1256.22 00
I
2.74
I
8.00
I
6.000
I I
8.000 00
i
0 .0
I-
3.135
I-
0333
I- I- I- I- I-
0061
I-
02
I-
2.20
I-
1.39 1.27
i- -I-
013
I-
00 00
1-
BOX
2953.767
I I
1251.995 2.311
I
1254.307
I I
206.01 11.14
I
1.93
I
1256.23 00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
2.233
I-
0333
I- I- I- I- i-
0054
I-
01
I-
2.31
I-
1.29 1.27
I- -I-
013
I-
00 00
1-
BOX
2956.000
I i
1252.070 2.424
I-
I
1254.494
I-
I I
206.01
I-
10.62
i-
I
1.75
I
1256.25 00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
327.055
I-
0050
I-
0050
I-
1.63
I-
2.42
I-
1.20 2.42
I- -I-
013
i-
00 00
1-
BOX
01/23/03 H-6
01/23/03 H-7
FILE: FH-INT.WSW W S P G W- CIVILDESIGN Version 14.01 PAGE 4
Program Package Serial Number: 1296
WATER SURFACE PROFILE LISTING Date: 1-21-2003 Time:10:46:24
INTERIM Q25 FOOTHILL STORM DRAIN
EAST OF HEMLOCK AVE
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeight/IBase Wtl INo Wth
Station I Elev I FT) I Elev I CFS) I
I-
FPS)
i-
Head I
I-
Grd.E1.1
I-
Elev
I-
I Depth
I-
I Width
I-
IDia.-FTlor
I-
I.D.f
I-
ZL
I
IPrs/Pip
I-
L/Elem ICh
I-
Slope I
I-
I
I-
I I SF Avel HF ISE DpthlFroude NINorm Dp I "N" I X-Fa111 ZR IType Ch
II
3283.055
I
1253.702
I
2.424
I
1256.126
I
206.01 10.62
I
1.75
I
1257.88 00
I
2.74
I
8.00
i
6.000
I I
8.000 00 0 .0
I-
161.945
I-
0050
I- I- I- I- I-
0051
I-
83
I-
2.42
I-
1.20
I-
2.42
I-
013
I-
00 00
1-
BOX
I
3445.000
I
1254.510
I
2.375
I
1256.885
I
206.01 10.84
I
1.83
I
1258.71 00
I
2.74
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
JUNCT STR
I-
0333
I- I- I- I- I-
0044
i-
01
I-
2.38
I-
1.24
I- I-
013
I-
00 00
I-
BOX
3448.000
I-
1
1254.610
I-
I
2.741
I-
1257.351
I-
I I
206.00
I-
9.40
I-
I
1.37
I-
I
1258.72
I-
00
I-
I
2.74
I-
I
8.00
I-
I
6.000
I-
I I
8.000
I-
00
I
0 .0
I-
I
3448.000
I
1254.610
I
3.095 1257.705
I I
206.00 11.98
I
2.23
I
1259.93 00
I
3.67
I
7.38
I
7.500
I I
000 00
I
1 .0
I-
3.000
I-
0333
I- I- I- I- I-
0053
I-
02
I-
3.10
I-
1.38
I-
1.94
I-
013
I-
00 00
1-
PIPE
I
3451.000 1254.710
I I
3.201 1257.911
I I
206.00 11.45
I
2.04
I
1259.95 00
I
3.67
I
7.42
i
7.500
I I
000 00
I
1 .0
I-
86.699
I-
0050
I- I- I- I- I-
0050
I-
43
I-
3.20
I-
1.30
I-
3.20
I-
013
I-
00 00
1-
PIPE
I
3537.699
I
1255.144
I
3.201 1258.345
I I
206.00 11.45
I
2.04
I
1260.38 00
I
3.67
I
7.42
I
7.500
I I
000 00
I
1 .0
I-
249.145
I-
0050
I- I- I- I- I-
0052
I-
1.29
f-
3.20
I-
1.30
I-
3.20
i-
013
I-
00 00
1-
PIPE
I
3786.844 1256.393
I I
3.150 1259.543
I I
206.00 11.70
I
2.12
i
1261.67 00
I
3.67
I
7.40
I
7.500
I I
000 00
I
1 .0
I-
153.156
I-
0050
I- I- I- I- I-
0057
I-
87
I-
3.15
i-
1.34
I-
3.20
I-
013
I-
00 00
1-
PIPE
I
3940.000 1257.160
I I
3.039 1260.199
I I
206.00 12.27
I
2.34
I
1262.54 00
I
3.67
I
7.36
I
7.500
i I
000 00
I
1 .0
I-
3.147
I-
0333
I- I- I- I- I-
0057
I-
02
I-
3.04
I-
1.43
I-
1.94
i-
013
I-
00 00
I-
PIPE
I
3943.147 1257.265
I I
3.132 1260.397
I I
206.00 11.79
I
2.16
I
1262.55 00
I
3.67
I
7.40
I
7.500
i I
000 00
I
1 .0
I-
2.853
I
i-
0333
I-
I I
I- I-
I I
I- I-
0051
I
I-
01
I
I-
3.13
I-
1.35
I
I-
1.94
I
I-
013
I
I-
00
I
00
I
1-
PIPE
I
01/23/03 H-7
3946.000 1257.360 3.248 1260.607 206.00 11.24 1.96 1262.57 .00 3.67 7.43 7.500 .000 .00 1 .0
I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- 1-
68.095 .0050 .0047 .32 3.25 1.26 3.21 .013 .00 .00 PIPE
01/23/03 H-8
01/23/03 H-9
FILE: FH-INT.WSW W S P G W- CIVILDESIGN Version 14.01 PAGE 5
Program Package Serial Number: 1296
WATER SURFACE PROFILE LISTING Date: 1-21-2003 Time:10:46:24
INTERIM Q25 FOOTHILL STORM DRAIN
EAST OF HEMLOCK AVE
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeight/IBase Wt1 INo Wth
Station I Elev I FT) I Elev I CFS) I FPS) Head I Grd.E1.1 Elev I Depth I Width IDia.-FTlor I.D.I ZL IPrs/Pip
I-
L/Elem
I-
ICh Slope I
I- -I-
I I
I-
I
I- I-
SF Avel
I-
HF
I-
ISE DpthlFroude
I- -I-
NINorm Dp
i-
I "N" I X-Fa111
I-
ZR
I
Type Ch
4014.095
I I
1257.698
I I
3.282 1260.980
I
206.00 11.08
I
1.91 1262.89
1
00
I
3.67
I
7.44
I I
7.500
I
000 00
I
1 .0
I-
77.818
I-
0050
I- -I- I- I- I-
0043
I-
33
I-
3.28 1.24
I- -I-
3.21
I-
013
I-
00 00
1-
PIPE
4091.913
I I
1258.083
I
3.404 1261.487
I I
206.00 10.56
I
1.73 1263.22
I
00
I
3.67
1
7.47
I I
7.500
I
000 00
I
1 .0
25.893 0050 0038 10 3.40 1.15 3.21 013 00 00 PIPE
4117.807
I I
1258.212
I
3.531 1261.743
I I
206.00 10.07
I
1.58 1263.32
I
00
I
3.67
I
7.49
I I
7.500
I
000 00
I
1 .0
I-
5.684
I-
0050
I- -I- I- I- I-
0033
I-
02
I-
3.53 1.07
I- -I-
3.21
I-
013
I-
00 00
1-
PIPE
4123.490
I i
1258.240
I
3.666 1261.906
I I
206.00 9.60
i
1.43 1263.34
I
00
I
3.67
I
7.50
I I
7.500
I
000 00
I
1 .0
01/23/03 H-9
01/23/03 1I-10
FILE: FH-ULT.WSW W S P G W - EDIT LISTING - Version 14.01 Date: 1-23-2003 Time: 4:12:43
WATER SURFACE PROFILE CHANNEL DEFINITION LISTING PAGE 1
CARD SECT CHN NO OF AVE PIER HEIGHT 1 BASE ZL ZR INV Y(1) Y(2) Y(3) Y(4) Y(5) Y(6) Y(7) Y(8) Y(9) Y(10)
CODE NO TYPE PIER/PIP WIDTH DIAMETER WIDTH DROP
CD 1 4 1 7.500
CD 2 3 0 .000 6.000 8.000 000 .000 .00
CD 3 4 1 3.000
CD 4 4 1 8.000
W S P G W PAGE NO 1
WATER SURFACE PROFILE - TITLE CARD LISTING
HEADING LINE NO 1 IS
ULTIMATE FOOTHILL STORM DRAIN Q100
HEADING LINE NO 2 IS
EAST OF HEMLOCK AVE
HEADING LINE NO 3 IS
W S P G W PAGE NO 2
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO 1 IS A SYSTEM OUTLET
U/S DATA STATION INVERT SECT W S ELEV
2108.580 1245.000 1 1245.000
ELEMENT NO 2 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
2159.580 1246.000 1 013 000 000 000 0
ELEMENT NO 3 IS A TRANSITION
U/S DATA STATION INVERT SECT N RADIUS ANGLE
2183.580 1247.860 2 013 000 000
ELEMENT NO 4 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
2455.000 1249.220 2 013 000 000 000 0
ELEMENT NO 5 IS A JUNCTION
U/S DATA STATION INVERT SECT LAT -1 LAT -2 N Q3 Q4 INVERT -3 INVERT -4 PHI 3 PHI 4
2461.000 1249.420 2 3 0 .013 44.000 .000 1250.800 000 45.000 000
RADIUS ANGLE
000 000
ELEMENT NO 6 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
2950.000 1251.870 2 013 000 000 000 0
ELEMENT NO 7 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
2956.000 1252.070 2 013 000 000 000 0
ELEMENT NO 8 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
3445.000 1254.510 2 013 000 000 000 0
ELEMENT NO 9 IS A JUNCTION
01/23/03 1I-10
01/23/03 H-11
U/S DATA STATION INVERT SECT LAT -1 LAT -2 N Q3 Q4 INVERT -3 INVERT 4 PHI 3 PHI 4
3451.000 1254.710 4 3 0 013 29.000 .000 1256.100 000 45.000 000
RADIUS ANGLE
000 000
ELEMENT NO 10 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
3940.000 1257.160 4 013 000 000 000 0
W S P G W PAGE NO 3
WATER SURFACE PROFILE ELEMENT CARD LISTING
ELEMENT NO 11 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
3946.000 1257.360 4 013 000 000 000 0
ELEMENT NO 12 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
4123.490 1258.240 4 013 000 000 000 0
ELEMENT NO 13 IS A SYSTEM HEADWORKS
U/S DATA STATION INVERT SECT W S ELEV
4123.490 1258.240 4 1258.240
01/23/03 H-11
It
FILE: FH-ULT.WSW W S P G W- CIVILDESIGN Version 14.01 PAGE 1
Program Package Serial Number: 1296
WATER SURFACE PROFILE LISTING Date: 1-23-2003 Time: 4:12:47
ULTIMATE FOOTHILL STORM DRAIN Q100
EAST OF HEMLOCK AVE
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeight/lBase Wtl INo Wth
Station I Elev I FT) I Elev
I-
I (CFS) I (FPS)
I-
Head I
I-
Grd.El.l
I-
Elev
I-
I Depth I Width
I-
IDia.-FTlor I.D.I ZL IPrs/Pip
II-
L/Elem
I-
ICh Slope I
I-
I
I-
I I SF Avel HF ISE DpthlFroude
I-
NINorm Dp
i-
I "N"
I-
I X -Fall) LR Type Ch
2108.580
I I
1245.000
I
5.879 1250.879
I
757.00
I
20.37
I
6.45
I
1257.33 00
I
6.84
I
6.17
I
7.500
i I
000 00
I
1 .0
22.300 0196 0102 23 5.88 1.46 4.64 013 00 00 PIPE
2130.880
I I
1245.437
I
6.091 1251.528
I
757.00
I
19.70
I
6.03
I
1257.55 00
I
6.84
I
5.86
I
7.500
I I
000 00
I
1 .0
I-
20.771
I-
0196
I- I- 1- I- I-
0095
I-
20
I-
6.09
I-
1.36
I-
4.64
I-
013
I-
00 00
1-
PIPE
2151.651
I I
1245.844
i
6.428 1252.273
I
757.00
1
18.78
I
5.48
I
1257.75 00
I
6.84
i
5.25
I
7.500
I I
000 00
I
1 .0
I-
7.929
I-
0196
I- I- I- i- I-
0088
I-
07
I-
6.43
I-
1.19
I-
4.64
I-
013
I-
00 00
1-
PIPE
2159.580
I I
1246.000
I
6.841 1252.841
I
757.00
t
17.91
I
4.98
I
1257.82 00
I
6.84
I
4.25
I
7.500
I I
000 00
I
1 .0
TRANS STR 0775 0085 20 6.84 1.00 013 00 00 PIPE
2183.580
I I
1247.860 6.422
I
1254.282
I
757.00
I
15.77
I
3.86
I
1258.14 00
i
6.00
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
271.420
I-
0050
I- I- I- i- I-
0093
I-
2.52
I-
6.42
i-
1.13
I-
6.00
I-
013
I-
00 00
1-
BOX
2455.000
I I
1249.220
I
7.580 1256.800
I
757.00
I
15.77
I
3.86
I
1260.66 00
I
6.00
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
JUNCT STR
I-
0333
I- I- I- i- I-
0082
I-
05
I-
7.58
i-
1.13
I- I-
013
i-
00 00
I-
BOX
2461.000
I I
1249.420 8.179
t
1257.599
I
713.00
I
14.85 3.43
I I
1261.03 00.
I
6.00
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
489.000
i-
0050
I- I- I- I- I-
0082
I-
4.02
I-
8.18
I-
1.07
I-
6.00
I-
013
I-
00 00
1-
BOX
2950.000
I I
1251.870
I-
9.754
I
1261.624
I
713.00
I
14.85 3.43
I I
1265.05 00
t
6.00
i
8.00
I
6.000
I
8.000
I
00
I
0 .0
I-
6.000 0333
I- I- I- I- I-
0082
I-
05
i-
9.75
I-
1.07
I-
2.99
I-
013
I-
00 00
1-
BOX
2956.000
I I
1252.070 9.603
I
1261.673
I-
I
713.00
i
14.85 3.43
I I
1265.10 00
I
6.00
I
8.00
I
6.000
I
8.000
I
00
I
0 .0
I-
489.000
I-
0050
I- I- I- I-
0082
I-
4.02
I-
9.60
I-
1.07 6.00
I- -I-
013
i-
00 00
1-
BOX
01/23/03 H-12
01/23/03 H-13
FILE: FH-ULT.WSW W S P G W- CIVILDESIGN Version 14.01 PAGE 2
Program Package Serial Number: 1296
WATER SURFACE PROFILE LISTING Date: 1-23-2003 Time: 4:12:47
ULTIMATE FOOTHILL STORM DRAIN Q100
EAST OF HEMLOCK AVE
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeight/IBase Wtl INo Wth
Station I Elev I FT) I Elev I (CFS) I FPS) Head I Grd.E1.1 Elev 1 Depth I Width IDia.-FTlor I.D.1 ZL IPrs/Pip
I-
L/Elem ICh
I-
Slope I
I-
I
I- I-
I I
I- I- -I-
SF Avel HF ISE
I-
DpthlFroude
I-
NINorm
I-
Dp
I-
I "N"
I-
I X-Fa111
I
ZR Type Cki
I
3445.000
I
1254.510
I
11.188 1265.698
I I
713.00 14.85
i I
3.43 1269.12 00
I
6.00
I
8.00
I
6.000
I I
8.000 00
I
0 .0
I-
JUNCT STR
I-
0333
I- I- I- I- I- -I-
0069 .04
I-
11.19
i-
1.07
I- I-
013
I-
00 00
I-
BOX
I
3451.000
I
1254.710
I
11.788 1266.498
I I
684.00 13.61
I I
2.88 1269.37 00
I
6.62
I
00
I
8.000
I 1
000 00
1
1 .0
I-
489.000
I-
0050
I- I- I- I- I- -i-
0056 2.75
I-
11.79
I-
00
I-
7.11
I-
013
I-
00 00
1-
PIPE
I
3940.000
I
1257.160
I
12.088 1269.248
I I
684.00 13.61
I I
2.88 1272.12 00
I
6.62
I
00
I
8.000
I I
000 00
1
1 .0
6.000 0333 0056 .03 12.09 00 3.57 013 00 00 PIPE
I
3946.000
I
1257.360 11.922
I
1269.281
I I
684.00 13.61
I I
2.88 1272.16 00
I
6.62
I
00
I
8.000
I I
000 00
I
1 .0
I-
177.490
I-
0050
I- I- I- I- I- -I-
0056 1.00
I-
11.92
I-
00
I-
7.19
I-
013
I-
00 00
1-
PIPE
I
4123.490
I-
I
1258.240
I-
12.040
I-
I
1270.280
I-
I I
684.00
I-
13.61
I-
I I
2.88 1273.16
I- -I-
00
I-
I
6.62
I-
I
00
I-
I
8.000
I-
I I
000
I-
00
I
1 .0
I-
01/23/03 H-13
R
FILE: MODELI.WSW W S P G W - EDIT LISTING - Version 14.01 Date: 1-23-2003 Time: 5:30:55
WATER SURFACE PROFILE CHANNEL DEFINITION LISTING PAGE 1
CARD SECT CHN NO OF AVE PIER HEIGHT 1 BASE ZL ZR INV Y(l) Y(2) Y(3) Y(4) Y(5) Y(6) Y(7) Y(8) Y(9) Y(10)
CODE NO TYPE PIER/PIP WIDTH DIAMETER WIDTH DROP
CD 1 4 1 6.000
W S P G W PAGE NO 1
WATER SURFACE PROFILE - TITLE CARD LISTING
HEADING LINE NO 1 IS
HYDRAULICS @ Q25 MODEL 1
HEADING LINE NO 2 IS
INTERIM TRIBUTARY FLOW FROM BASELINE TO MILLER EAST OF HEMLOCK
HEADING LINE NO 3 IS
W S P G W PAGE NO 2
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO 1 IS A SYSTEM OUTLET
U/S DATA STATION INVERT SECT W S ELEV
9564.550 1228.480 1 1238.910
ELEMENT NO 2 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
9877.670 1230.610 1 013 000 000 000 0
ELEMENT NO 3 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
10050.000 1231.760 1 013 000 000 000 0
ELEMENT NO 4 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
10167.670 1232.580 1 013 000 000 000 0
ELEMENT NO 5 IS A SYSTEM HEADWORKS
U/S DATA STATION INVERT SECT W S ELEV
10167.670 1232.580 1 1232.580
01/23/03 H-14
FILE: MODELI.WSW W S P G W- CIVILDESIGN Version 14.01 PAGE 1
Program Package Serial Number: 1296
WATER SURFACE PROFILE LISTING Date: 1-23-2003 Time: 5:31: 0
HYDRAULICS @ Q25 MODEL 1
INTERIM TRIBUTARY FLOW FROM BASELINE TO MILLER EAST OF HEMLOCK
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeight/IBase Wtl INo Wth
Station I Elev I (FT) I Elev I (CFS) I (FPS) Head I Grd.El.l Elev I Depth I Width IDia.-FTlor I.D.I ZL IPrs/Pip
I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I
L/Elem ICh Slope I I I I SF Avel HF ISE DpthlFroude NINorm Dp I "N" I X -Fall) ZR IType Ch
I I I I I I I I I I I I I
9564.550 1228.480 10.430 1238.910 398.00 14.08 3.08 1241.99 .00 5.32 .00 6.000 .000 .00 1 .0
I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- 1-
313.120 .0068 .0088 2.77 10.43 .00 6.00 .013 .00 .00 PIPE
i I I I I I I I I I I I I
9877.670 1230.610 11.065 1241.675 398.00 14.08 3.08 1244.75 .00 5.32 .00 6.000 .000 .00 1 .0
172.330 .0067 .0088 1.52 11.07 .00 6.00 .013 .00 .00 PIPE
I I I I I I I I I I I I I
10050.000 1231.760 11.437 1243.197 398.00 14.08 3.08 1246.27 .00 5.32 .00 6.000 .000 .00 1 .0
I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- 1-
117.670 .0070 .0088 1.04 11.44 .00 6.00 .013 .00 .00 PIPE
I I I I I I I I I I I I I
10167.670 1232.580 11.657 1244.237 398.00 14.08 3.08 1247.31 .00 5.32 .00 6.000 .000 .00 1 .0
I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- I-
01/23/03 H-15
REFERENCES & MAPS
t
L
01/24/03 R-1
Ih wLLEY I -i-- _
d_I :R I WR2W rl : RIE _'— IT4N
W I I R W I R6W I I I R5W I
i4Wly
T°,30 I _
I
I N .n 1 w c
I I S /
T HE9PEfl1A
I _
I
a
l, ; r • '
I 1T4N - 5 T
I • 1 4 I ' I .L. wCar MIT I 1 I I ' 4 I I .
m' r ------
4
cL
t
1
1
c
ItMLur uA 'u•wxr
I 01
V I .+_ °R' 1 I @ E -I.. \ I. - 1.3
1 .'
c •!I d6
r '
1 -.I - -+ I - .
Lr v
4
a• Lo
4- 4-
T '\ e` I 9 .0 , Iz ~ ,I /
i
J I ..11i
LESN
x I •Y (__
1 '` rR'jF'i A
r -
I 1 - 1 , ' (• „RE'TC•e 't" - I i"- -f- -F- - . 4 - - -F - -F-
R•lON + SlixflT I I
J
1 „ acFy rt •. c 1.6 ' I ° I e181_ ,1• 16• 15 I ] I I Y 'i --IJ
4«
rt
II# I i ' -; i 1 I— I< I I
L7 I. I -t:'* \ of _ -' - - I 'l
t
c
l Y' I 9 I Z9,2 1 22 I I•/ I' •,"
L• \ • 2g _, 6 2 ,PA- " I r'a[/Y f LE I . «' I LT J I ' ' h 4^'
I I I I I I I Nlyr ]2 h'i • 34 I 6 li, •
y
I • I. '- I I ° i 1 I if I ./ la• A°i W . • I
MT •T:,NIO Y ••lp« ' i I I I '• •I• • \ r - •- - ^ - I
R 1.4 I _ .I• ..I ALOwIN L
ic--t
e ) L AINKOWNEAO •e_ -,ft.. '• E' . L ._
1 • • • -t_ -I
I -• _- --
I- . - i--- [ * - - ' *° - - (
i I - i
Ir - -
9 ..._ , - _ !' - _ - - a e i;TTY I I>\,
o .+F- I_ i. -1- • .GL -•
I I E IN LEANL 3•WSTNto , I I 1= - .... '' .-- — - - - f - °'`'
j I Mln F°R TTL IL, .Ec.ne. _ _ - - - (/•)
T2N - r4° 'I - - V • • - EY I --GHESLLkT I. '
Pe - •.( fI'•
1 i aI
s - - .- -- - +- -I - - "/.yylp
yp
A--
I - a..rnti - - `- °"; --yT .gl - c /
iii `= - -l 1' - i - J '' I I P•
1 I / 1 /-.
I_, _ LT I •', SV AFLOP -
t I
v . ` •
C '
I u
s IT
f `'
16
I•i ( ~ L2 tl(IIIN EMINYS I •^I
I ' ,
r _- _ J -N' i
I
11.4 ' •
t•-11} ` -7r - -+ - i• (/ 1 - }-•t•/-, '_t I- T- -
011[EK
r% I /
F 1•^rO` *- L'yJ._.. _ - y I- . .' j°`: - -r' _ .l „ -..I. - .k._ -I _ - _ai-' r _ - _ "AT
C4iI
77
d,
3 `
i '•` I; f.
4
1 •
i / i 'i -_ - - .+ \ I.r-
tet-'- -- F--: - - _ - • -LI: e:. ' ,rf t i. %•% I_ I:. 1 I I r t j O-' ~
e s '` ( - .
I.-
GAM
I.I I f', , • ,
ij'{'rp•ew = ay ; u • -
y - - _D -_! ` • cvtJ ` _ _ ` • --I- - I -C_ •~ -" :'' -'C
I. .. ..s ..v[ - r - - -""•I( '•-'__ -. '-I' - - - -rFfp
y
xf ..
11 lam. '/
T
OPY
SAN B RNAROIN I
1`,
t
LOIWTAA
I I ; I _•. - _a .°I i / ' I =. I'a 1 I ! '
r I f I° ( I t
stir
j• RGORNAUPLiAND• 4LE, ` •
R N ( 0 I ..d 1. i' w. _—.
R IJA LTO_ , i ACIP-- I CLAIg1afT nn°i , `• _ - _ I • L
ICVCA INA
TIS-'x - - ; _ 4 -
l"' .C• ` _ .0 IwoC •
TONS
z 9en,. .. — I __ .. \ -- `
ON T lO;ri•
I LANDS °. .pf t. .•' P T1 r
r'0. [ . • -I - - •' I ... - _ - ". _ I - , +.`. I -•-I
LOMA.. LINOA - w vf = ..•. - ' , -k y - y^ i - .
1 • I \" _I
O ' ` --- \I \ •_. _ •tln .v[ `..RA .1 1 {•
l , , _
OAK M / '( I '
t•. ,I• I li I - •
E
rrr,,,'•,,
h, 5.
r -
F-' I i I I I :crc I Tu INA i i ''
pO% ' ' -
OMNI TERM E I `.r
r I GO .- -
1'- I -
i: y xY_ JUNU - i 3' f \ •' /= _— —.. — I-' - i 11645
T r — - — _ - - •
yPi
RIE I
R E I' I
1:3 CHINO .• x I o»•oG'
I 1 • 4=':• 3 II I -- f. !AN IEERNAOINO °UM +•( • I
Rw4RamE CooNIT
TZS ( / i .T •' _ I I R S I D E •T[•r
C."
rtf • 9" -/ - - -' -j --- --. 8 _._ .' T-
o• --,. _ ? _ _ _ - - •' ..SER'. _ g I I 1 •t - _ •: -,_
i — i- — +- M I aP v . f : °: _ - •i 5 R 2 W \ R I
R•... If i
f
I atP, R 4w j I R 3 „
I ti f;t ,> ; s" FAN BERNNTR NO COUNTY
t - r -t- —I - - -r'
1 :',t,
J VALLEY AREA
I R5W= REDUCED DRAWING - JOJpRAO'o _
YEAR I HOUR
IF! 0O CONTROL` / SCALE 1'
4=
4 MILLS YYDED ON tl,SDG NA AA itlas 2.1973ASIN
C BERNARD
pL
j r t 1 m •Y
VAN i 81 INO COUNTY
FL
LEG EN t DATE 'LZ FILE NO. OIIY10. NO. I -'r A- ]°
j'.ZW. wRo-1 3 e1 12ISOlINESPRECIPITATION (INCHES) 1942
J%R 8 WA I RW R6 - - HYDROLOGY MANUALIITj.
iz
I 7 .,•.'
I I
RZE
RFE '— T4 -N
R2w Lf,igo _.L_
r - - y. _-...
RSW — — -_ — ,
R6w NEW _WA -- j _ Lti I I uT•3f) • b
LT RB I —_ R7W
i
I
I ...
I I 1 r -I- 7 -1--
V - -
I--/. _ _/
Y --,•-
Y I ; ( I p '
I
1.2 -I
A - , ,
abs!d
I -
gV6-
v+-
e
I +` T /
d. I
s
I _I ... I . I I ' _- - • //
T
l•7 -`jll; '
I PN"
I I -- - '-t' ' ,
wEar IT I I I .-_"•d- 1' i 1 -- I+- -i- __' , - "Le - - - I i, I 'I I ib11 : /
I I -I rsi.....° ( o I''`= I I _ _°
r '' -I t -I
T
fAT •—
f ^'— y.9- + - T3N'
77
TL I "i FO?', L
V '
pL _ - - >I ,r •'
jf<
0 a
IGm- I I I I - I- _I ,5._,DUE,i r cf 2, - . I,-} , I I ,
I lQ
I l .,ice. c.l ' : t _.-.- / - fTTp11
1 1 rcegl — I — _ — L-•i.:o+1 I - ° -I i / {
y/
SJ, 1 i
4- I ( I - J •- -- -
z I' :z `I• I
r.°+
I"Y- 1 - - ^-•"
4=1"i'"
ly
t -, -
y --! ._
rye- - •/ ' I I ' wLL
I
I ~ I •'Oy s
I ` - ' L
N I ' - ° ,y
a .`
c ,
BALD IY -`- IT
Q -I - r I ` I I -_
I ' • • - •'
EI _
71-
I -
LI • '
1
nwl+ L „•IsTZ Nr
T
7' .. "- [.
1
I I ` I •'(' -. I= -- ~ `'` ' r' - T __- IVY1Y1
VCE-_
1..•(
V1
f ' -y}-
r w I - l
I6RL'e2' iI'T
ec .... -I -. . •-''- - r ! • `
1 .°/' .• M1rrt TL cam# - ., ° I
I
I I.t ,. °• I e sn.IXe - -' I ,--- I• -`
L ..-. ` ! •I I f I
ARL
Is' I , g , , r -i- - " Yom, ,k7 , ' a ,- 1 _ -,'- --I)- _ _ '' ,I' I -" T. / -
cLi^+' . if
E
i l• - • :r tC- °' ,•
W`J - i _ { I , ' I Sr r " ')
l._ ' I ,._- -
r- --F/
J _`
G"- I- TI I
L - Z7 Awe t-4o$r - - I
e. tel:
l.3 S .1 '.°
1 I . r • f _ J- I - _!_ •c
Ax I I ` a I - `. / , e - • ' 1: - 7F - _
y,. =
f ' i"+so rt "o"
I---
T iI
r-!F,.;^
3
W - - i' J -
i.{II _C• `r-f ''"'
r `'',. I cr, - T +- =+-I•\ -'SI - 1
1 7 _„'f_ . ` ,+•- ,l• -.r:
L \
1--r:•- ••n'E:MT,.. _ ... /' • -_. I.i _ - AH}
GJ _ , 4 1 -. -J"I--
I
SA RNARDI O
TIN — r 1.7 I I Ls 4. I I "I 4` '
r `aV • ( i I —
TA I,Ir - ':i - _ -r' _ ` d~ - •- - - -E= ; f ~ `*'''" -
1 - .
UPL
i I> .. - - DNTAN - 1'. 's. - _ _ :j,, - .....»..••:
F ; Ir'<<, - 1 : I .
IL - isT•'j= - I CD LTDN `I -- •.;ip t°w` - RED LAN DS
I -
I•, _- -r8. 'E '? „ - ! -_ -_ 1 .L _ LOMA. LINOA `•-` - Ac .
oEF- oPFTUN
TIS •- -_ .-••: • T _ _ ' - _ - YUCAIrA i ' 1 I,G,L - DNTA 10b'" y1 - _ ,i • f .`'._ 4 ` _ "
I I.z - :..L _ - 1. -
IIe
I
1.2 - I \ _ i• . .,I, 5 1 YnANV TLNn.}cE
I
jf ' I:.nr` au A I'-. -•1 'fes `, } _T
T • . . ' •o[L .f' • `. i ' riP•..
1 ' _
r T _ _ uN SL•RNA OMO ° _ 1 / _
f . - :
IV;
E — _ _ ,
o , "+ , coTY
E R S I D
i _ • - I. ,.
I. ' ,
rte'%__ I I _ =- - _ 2WOERhV`RL)11i4
R.T
I
T25-, - - - R'vEq•. _ _ - I- °P5 R3 F
R 4 W V- -EY AREAr ;
t „• - - — r -j —' — -
ALS
i ' r — •
of
I- A_--...-.i, " ' „
I _ -
R UCED. DRAW Y,-IootYEARaOL.
HOUR
M Xowl. ED MILESSCALE14
I
T
I I _-
j __I "_r" -1 ..
I -• - -" -
1-
l _ __ - _ I —
1 '
PRECHES)
lr`a's 4
sd
1*82° coNTROL- IF -NIN
p COUNTY
SAN B R 1PITllTtON (INC
B ISOL'NES
u3fl ,., u L 1.T3S _i
I
t•
j
A L I
T; l
y,, , • • . ; it I .. ,: ---i--.-_.... ` I"i'! i
11 4.1
i Uj.' ._;........_
7.........;
r
J iI
lK
v:
I ; rbc
y :
1 411
ST
J
I
I
i__.........__ ......................_.._... .... L-----
t 'fvht.._0................... - -
a
Qs !'=192. _..fs.................
EXJ USING 50%
UNDEVELOPED
Qu =398 ofs
PROP. INTERIM
JFUTURE;-9
I
INV
13011301 1
EX. DETENTION BASIN
30" RCP
INTERIM
PER 'I i - - - ........... - I rnn7}j of uP \, - ...... _ ---...__._.... _...
T
1SI- I 12 8 INV {
1 ._.......
N
zz
I
Lj
a
UN
a
I
SCALE IN FEET
0 300 600 900 1200
PRELIMINARY REGIONAL
INTERIM HYDROLOGY MAP
PLANS PREPARED BY
MADOLE & ASSOCIATES, INC.
CONSULTING CIVIL ENGINEERSgarANDLANDPLANNERS
10601 CHURCH STREET, SUITE 107
RANCHO CUCAMONGA, CA 91730
909) 948-1311
LEGEND
INTERIM TRIBUTARY AREA
SUBAREA BOUNDARY
A2 SUBAREA NUMBER
AI.T INTERIM AREA
L=500' DISTANCE BETWEEN NODES
FLOW ARROW
02W 25 -YR STORM INTERIM FLOW
TRIBUTARY TO EXIST. 66" RCP
PRELIMINARY REGIONAL
INTERIM HYDROLOGY MAP
PLANS PREPARED BY
MADOLE & ASSOCIATES, INC.
CONSULTING CIVIL ENGINEERSgarANDLANDPLANNERS
10601 CHURCH STREET, SUITE 107
RANCHO CUCAMONGA, CA 91730
909) 948-1311
INTERIM HGL (025)
o $ — ` IN, RCp 5=0.005
zn — — — — 30
INTER HGL (025)--/5= .0050
wxN
025-713cfs,251NT=206cfs
INSTALL 445 L 8' % 6' RCB
30+00 31+00 32+00 33+00
6
Noo
z - - -
00 31+00 32+00 33+00
I - F— - -4—
to =
wxN U
CONSTRUCTION NOTES
0 INSTALL 66" RCP, D -LOAD PER PROFILE
O2 INSTALL S' % 6' RCB
O3 INSTALL 96" RCP, D -LOAD PER PROFILE
CONSTRUCT MANHOLE PER A.P.W.A. STD. 322-1.
50 CONSTRUCT MANHOLE PER A.P.W.A. STD. 320-1.
DIAL TWO W
BEFORE
ORKING
ORE DAYS BEFOREEFDIGYOuDIG
TOLL TREE
OUND SERVICE ALERTAPUBLICSERVICEBYUNDERGROUNDSERVICEALERT
025-684cfs, 0451NT=2060f:
INSTALL 489 F 90" RCP
Icfs, 0251NT=206cfs
177.49 LF 90" RCP
PROFILE
HDRIZ 1'= 40'
VERT 1- 4'
34+00 35+00 PLAN 1- 40' 6+00 37+00 38+00 39+00 40+00
SCALE IN FEET
0 40 80 120 160
5
5
x
U U
o 0
o ama +
34+00 35+00 36+00 37+00 38+00 39+00 40+00
r
41+00 42+00
I I I
Li I I
IQ
QZQ
I J I i
I iCAI
I
I
I
I 1
I 1 I
ELEVATION: r PRELIMINARY - NOT FOR CONSTRUCTION
0:
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
S
N. 62183
O E.P 9 -aa -o3 a
r9'f cp 6o
z
Prepared Under The Supervision Of :
raoaa NDINA PMOF
10B01 GHURCH STIW, SM. 107
RANCHO cucvaoNOA, CA 917'30
pryOME QiOH) WB 1911
Date :
w+46-(U C.L. MH
STORM DRAIN CONCEPTUAL PLANS
DR""" v FOOTHILL BLVD .
REGIONAL STORM
EAST OF HEMLOCK
SCALE.
Ern
DAIS:
artWD BY:
MJG
1271.0 IM—
2
2RCEW93Ew'a'
cl Y ENGINEER R.C.E. 1152 OATS
on
a
EXIST. GROUND
OVER PIPE— —
n
ULTIMATE HCL (0100)
ULTIMATE HGL (0100)
INTERIM HGL (025)
o $ — ` IN, RCp 5=0.005
zn — — — — 30
INTER HGL (025)--/5= .0050
wxN
025-713cfs,251NT=206cfs
INSTALL 445 L 8' % 6' RCB
30+00 31+00 32+00 33+00
6
Noo
z - - -
00 31+00 32+00 33+00
I - F— - -4—
to =
wxNU
CONSTRUCTION NOTES
0 INSTALL 66" RCP, D -LOAD PER PROFILE
O2 INSTALL S' % 6' RCB
O3 INSTALL 96" RCP, D -LOAD PER PROFILE
CONSTRUCT MANHOLE PER A.P.W.A. STD. 322-1.
50 CONSTRUCT MANHOLE PER A.P.W.A. STD. 320-1.
DIAL TWO W
BEFORE
ORKING
ORE DAYS BEFOREEFDIGYOuDIG
TOLL TREE
OUND SERVICE ALERTAPUBLICSERVICEBYUNDERGROUNDSERVICEALERT
025-684cfs, 0451NT=2060f:
INSTALL 489 F 90" RCP
Icfs, 0251NT=206cfs
177.49 LF 90" RCP
PROFILE
HDRIZ 1'= 40'
VERT 1- 4'
34+00 35+00 PLAN 1- 40' 6+00 37+00 38+00 39+00 40+00
SCALE IN FEET
0 40 80 120 160
5
5
x
U U
o 0
o ama +
34+00 35+00 36+00 37+00 38+00 39+00 40+00
r
41+00 42+00
I I I
Li I I
IQ
QZQ
I J I i
I iCAI
I
I
I
I 1
I 1 I
ELEVATION: r PRELIMINARY - NOT FOR CONSTRUCTION
REV" DESCRIPTION DATE ENOR, CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
S
N. 62183
O E.P 9 -aa -o3 a
r9'f cp 6o
z
Prepared Under The Supervision Of :
raoaa NDINA PMOF
10B01 GHURCH STIW, SM. 107
RANCHO cucvaoNOA, CA 917'30
pryOME QiOH) WB 1911
Date :
CITY OF FONTANA, CALIFORNIA
STORM DRAIN CONCEPTUAL PLANS
DR""" v FOOTHILL BLVD .
REGIONAL STORM
EAST OF HEMLOCK
SCALE.
OESIWD BY: MJG
DAIS:
artWD BY:
MJG
APPROM Br. DRAW= Na: 2
2RCEW93Ew'a'
cl Y ENGINEER R.C.E. 1152 OATS
J,
a
V,p
o_
N
65
EXIST. GROUNDOVERPIPE
v
ULTIMATE HCL (0100)
000 n
ULTIMATE HGL (p 100)
O
M
oZII
1258
JQ INTERIM HGL (025) t^ INTERIM HGL (025) G6R S=0.0050
tHt?
4y 3g I
A
I S=0.0050
124843 P 2y9 S=0.00 0 L
5=0.0050 o-
Z pGn+NNNR CaoC; °
o2
Z N Ntz
1245
Np 001 Nd N ri
N
N Y
d
andO+
N
Oi jm
LLN- +d wN
dT
NN d N
0100-757tfs,0251NT=206tfs 0100=75 cfs. 0251X7=206tfs Otoo=713cfs 0251X7=206cfs
INSTALL 51.00 LF 86" RCP INSTALL 27 42 LF 8' X 6' RCB INSTALL 489 LF 8• X 6' RCS
025= 13cfs, 0251NT=206cfs
PROFILE INSTAI L 44 LF 8' X 6' RCB
HORIz 1'= 40'
VERT 1'= a
20+00 21+00 22+00 23+00 24+00 25+00 PLAN 1'= 40' 6+00 27+00 28+00 29+00 30+00 31+00 32+00
HEMLOCK AVE. SCALE IN FEET a
I 0 40 80 120 160 II
X I I a 5 5
I
CONSTRUCTION NOTES
o
0
UN O1 INSTALL 66" RCP, D -LOAD PER PROFILE
N
o0 o INSTALL 8' X 6' RCB
m
v
N
N 0 O3 INSTALL 96" RCP, 0 -LOAD PER PROFILE
1 2 2 2
M CONSTRUCT MANHOLE PER A.P.W.A. STD. 322-1.
20+00 21+0 22+00 23+00 2a+00 25+00 26+00 27+00 28+00 29+00 30 n z 5 CONSTRUCT MANHOLE PER AP. W.A. STD. 320-1. I - r - r - r— - _ - - - w
M Z W
U N
5
0
N
O
I Iml
1
I I 4I 1
FOOTHILL BLVD.
BEN91 MAN: # BASIS OF 8EAPoNGS:
PRELIMINARY - NOT FOR CONSTRUCTIONEUVADON. •
aEY RE"SPO'+ DESCRwRON DATE ENOR. aTY Of SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA
IJ,)
T'lao-) T COMMENCE WITHIN TWO YEARS OF THE DATE OFAPPROVAL 2 s
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, Na, 62183 w
g
PrAp"m ON offm OF
10801 CHURCH STREET.IiTE./07
STORM DRAIN CONCEPTUAL PLANS
r.
v FOOTHILL BLVD. JV i"=40'
DIAL TWO WORKING THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO a E.p 9-30-05 , PHONE« 948-13119173° uvcNED BY: REGIONAL STORM DATE:
BEFORE DAYS BEFORE 0 s MJG EAST OF HEMLOCKYOUDIGr0uDIGctvl ?
mac
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND CAl\F Dote : CNEE(ED BY APPROVED BC DRAWING NO.: 1TOLLFREE
M)ND SERVICEAPUBLICSERVICEBYUNDERGROUNDSERVICE ALERTALERT STANDARDS IN EFFECT. RCEOM83 EXP. MJG 2ITVENGINEERR.C.E. 511 DATE
Ln
1250. 000 cr.
1248. 000
1246.000
1244. 000
i
1242. 000
I
1240. 000
1238. 000
u)
1236. 000
ao
1234. 000 ti
1232. 000
1230. 000
1228. 000
ELEVATIONS 0
u-)
U-)
4
ON
WATER SURFACE PRESSURE GRADIENT ANALYSIS
MODEL 1 HYDRAULIC EXHIBIT
N N
4 4
U U
co
FS OVER EXISTING 72" RCP I
HGL (Q25 398 cfs)
Ln
co
00
0
r-
0
o
r-
D
D 0
r u) o
ao
o
0 0
m
EXCERPT E FOOTHILL BLVD & BEECH AVENUE IMPROVEMENT PLANS
EXHIBITS
EXHIBIT A: PRE- PROJECT CONDITION RATIONAL METHOD HYDROLOGY MAP
41660 IVY STREET, SUITE A
MURRIETA, CA 92562
PH. 951.304.9552 FAX 951.304.3568
Engineering & Consulting, Inc.
EXHIBIT B: POST- PROJECT CONDITION RATIONAL METHOD HYDROLOGY MAP
41660 IVY STREET, SUITE A
MURRIETA, CA 92562
PH. 951.304.9552 FAX 951.304.3568
Engineering & Consulting, Inc.
EXHIBIT C: DRAINAGE FACILITIES MAP
41660 IVY STREET, SUITE A
MURRIETA, CA 92562
PH. 951.304.9552 FAX 951.304.3568
Engineering & Consulting, Inc.