HomeMy WebLinkAboutAppendix L - Trip Distribution GraphicsThis technical memorandum provides an evaluation of the proposed Project located at 14387 Valley Blvd,
Fontana. The purpose of this analysis is to determine whether the Project generates enough trips to area
intersections to be subject to implementation of Transportation mitigation measures from the Southwest
Industrial Park (SWIP) EIR. The existing 4.7-acre site is occupied with a truck trailer storage use. The Project
proposes to replace the existing storage use with a warehouse totaling 96,100 square feet (sf).
The following distribution graphics have been prepared based on the SWIP EIR Trip Distribution which is
included as Figure 1, SWIP EIR Trip Distribution. A trip assignment was conducted to include the intersections
and segments identified in the SWIP within 0.5 mile of the proposed Project. The 0.5-mile radius was utilized
as those intersections and segments would receive the highest number of trips from the proposed Project.
Based on the City’s TIA Guidelines, the proposed Project would be required to analyze intersections and
segments if it generates over 50 trips at any of the intersections or segments identified. The trip assignment
included two scenarios: the proposed Project without existing trips and the proposed Project with existing
trips. As shown in Figures 2 through 5 below, the proposed Project would not result in enough trips to impact
any of the intersections and segments included. The maximum number of trips would be in the PM scenario
without existing trips (included as Figure 4, Project Trips PM with Existing Trip Credits) would result in 24 PM
peak hour trips. Thus, further analysis is not required and no new deficiencies would be expected. Therefore
the Project would not be required to implement the SWIP Transportation mitigation measures.
To: City of Fontana Engineering Department
From: Abby Pal, Senior Transportation Planner
Date: 2/3/2023
Site: 14387 Valley Blvd Fontana
Subject: Trip Distribution Graphics
14387 Valley Blvd Fontana Warehouse Development
Trip Distribution Figures
Figure 1 SWIP EIR Trip Distribution
14387 Valley Blvd Fontana Warehouse Development
Trip Distribution Figures
Figure 2 Project Trips AM Without Existing Trip Credits
14387 Valley Blvd Fontana Warehouse Development
Trip Distribution Figures
Figure 3 Project Trips AM With Existing Trip Credits
14387 Valley Blvd Fontana Warehouse Development
Trip Distribution Figures
Figure 4 Project Trips PM Without Existing Trip Credits
14387 Valley Blvd Fontana Warehouse Development
Trip Distribution Figures
Figure 5 Project Trips PM with Existing Trip Credits