Loading...
HomeMy WebLinkAbout5862-1GA ION RANCH NAPA VALLEY ROAD STA. 10+50 TO ;3f+UU MONTELENA ROAD VENETO DRIVE STA STA. 10+50 TO 37+00 . 10+50 TO 35+80 INTERNAL STREETSCAPE LANDSCAPE PLANS CITY OF FONTANA, CALIFORNIA LENNAR HOMES 98o montecito Dr. #302 � III II�II I� Ins ,%'�; III II�II It' T I� SPECIFICATION NOTE: The City of Fontana "Standard Landscape Specification Manual for Streetscapes and the Park Design Standards" that are in force at the time of the approval of these landscape plans shall become a part of this document. In case of a discrepancy between the. City Standards and the approved plans, the City standards will supersede approved plans. Any items deemed not acceptable, or not in compliance with these specifications shall be reworked to the satisfaction of the Agency's Authorized Representative. (ref. Section 3000 (L-71) of the Standard Landscape Specification Manual). This note shall exclude any special design elements, product and/or material specifications within these plans that are approved as acceptable substitutions by the Public Works Department at the time of drawing approval and includes the following items: DG STABILIZER - SOUL -SECURE ORGANIC SOIL BINDER Approved substitutions by Dan West -Public Works Manager Date City Required Notes: Inspections: ivision's Landscape Inspector.48 hours prior to desired inspection of an item at (909) 350-6632 1. It is the Landscape Contractors responsibility to contact the Engineering D 2. Prior to the release of utilities or maintenance period commencement, the following inspections are required: Pre -construction meeting Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test @ 150 p.s.i. for a three (3) hour period. Irrigation coverage tests including initial and final tests. Finish grade prior to planting. Plant materials prior to planting. Planting, including street trees. Contact the Parks Planning. and Landscape Development section Engineering Division, for species and final locations. Compliance with approved plans. Final Inspection. each inspection. The City of Fontana "Standard Landscape Specification Manual for Streetscapes" shall 3. The Owner's representative and Landscape Contractor shall be present at become a part of this document. Maintenance Guidelines Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape ,maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working condition. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition. S. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of a minimum of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. SOILS REPORT NOTE: After grading of site is complete, soils report will be prepared and provided by owner to contractor for his information prior to construction. Upon completion of project, owner will provide report to city inspector for record purposes. CITY REQ. NOTES & STATEMENTS: A. B. For soils less than 6% organic matter in the top 6 inches of soil, compost at a rate of a minimum of four cubic yards per 1,000 square feet of permeable area shall be incorporated to depth of six inches into the soil. C. At the time of final inspection, the permit applicant must provide the owner of the pt rop' e with a certificate of completion, certificate of installation, and an irrigation schedule o landscape and maintenance. D. Recirculating water systems shall be used for water' features. E. Pressure regulating devices are required if water pressure is below or exceeds the recommended pressure of the specified irrigation devices. F. Check valves or anti -drain valves are required on all sprinkler heads where low point drainage could occur. G. A diagram of the irrigation plan showing hydro -zones shall be kept with the irrigation controller for subsequent management purposes. 1-1. A Certificate of Completion shall be filled out and certified by either the designer of the landscape plans, irrigation plans, or the licensed landscape contractor for the project. I. No Certificate of occupancy shall be issued until a city landscape inspector has verified that all irrigation, grading and planting have been completed in accordance with the approved plans and specifications of Section 28-117 within the City of Fontana Landscape Ordinance #1734. ). An irrigation audit report shall be completed per Section 2 8- 106 within the City of Fontana Landscape Ordinance 41734 at the time of final inspection. K. With regards to landscape maintenance districts or public landscape, it shall be the responsibility of the developer to comply with Section 28-118 Special Landscape Maintenance District Requirements within the City of Fontana Landscape Ordinance 41734. Underground Service Alert 6E ORE YOG y o o Call: TOLL FREE 1-800 422-4133 SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER. C IC SEE SHEET L2, L14, L21 & L27 SEE SHEET L6, L18; L25 & L31 SEE SHEET L3, L15, L22 & L28 Jr✓z 3111 L L', L19, L26 & L32 Ac!I11L N.T.S. SEE SHEET L4, SEE SHEET L5, L17, L24 & L30 N.T.S. ni �� LC II� III IhIII III � �!% T COVER SHEET L1 CONSTRUCTION NOTES & LEGEND L2 CONSTRUCTION PLAN L3 CONSTRUCTION PLAN L4 CONSTRUCTION PLAN L5 CONSTRUCTION PLAN L6 CONSTRUCTION PLAN L7 CONSTRUCTION PLAN L8 CONSTRUCTION DETAILS L9 IRRIGATION NOTES, LEGEND & DETAILS L10 IRRIGATION DETAILS L1 I IRRIGATION DETAILS, CALLS. & SCHEDULES L12 IRRIGATION CALCULATION & SCHEDULES L 13 IRRIGATION MAINLINE MASTER PLAN L14 IRRIGATION PLAN L15 IRRIGATION PLAN L16 IRRIGATION PLAN L17 IRRIGATION PLAN L18 IRRIGATION PLAN L19 IRRIGATION PLAN L20 PLANTING NOTES, LEGEND & DETAILS L21 PLANTING PLAN (TREES & GROUNDCOVER) L22 PLANTING PLAN (TREES & GROUNDCOVER) L23 PLANTING PLAN (TREES & GROUNDCOVER) L24 PLANTING PLAN (TREES & GROUNDCOVER) L25 PLANTING PLAN (TREES & GROUNDCOVER) L26 PLANTING PLAN (TREES & GROUNDCOVER) L27 PLANTING PLAN (SHRUBS & VINES) L28 PLANTING PLAN (SHRUBS & VINES) L29 PLANTING PLAN (SHRUBS & VINES) L30 PLANTING PLAN (SHRUBS & VINES) L31 PLANTING PLAN (SHRUBS & VINES) L32 PLANTING PLAN (SHRUBS & VINES) L33 SPECIFICATIONS Streetscape planter area = 1921748 S.F. Total square footage of landscape area = 192,748 S.F. yNSDS Cgpe p P pAIJA Fi`pC` 2782 w � MuNAIUM 03/05/19DATE �Q to F OF CA��F S I T E S C A P E S Landscape 3190 B2 Airport Loop Dr., (949) 644-9370 Architecture Costa Mesa, CA. 92626 FAX (714) 210-3140 & Planning Richard Polhamus, License # 2782 Imo, III ��� �� �p IiIi 'F � C1 It I III 'il� 0 DPPiIo5p!a�l EN N 0 A COMPLIANCE STATEMENT I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE STATE MODEL WATER EFFICIENT LANDSCAPE ORDINANCE AND HAVE SUBMITTED A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE. I HAVE COMPLIED WITH THE CRITERIA OF THE ORDINANCE AND APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE AND GRADING DESIGN PLAN. AT THE TIME OF FINAL INSPECTION, THE PERMIT APPLICANT MUST PROVIDE THE OWNER OF THE PROPERTY WITH A CERTIFICATE OF COMPLETION, CERTIFICATE OF INSTALLATION, AND AN IRRIGATION SCHEDULE OF LANDSCAPE MAINTENANCE. 9/3/19 —- RICK POLHAMUS LA112782 EXP. 10119 DATE JOB NO. CITY OF FONTANA 19-003 El— LANDSCAPE PLANS DRAWNBY'. t_7l1LS1V1V 1\t11Vt.11iiviuiu�.+�.�- ATE DBD'D"B°sY' TITLE SHEET / / 1 CHECKED BY: APPROVED BY'. lE SCAIE AS SHOWN °',IZill1 pA DWG. NO I Z wO > F U U Q 0 Ir H Z g a ZZ r z N> N N Q U Z N Z Z U U Z ago Z Q a: Q y OU a.0 N UU W CDzQ m N v rn a ga U O Q oO w a Um W m F O U U0 (ifWN = F- C=.) Q Q E co Zw 3" W N dof Q Z LSPC # 19-000048